Line 51: Line 51:
Suspension schedule ( based on the [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11475|Microsoft project ]]) Old? VIS schedule is in [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11475|Microsoft project ]]

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date : 13:30-13:45

Participants :

Post O3 Upgrade portal

Schedule

  • IX: Setting Oplev by 3/10. Preparing additional spring for BF.
  • IY: Disconnection is scheduled on 3/11.
  • EX: Connection is scheduled in the week of 3/15.

Status

  • Corrugate tube fixing jig: Started the vent of IYV chamber on 26th. Re-measurement is on going in 2/25-3/2 at IYV.
  • Commissioning in air: Commissioning of IX will be delay. From April?
  • Commissioning in vacuum: From May?
  • Acceptance check: Cryo-payload in IX/EX and Type-A tower in EY/IX are on going.
  • PF actuator: Not evaluated in IX, but after the commissioning for suspension.
  • Jig for FC painting: Assembling.
  • Overall commissioning: To be considered about personnel.

Discussion

  • [Miyo] オフロード作業を無くすためのアイデア募集
    • 問題意識:真空圧力が変わるとIPが傾いてPayloadが自身のEQフレームに当たる。(完全に傾かないようにする治具はそもそも不可能なので、傾いても大丈夫なアイデアがほしい。)
    • [Miyo] そもそも、IPが傾いてIPのEQストップに当たった状態でもPayloadも同じく当たらないよう十分に退避させれば良い話に思える。その場合、IPがEQに当たった状態でFRをつかってもとに戻せるかどうか確認すべき。これはAcceptanceCheckに追加すべきか?


VIS Meeting

14:00-14:30

Participants: Takahashi, Hirata, Miyo, Sato, Fabian, Sugiyama, Ishizaki, Aso, Terrence, Tanaka

Schedule

KAGRA

Suspension-wise

People-wise

All schedule

ETMX

Takahashi (Type-A)

ITMX

Fabian (Type-B)

ETMY

Sato

ITMY

Hirata

PRs

Ikeda

BS/SRs

Miyo

Input Optics suspensions

Ushiba(CRY)

Output Optics susspensions

Old? VIS schedule is in Microsoft project

Progress report

<< <  2021 / 3 >  >>
Mon Tue Wed Thu Fri Sat Sun
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31        

TypeA

  • Replacement of LVDT coils for F0 in EX.

TypeB

TypeBp

TypeC

  • Investigation and recovery of IMC suspensions are requested.

Electronics

Control

Safety

Discussion

Travel Plans

The week from 3/1

  • Takahashi: 3/1-5
  • Sato: 3/1-5
  • Hirata: 3/1-5
  • Yano: 3/1-5

The week from 3/8

  • Takahashi: 3/8-3/12
  • Sato: 3/8-3/12
  • Hirata: 3/8-3/12
  • Yano: 3/8-3/12

Next meeting

  • 2021/3/5(FRI)

KAGRA/Subgroups/VIS/VISMinutes20210305 (last edited 2021-03-05 16:43:25 by RyutaroTakahashi)