Line 8: Line 8:
Date : 13:30-13:45 Date : 13:30-
Line 15: Line 15:
 * IX: Setting Oplev by 3/10. Preparing additional spring for BF.
 * IY: Disconnection is scheduled on 3/11.
 * IX: Oplev setting will be finished by 3/10. Mystery of 5-kg overload. The ballast on the F0 is too tall.
 * IY: The vent was finished on 3/2. Disconnection is scheduled on 3/11.
Line 20: Line 20:
 * Corrugate tube fixing jig: Started the vent of IYV chamber on 26th. Re-measurement is on going in 2/25-3/2 at IYV.
 * Commissioning in air: Commissioning of IX will be delay. From April?
 * Corrugate tube fixing jig: Re-measurement was performed in 2/25-3/2 at IYV.
 * Commissioning in air: Commissioning of ITMX is delay. From April?
Line 25: Line 25:
 * Jig for FC painting: Assembling.
 * Overall commissioning: To be considered about personnel.
 * Jig for FC painting:
 * Overall commissioning: Schedule meeting is requested (after JPS meeting?).
Line 28: Line 28:
Discussion
 * [Miyo] オフロード作業を無くすためのアイデア
  * 問題意識:真空圧力が変わるとIPが傾いてPayloadが自身のEQフレームに当たる。傾かないようにする治具の再検討難しいので、傾いても大丈夫なアイデアがほしい。
   1. IPが傾かないようなチャンバーを支える治具の再検討(これは別の話

   2. そもそも、IPが傾いてEQストップに当たった状態でもPayloadも当たらないよう十分に退避させれば良い話に思える。その場合、IPがEQに当たった状態でFRをつかってもとに戻せるかどうか確認すべき。これはAcceptanceCheckに追加すべきか?
== Discussion ==
 * [Miyo] オフロード作業を無くすためのアイデア募集
  * 問題意識:真空圧力が変わるとIPが傾いてPayloadが自身のEQフレームに当たる。(完全に傾かないようにする治具はそもそも不可能なので、傾いても大丈夫なアイデアがほしい。)
  * [Miyo] そもそも、IPが傾いてIPのEQストップに当たった状態でもPayloadも同じく当たらないよう十分に退避させれば良い話に思える。その場合、IPがEQに当たった状態でFRをつかってもとに戻せるかどうか確認すべき。これはAcceptanceCheckに追加すべきか?
Line 37: Line 36:
14:00-14:30 14:00-
Line 39: Line 38:
Participants: Takahashi, Hirata, Miyo, Sato, Fabian, Sugiyama, Ishizaki, Aso, Terrence, Tanaka Participants:
Line 42: Line 41:
 * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11475|Chart]]
 * Type-A team: IXV in 3/1-3, IMC in 3/4-5
 * Type-B team: EXV in 3/1-2, PR3 in 3/3-5
[[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/VIS/Schedule|Schedule]]

== klog ==
'''EX'''
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16142|16142]] IP and F0 stepper motor limit switches. , __fabian.arellano__
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16084|16084]] Remedy of F0 , __ryutaro.takahashi__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16100|16100]] Comment , __ryutaro.takahashi__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16116|16116]] Comment , __fabian.arellano__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16128|16128]] Comment , __fabian.arellano__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16139|16139]] Comment , __fabian.arellano__
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16142|16142]] IP and F0 stepper motor limit switches. , __fabian.arellano__
  * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16159|16159]] Comment , __fabian.arellano__
'''General'''
 * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16144|16144]] I turned off the electronics in VIS racks in the central room. , __fabian.arellano__
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16036|16036]] Cabling for temperature control equipment , __satoru.ikeda__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16114|16114]] Comment , __satoru.ikeda__
'''IX'''
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16118|16118]] Setup of filter chain , __ryutaro.takahashi__
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16118|16118]] Setup of filter chain , __ryutaro.takahashi__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16127|16127]] Comment , __ryutaro.takahashi__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16138|16138]] Comment , __ryutaro.takahashi__
  * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16156|16156]] Comment , __ryutaro.takahashi__
'''IY'''
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16091|16091]] Monitoring of IP by ITMY venting , __satoru.ikeda__
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16106|16106]] Comment , __satoru.ikeda__
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16107|16107]] Comment , __kouseki.miyo__
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16115|16115]] Comment , __satoru.ikeda__
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16119|16119]] Comment , __satoru.ikeda__
'''MCE'''
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16101|16101]] Preparation for fixing the MCe coil cable , __naohisa.satou__
'''MCF'''
 * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16157|16157]] Investigation of IMC suspensions , __ryutaro.takahashi__
'''PR3'''
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15976|15976]] Picomotor of PR3_BF_T(Motor2) got stuck , __satoru.ikeda__
  * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16162|16162]] Comment , __fabian.arellano__
Line 47: Line 78:
<<MonthCalendar(,2021,2)>>
Line 49: Line 79:
 * Replacement of LVDT coils for F0 in EX.  * Replacement of LVDT coils for F0 was finished in EX.
 * Tuning of the filter chain is on going in IX.
Line 54: Line 85:
 * Investigation and recovery of IMC suspensions are requested.  * Investigation and recovery of the IMC suspensions were performed on 3/4.
Line 61: Line 92:
 * O3GK Noise Budget : Seismic noise through the Type-A tower
  * [[https://gokagra.slack.com/archives/C015M111B5G/p1611978135005400]]
  * Calculation for the ETMY : much smaller than O3GK sensitivity, but larger than the design sensitivity
Line 66: Line 94:
The week from 3/1

 * Takahashi: 3/1-5
 * Sato: 3/1-5
 * Hirata: 3/1-5
 * Yano: 3/1-5
Line 80: Line 101:
The week from 3/15

 * Takahashi: 3/15-18
 * Sato: 3/15-19
 * Hirata: 3/15-19
 * Yano: 3/15-19
Line 81: Line 109:
 * 2021/3/5(FRI)  * 2021/3/12(FRI)

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date : 13:30-

Participants :

Post O3 Upgrade portal

Schedule

  • IX: Oplev setting will be finished by 3/10. Mystery of 5-kg overload. The ballast on the F0 is too tall.
  • IY: The vent was finished on 3/2. Disconnection is scheduled on 3/11.
  • EX: Connection is scheduled in the week of 3/15.

Status

  • Corrugate tube fixing jig: Re-measurement was performed in 2/25-3/2 at IYV.
  • Commissioning in air: Commissioning of ITMX is delay. From April?
  • Commissioning in vacuum: From May?
  • Acceptance check: Cryo-payload in IX/EX and Type-A tower in EY/IX are on going.
  • PF actuator: Not evaluated in IX, but after the commissioning for suspension.
  • Jig for FC painting:
  • Overall commissioning: Schedule meeting is requested (after JPS meeting?).

Discussion

  • [Miyo] オフロード作業を無くすためのアイデア募集
    • 問題意識:真空圧力が変わるとIPが傾いてPayloadが自身のEQフレームに当たる。(完全に傾かないようにする治具はそもそも不可能なので、傾いても大丈夫なアイデアがほしい。)
    • [Miyo] そもそも、IPが傾いてIPのEQストップに当たった状態でもPayloadも同じく当たらないよう十分に退避させれば良い話に思える。その場合、IPがEQに当たった状態でFRをつかってもとに戻せるかどうか確認すべき。これはAcceptanceCheckに追加すべきか?


VIS Meeting

14:00-

Participants:

Schedule

Schedule

klog

EX

  • 16142 IP and F0 stepper motor limit switches. , fabian.arellano

  • 16084 Remedy of F0 , ryutaro.takahashi

    • 16100 Comment , ryutaro.takahashi

    • 16116 Comment , fabian.arellano

    • 16128 Comment , fabian.arellano

    • 16139 Comment , fabian.arellano

  • 16142 IP and F0 stepper motor limit switches. , fabian.arellano

    • (!) 16159 Comment , fabian.arellano

General

  • (!) 16144 I turned off the electronics in VIS racks in the central room. , fabian.arellano

  • 16036 Cabling for temperature control equipment , satoru.ikeda

    • 16114 Comment , satoru.ikeda

IX

  • 16118 Setup of filter chain , ryutaro.takahashi

  • 16118 Setup of filter chain , ryutaro.takahashi

    • 16127 Comment , ryutaro.takahashi

    • 16138 Comment , ryutaro.takahashi

    • (!) 16156 Comment , ryutaro.takahashi

IY

  • 16091 Monitoring of IP by ITMY venting , satoru.ikeda

  • 16106 Comment , satoru.ikeda

  • 16107 Comment , kouseki.miyo

  • 16115 Comment , satoru.ikeda

  • 16119 Comment , satoru.ikeda

MCE

  • 16101 Preparation for fixing the MCe coil cable , naohisa.satou

MCF

  • (!) 16157 Investigation of IMC suspensions , ryutaro.takahashi

PR3

  • 15976 Picomotor of PR3_BF_T(Motor2) got stuck , satoru.ikeda

    • (!) 16162 Comment , fabian.arellano

Progress report

TypeA

  • Replacement of LVDT coils for F0 was finished in EX.
  • Tuning of the filter chain is on going in IX.

TypeB

TypeBp

TypeC

  • Investigation and recovery of the IMC suspensions were performed on 3/4.

Electronics

Control

Safety

Discussion

Travel Plans

The week from 3/8

  • Takahashi: 3/8-3/12
  • Sato: 3/8-3/12
  • Hirata: 3/8-3/12
  • Yano: 3/8-3/12

The week from 3/15

  • Takahashi: 3/15-18
  • Sato: 3/15-19
  • Hirata: 3/15-19
  • Yano: 3/15-19

Next meeting

  • 2021/3/12(FRI)