8143
Comment:
|
4416
|
Deletions are marked like this. | Additions are marked like this. |
Line 8: | Line 8: |
Date : 13:30-13:45 | Date : 13:30- |
Line 15: | Line 15: |
* IX: Setting Oplev by 3/10. Preparing additional spring for BF. * IY: Disconnection is scheduled on 3/11. |
* IX: Oplev setting will be finished by 3/10. Mystery of 5-kg overload. The ballast on the F0 is too tall. * IY: The vent was finished on 3/2. Disconnection is scheduled on 3/11. |
Line 20: | Line 20: |
* Corrugate tube fixing jig: Started the vent of IYV chamber on 26th. Re-measurement is on going in 2/25-3/2 at IYV. * Commissioning in air: Commissioning of IX will be delay. From April? |
* Corrugate tube fixing jig: Re-measurement was performed in 2/25-3/2 at IYV. * Commissioning in air: Commissioning of ITMX is delay. From April? |
Line 25: | Line 25: |
* Jig for FC painting: Assembling. * Overall commissioning: To be considered about personnel. |
* Jig for FC painting: * Overall commissioning: Schedule meeting is requested (after JPS meeting?). |
Line 38: | Line 38: |
Participants: Takahashi, Hirata, Miyo, Sato, Fabian, Sugiyama, Ishizaki, Aso, Terrence, Tanaka | Participants: |
Line 41: | Line 41: |
||'''KAGRA'''||'''Suspension-wise''' || '''People-wise''' || || [[https://dacgit.icrr.u-tokyo.ac.jp/projects/kagra/issues/gantt|All schedule]] ||[[https://dacgit.icrr.u-tokyo.ac.jp/projects/kagra/issues/gantt?action=show&controller=gantts&f%5B%5D=status_id&f%5B%5D=subject&f%5B%5D=&gantt=1&month=3&months=6&op%5Bstatus_id%5D=o&op%5Bsubject%5D=~&project_id=kagra&query%5Bdraw_progress_line%5D=0&query%5Bdraw_relations%5D=1&set_filter=1&utf8=%E2%9C%93&v%5Bsubject%5D%5B%5D=%5BETMX%5D&year=2021&zoom=2|ETMX]] || || || ||[[https://dacgit.icrr.u-tokyo.ac.jp/projects/kagra/issues/gantt?action=show&controller=gantts&f%5B%5D=status_id&f%5B%5D=subject&f%5B%5D=&gantt=1&month=3&months=6&op%5Bstatus_id%5D=o&op%5Bsubject%5D=~&project_id=kagra&query%5Bdraw_progress_line%5D=0&query%5Bdraw_relations%5D=1&set_filter=1&utf8=%E2%9C%93&v%5Bsubject%5D%5B%5D=%5BITMX%5D&year=2021&zoom=2|ITMX]] || || || ||[[https://dacgit.icrr.u-tokyo.ac.jp/projects/kagra/issues/gantt?utf8=%E2%9C%93&set_filter=1&gantt=1&f%5B%5D=status_id&op%5Bstatus_id%5D=o&f%5B%5D=subject&op%5Bsubject%5D=%7E&v%5Bsubject%5D%5B%5D=%5BETMY%5D&f%5B%5D=&query%5Bdraw_relations%5D=0&query%5Bdraw_relations%5D=1&query%5Bdraw_progress_line%5D=0&months=6&month=3&year=2021&zoom=2|ETMY]] || || || ||[[https://dacgit.icrr.u-tokyo.ac.jp/projects/kagra/issues/gantt?utf8=%E2%9C%93&set_filter=1&gantt=1&f%5B%5D=status_id&op%5Bstatus_id%5D=o&f%5B%5D=subject&op%5Bsubject%5D=%7E&v%5Bsubject%5D%5B%5D=%5BITMY%5D&f%5B%5D=&query%5Bdraw_relations%5D=0&query%5Bdraw_relations%5D=1&query%5Bdraw_progress_line%5D=0&months=6&month=3&year=2021&zoom=2|ITMY]] || || || ||[[https://dacgit.icrr.u-tokyo.ac.jp/projects/kagra/issues/gantt?utf8=%E2%9C%93&set_filter=1&gantt=1&f%5B%5D=status_id&op%5Bstatus_id%5D=o&f%5B%5D=category_id&op%5Bcategory_id%5D=%3D&v%5Bcategory_id%5D%5B%5D=6&f%5B%5D=&query%5Bdraw_relations%5D=0&query%5Bdraw_relations%5D=1&query%5Bdraw_progress_line%5D=0&months=6&month=3&year=2021&zoom=2|PRs]] || || || ||[[https://dacgit.icrr.u-tokyo.ac.jp/projects/kagra/issues/gantt?utf8=%E2%9C%93&set_filter=1&gantt=1&f%5B%5D=status_id&op%5Bstatus_id%5D=o&f%5B%5D=category_id&op%5Bcategory_id%5D=%3D&v%5Bcategory_id%5D%5B%5D=7&f%5B%5D=&query%5Bdraw_relations%5D=0&query%5Bdraw_relations%5D=1&query%5Bdraw_progress_line%5D=0&months=6&month=3&year=2021&zoom=2|BS/SRs]] || || || ||[[https://dacgit.icrr.u-tokyo.ac.jp/projects/kagra/issues/gantt?utf8=%E2%9C%93&set_filter=1&gantt=1&f%5B%5D=status_id&op%5Bstatus_id%5D=o&f%5B%5D=category_id&op%5Bcategory_id%5D=%3D&v%5Bcategory_id%5D%5B%5D=10&f%5B%5D=&query%5Bdraw_relations%5D=0&query%5Bdraw_relations%5D=1&query%5Bdraw_progress_line%5D=0&months=6&month=3&year=2021&zoom=2|Input Optics suspensions]] || || || ||[[https://dacgit.icrr.u-tokyo.ac.jp/projects/kagra/issues/gantt?utf8=%E2%9C%93&set_filter=1&gantt=1&f%5B%5D=status_id&op%5Bstatus_id%5D=o&f%5B%5D=category_id&op%5Bcategory_id%5D=%3D&v%5Bcategory_id%5D%5B%5D=20&f%5B%5D=&query%5Bdraw_relations%5D=0&query%5Bdraw_relations%5D=1&query%5Bdraw_progress_line%5D=0&months=6&month=3&year=2021&zoom=2|Output Optics susspensions]] || || |
[[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/VIS/Schedule|Schedule]] |
Line 51: | Line 43: |
Suspension schedule ( based on the [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11475|Microsoft project ]]) |
== klog == '''EX''' * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16084|16084]] Remedy of F0 , __ryutaro.takahashi__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16100|16100]] Comment , __ryutaro.takahashi__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16116|16116]] Comment , __fabian.arellano__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16128|16128]] Comment , __fabian.arellano__ * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16139|16139]] Comment , __fabian.arellano__ '''General''' * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16036|16036]] Cabling for temperature control equipment , __satoru.ikeda__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16114|16114]] Comment , __satoru.ikeda__ '''IX''' * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16118|16118]] Setup of filter chain , __ryutaro.takahashi__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16118|16118]] Setup of filter chain , __ryutaro.takahashi__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16127|16127]] Comment , __ryutaro.takahashi__ * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16138|16138]] Comment , __ryutaro.takahashi__ '''IY''' * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16091|16091]] Monitoring of IP by ITMY venting , __satoru.ikeda__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16106|16106]] Comment , __satoru.ikeda__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16107|16107]] Comment , __kouseki.miyo__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16115|16115]] Comment , __satoru.ikeda__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16119|16119]] Comment , __satoru.ikeda__ '''MCE''' * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16101|16101]] Preparation for fixing the MCe coil cable , __naohisa.satou__ |
Line 55: | Line 68: |
* People * [[https://dacgit.icrr.u-tokyo.ac.jp/projects/kagra/issues/gantt?utf8=%E2%9C%93&set_filter=1&gantt=1&f%5B%5D=status_id&op%5Bstatus_id%5D=o&f%5B%5D=assigned_to_id&op%5Bassigned_to_id%5D=%3D&v%5Bassigned_to_id%5D%5B%5D=100&f%5B%5D=&query%5Bdraw_relations%5D=0&query%5Bdraw_relations%5D=1&query%5Bdraw_progress_line%5D=0&months=6&month=3&year=2021&zoom=2|Takahashi]] * [[https://dacgit.icrr.u-tokyo.ac.jp/projects/kagra/issues/gantt?utf8=%E2%9C%93&set_filter=1&gantt=1&f%5B%5D=status_id&op%5Bstatus_id%5D=o&f%5B%5D=assigned_to_id&op%5Bassigned_to_id%5D=%3D&v%5Bassigned_to_id%5D%5B%5D=107&f%5B%5D=&query%5Bdraw_relations%5D=0&query%5Bdraw_relations%5D=1&query%5Bdraw_progress_line%5D=0&months=6&month=3&year=2021&zoom=2|Fabian]] * [[https://dacgit.icrr.u-tokyo.ac.jp/projects/kagra/issues/gantt?utf8=%E2%9C%93&set_filter=1&gantt=1&f%5B%5D=status_id&op%5Bstatus_id%5D=o&f%5B%5D=assigned_to_id&op%5Bassigned_to_id%5D=%3D&v%5Bassigned_to_id%5D%5B%5D=102&f%5B%5D=&query%5Bdraw_relations%5D=0&query%5Bdraw_relations%5D=1&query%5Bdraw_progress_line%5D=0&months=6&month=3&year=2021&zoom=2|Sato]] * [[https://dacgit.icrr.u-tokyo.ac.jp/projects/kagra/issues/gantt?utf8=%E2%9C%93&set_filter=1&gantt=1&f%5B%5D=status_id&op%5Bstatus_id%5D=o&f%5B%5D=assigned_to_id&op%5Bassigned_to_id%5D=%3D&v%5Bassigned_to_id%5D%5B%5D=103&f%5B%5D=&query%5Bdraw_relations%5D=0&query%5Bdraw_relations%5D=1&query%5Bdraw_progress_line%5D=0&months=6&month=3&year=2021&zoom=2|Hirata]] * [[https://dacgit.icrr.u-tokyo.ac.jp/projects/kagra/issues/gantt?utf8=%E2%9C%93&set_filter=1&gantt=1&f%5B%5D=status_id&op%5Bstatus_id%5D=o&f%5B%5D=assigned_to_id&op%5Bassigned_to_id%5D=%3D&v%5Bassigned_to_id%5D%5B%5D=99&f%5B%5D=&query%5Bdraw_relations%5D=0&query%5Bdraw_relations%5D=1&query%5Bdraw_progress_line%5D=0&months=6&month=3&year=2021&zoom=2|Ikeda]] * [[https://dacgit.icrr.u-tokyo.ac.jp/projects/kagra/issues/gantt?utf8=%E2%9C%93&set_filter=1&gantt=1&f%5B%5D=status_id&op%5Bstatus_id%5D=o&f%5B%5D=assigned_to_id&op%5Bassigned_to_id%5D=%3D&v%5Bassigned_to_id%5D%5B%5D=96&f%5B%5D=&query%5Bdraw_relations%5D=0&query%5Bdraw_relations%5D=1&query%5Bdraw_progress_line%5D=0&months=6&month=3&year=2021&zoom=2|Miyo]] memo * Type-A team: IXV in 3/1-3, IMC in 3/4-5 * Type-B team: EXV in 3/1-2, PR3 in 3/3-5 |
|
Line 70: | Line 69: |
<<MonthCalendar(,2021,3)>> | |
Line 72: | Line 70: |
* Replacement of LVDT coils for F0 in EX. | * Replacement of LVDT coils for F0 was finished in EX. * Tuning of the filter chain is on going in IX. |
Line 77: | Line 76: |
* Investigation and recovery of IMC suspensions are requested. | * Investigation and recovery of the IMC suspensions were performed on 3/4. |
Contents
Agenda/Minutes
CRY+VIS Interface Meeting
Date : 13:30-
Participants :
Schedule
- IX: Oplev setting will be finished by 3/10. Mystery of 5-kg overload. The ballast on the F0 is too tall.
- IY: The vent was finished on 3/2. Disconnection is scheduled on 3/11.
- EX: Connection is scheduled in the week of 3/15.
Status
- Corrugate tube fixing jig: Re-measurement was performed in 2/25-3/2 at IYV.
- Commissioning in air: Commissioning of ITMX is delay. From April?
- Commissioning in vacuum: From May?
- Acceptance check: Cryo-payload in IX/EX and Type-A tower in EY/IX are on going.
- PF actuator: Not evaluated in IX, but after the commissioning for suspension.
- Jig for FC painting:
- Overall commissioning: Schedule meeting is requested (after JPS meeting?).
Discussion
- [Miyo] オフロード作業を無くすためのアイデア募集
- 問題意識:真空圧力が変わるとIPが傾いてPayloadが自身のEQフレームに当たる。(完全に傾かないようにする治具はそもそも不可能なので、傾いても大丈夫なアイデアがほしい。)
[Miyo] そもそも、IPが傾いてIPのEQストップに当たった状態でもPayloadも同じく当たらないよう十分に退避させれば良い話に思える。その場合、IPがEQに当たった状態でFRをつかってもとに戻せるかどうか確認すべき。これはAcceptanceCheckに追加すべきか?
VIS Meeting
14:00-14:30
Participants:
Schedule
klog
EX
16084 Remedy of F0 , ryutaro.takahashi
General
IX
IY
16091 Monitoring of IP by ITMY venting , satoru.ikeda
MCE
16101 Preparation for fixing the MCe coil cable , naohisa.satou
Progress report
TypeA
- Replacement of LVDT coils for F0 was finished in EX.
- Tuning of the filter chain is on going in IX.
TypeB
TypeBp
TypeC
- Investigation and recovery of the IMC suspensions were performed on 3/4.
Electronics
Control
Safety
Discussion
- O3GK Noise Budget : Seismic noise through the Type-A tower
https://gokagra.slack.com/archives/C015M111B5G/p1611978135005400
- Calculation for the ETMY : much smaller than O3GK sensitivity, but larger than the design sensitivity
Travel Plans
The week from 3/1
- Takahashi: 3/1-5
- Sato: 3/1-5
- Hirata: 3/1-5
- Yano: 3/1-5
The week from 3/8
- Takahashi: 3/8-3/12
- Sato: 3/8-3/12
- Hirata: 3/8-3/12
- Yano: 3/8-3/12
Next meeting
- 2021/3/5(FRI)