Line 3: Line 3:
= Agenda/Minutes on 2021/1/29 = = Agenda/Minutes =
Line 6: Line 6:
<<MonthCalendar(,2021,2)>>
Line 9: Line 8:
13:30-14:00 Date : 13:30-13:45
Line 11: Line 10:
Participants: Participants : Takahashi, Ikeda, Miyo, Tomaru, Aso, Kimura, Hirata, Sato
Line 14: Line 13:

== Schedule ==
 * IX: Setting Oplev by 3/10. Preparing additional spring for BF.
 * IY: Disconnection is scheduled on 3/11.
 * EX: Connection is scheduled in the week of 3/15.

== Status ==
 * Corrugate tube fixing jig: Started the vent of IYV chamber on 26th. Re-measurement is on going in 2/25-3/2 at IYV.
 * Commissioning in air: Commissioning of IX will be delay. From April?
 * Commissioning in vacuum: From May?
 * Acceptance check: Cryo-payload in IX/EX and Type-A tower in EY/IX are on going.
 * PF actuator: Not evaluated in IX, but after the commissioning for suspension.
 * Jig for FC painting: Assembling.
 * Overall commissioning: To be considered about personnel.
Line 18: Line 31:
14:00-16:00 14:00-14:30
Line 20: Line 33:
Participants: Participants: Takahashi, Hirata, Miyo, Sato, Fabian, Sugiyama, Ishizaki, Aso, Terrence, Tanaka

== Schedule ==
 * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11475|Chart]]
 * Type-A team: IXV in 3/1-3, IMC in 3/4-5
 * Type-B team: EXV in 3/1-2, PR3 in 3/3-5
Line 23: Line 41:
<<MonthCalendar(,2021,2)>>
=== TypeA ===
 * Replacement of LVDT coils for F0 in EX.
Line 24: Line 45:
=== General ===

=== Type-A ===
=== Type-B ===
=== Type-Bp ===

=== Type-C ===
=== Controls ===
=== TypeB ===
=== TypeBp ===
=== TypeC ===
 * Investigation and recovery of IMC suspensions are requested.
Line 34: Line 51:

== Towards O4 ==
=== Control ===
Line 39: Line 55:
 * O3GK Noise Budget : Seismic noise through the Type-A tower
  * [[https://gokagra.slack.com/archives/C015M111B5G/p1611978135005400]]
  * Calculation for the ETMY : much smaller than O3GK sensitivity, but larger than the design sensitivity
Line 41: Line 60:
The week from 3/1

 * Takahashi: 3/1-5
 * Sato: 3/1-5
 * Hirata: 3/1-5
 * Yano: 3/1-5

The week from 3/8

 * Takahashi: 3/8-3/12
 * Sato: 3/8-3/12
 * Hirata: 3/8-3/12
 * Yano: 3/8-3/12
Line 42: Line 75:
 * 2021/3/5(FRI)

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date : 13:30-13:45

Participants : Takahashi, Ikeda, Miyo, Tomaru, Aso, Kimura, Hirata, Sato

Post O3 Upgrade portal

Schedule

  • IX: Setting Oplev by 3/10. Preparing additional spring for BF.
  • IY: Disconnection is scheduled on 3/11.
  • EX: Connection is scheduled in the week of 3/15.

Status

  • Corrugate tube fixing jig: Started the vent of IYV chamber on 26th. Re-measurement is on going in 2/25-3/2 at IYV.
  • Commissioning in air: Commissioning of IX will be delay. From April?
  • Commissioning in vacuum: From May?
  • Acceptance check: Cryo-payload in IX/EX and Type-A tower in EY/IX are on going.
  • PF actuator: Not evaluated in IX, but after the commissioning for suspension.
  • Jig for FC painting: Assembling.
  • Overall commissioning: To be considered about personnel.


VIS Meeting

14:00-14:30

Participants: Takahashi, Hirata, Miyo, Sato, Fabian, Sugiyama, Ishizaki, Aso, Terrence, Tanaka

Schedule

  • Chart

  • Type-A team: IXV in 3/1-3, IMC in 3/4-5
  • Type-B team: EXV in 3/1-2, PR3 in 3/3-5

Progress report

<< <  2021 / 2 >  >>
Mon Tue Wed Thu Fri Sat Sun
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28

TypeA

  • Replacement of LVDT coils for F0 in EX.

TypeB

TypeBp

TypeC

  • Investigation and recovery of IMC suspensions are requested.

Electronics

Control

Safety

Discussion

Travel Plans

The week from 3/1

  • Takahashi: 3/1-5
  • Sato: 3/1-5
  • Hirata: 3/1-5
  • Yano: 3/1-5

The week from 3/8

  • Takahashi: 3/8-3/12
  • Sato: 3/8-3/12
  • Hirata: 3/8-3/12
  • Yano: 3/8-3/12

Next meeting

  • 2021/3/5(FRI)

KAGRA/Subgroups/VIS/VISMinutes20210226 (last edited 2021-02-26 15:00:01 by RyutaroTakahashi)