Differences between revisions 21 and 22
Revision 21 as of 2021-02-26 14:56:27
Size: 1973
Comment:
Revision 22 as of 2021-02-26 14:58:39
Size: 2086
Comment:
Deletions are marked like this. Additions are marked like this.
Line 43: Line 43:
 * Replacement of LVDT coils for F0 in EX.
Line 46: Line 48:
 * Investigation and recovery of IMC suspensions are requested.

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date : 13:30-

Participants : Takahashi, Ikeda, Miyo, Tomaru, Aso, Kimura, Hirata, Sato

Post O3 Upgrade portal

Schedule

  • IX: Setting Oplev by 3/10. Preparing additional spring for BF.
  • IY: Disconnection is scheduled on 3/11.
  • EX: Connection is scheduled in the week of 3/15.

Status

  • Corrugate tube fixing jig: Started the vent of IYV chamber on 26th. Re-measurement is on going in 2/25-3/2 at IYV.
  • Commissioning in air: Commissioning of IX will be delay. From April?
  • Commissioning in vacuum: From May?
  • Acceptance check: Cryo-payload in IX/EX and Type-A tower in EY/IX are on going.
  • PF actuator: Not evaluated in IX, but after the commissioning for suspension.
  • Jig for FC painting: Assembling.
  • Overall commissioning: To be considered about personnel.


VIS Meeting

14:00-

Participants:

Schedule

  • Chart

  • Type-A team: IXV in 3/1-3, IMC in 3/4-5
  • Type-B team: EXV in 3/1-2, PR3 in 3/3-5

Progress report

<< <  2021 / 2 >  >>
Mon Tue Wed Thu Fri Sat Sun
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28

TypeA

  • Replacement of LVDT coils for F0 in EX.

TypeB

TypeBp

TypeC

  • Investigation and recovery of IMC suspensions are requested.

Electronics

Control

Safety

Discussion

Travel Plans

The week from 3/1

  • Takahashi: 3/1-5
  • Sato: 3/1-5
  • Hirata: 3/1-5
  • Yano: 3/1-5

The week from 3/8

  • Takahashi: 3/8-3/12
  • Sato: 3/8-3/12
  • Hirata: 3/8-3/12
  • Yano: 3/8-3/12

Next meeting

  • 2021/3/5(FRI)

KAGRA/Subgroups/VIS/VISMinutes20210226 (last edited 2021-02-26 15:00:01 by RyutaroTakahashi)