Differences between revisions 40 and 59 (spanning 19 versions)
Revision 40 as of 2021-03-04 19:35:35
Size: 4510
Comment:
Revision 59 as of 2021-03-05 16:43:25
Size: 7242
Comment:
Deletions are marked like this. Additions are marked like this.
Line 6: Line 6:
----------- ----------
Line 8: Line 8:
Date : 13:30- Date : 13:30-14:10
Line 10: Line 10:
Participants : Participants : Takahashi, Sato, Ikeda, Ushiba, Kimura, Akutsu, Aso, Hirata, Miyo
Line 17: Line 17:
 * EX: Connection is scheduled in the week of 3/15. Replacement of the LVDT coil for F0 was finished. The limit switches have been installed.  * EX: Connection is scheduled in the week of 3/15.
Line 21: Line 21:
 * Commissioning in air: Commissioning of IX is delay. From April?
 * Commissioning in vacuum: From May?
 * Commissioning in air: Commissioning of ITMX is delay. From June.
 * Commissioning in vacuum:
Line 27: Line 27:
 * Procedure of TM height setting:
Line 33: Line 34:
----------- ----------
Line 36: Line 37:
14:00-14:30 14:10-15:30
Line 38: Line 39:
Participants: Takahashi, Hirata, Miyo, Sato, Fabian, Sugiyama, Ishizaki, Aso, Terrence, Tanaka Participants: Takahashi, Sato, Ikeda, Aso, Hirata, Miyo, Tanaka, Washimi, Sugiyama, Ishizaki, Fabian
Line 41: Line 42:
[[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/VIS/Schedule|Schedule]] [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/VIS/Schedule|Schedule]]

* The next week

 * Type-A team: 3/9 IXV filter setting, 3/10-11 IYV payload disconnection
 * Type-B team: 3/9 EXV withdrawal, 3/10-12 PR/SR adjustment

* [Miyo] Please check the remaining tasks for PRs and SRs (hardware )

 * PR3
  * rubbing check
  * Install OpLev
  * noise floor check about all sensors: OSEM, OpLev, LVDTs.
  * Calibration check
 * PR2
  * noise floor check
  * Install OpLev
  * Calibration check
 * PRM
  * replace the LVDT circuit for BF damper. it is broken.
  * noise floor check
  * calibration check
 * BS
  * ballast mass adjustment
  * noise floor check
  * calibration check
 * SR3
  * ballast mass adjustment
  * noise floor check
  * calibration check
 * SR2
  * ballast mass adjustment
  * Install OpLev
  * noise floor check
  * calibration check
 * SRM
  * ballast mass adjustment
  * Install OpLev
  * noise floor check
  * calibration check
Line 45: Line 85:
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16084|16084]] Remedy of F0 , __ryutaro.takahashi__ 
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16142|16142]] IP and F0 stepper motor limit switches. , __fabian.arellano__
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16
084|16084]] Remedy of F0 , __ryutaro.takahashi__
Line 49: Line 91:
  * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16139|16139]] Comment , __fabian.arellano__   * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16139|16139]] Comment , __fabian.arellano__
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16142|16142]] IP and F0 stepper motor limit switches. , __fabian.arellano__
  * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16159|16159]] Comment , __fabian.arellano__
 * On Monday we removed the jigs from the F0 blades and began adjusting the compression by 2 mm at the time.
 * This work was mostly finished on Wednesday. We gave the jigs to Type-A team in the afternoon. Blades 1, 3, 4 and 5 still require some compression. See [[https://photos.app.goo.gl/nzXUoTYVzXdZVLir7|this notebook page for details]].
 * On Thursday we lowered the keystone and hooked the suspension rod. Then we lifted the keystone until there was some tension in the rod. We didn't proceed with the assembly of the keystone assembly because lifting the load would be required.
 * We installed and tested F0 vertical fishing roid switches. We checked the polarity of the motor also. It was correct.
 * We assembled the F0 yaw stepper motor, tested the limit switches and the polarity. We were all fine. We left the motor on IP table.
 * We took pictures of the IP horizontal fishing rods for Ikeda-san.
Line 51: Line 102:
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16036|16036]] Cabling for temperature control equipment , __satoru.ikeda__ 
 * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16144|16144]] I turned off the electronics in VIS racks in the central room. , __fabian.arellano__
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16036|16036]] Cabling for temperature control equipment , __satoru.ikeda__
Line 53: Line 106:
 * On Monday We have to set the appropriate setting of the signal generators for PR, BS and SR suspensions.
Line 54: Line 109:
Line 55: Line 111:
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16118|16118]] Setup of filter chain , __ryutaro.takahashi__
Line 57: Line 112:
  * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16138|16138]] Comment , __ryutaro.takahashi__   * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16138|16138]] Comment ,  __ryutaro.takahashi__
  * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16156|16156]] Comment , __ryutaro.takahashi__
Line 59: Line 116:
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16091|16091]] Monitoring of IP by ITMY venting , __satoru.ikeda__    * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16106|16106]] Comment , __satoru.ikeda__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16107|16107]] Comment , __kouseki.miyo__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16115|16115]] Comment , __satoru.ikeda__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16119|16119]] Comment , __satoru.ikeda__

* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16091|16091]] Monitoring of IP by ITMY venting , __satoru.ikeda__
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16106|16106]] Comment , __satoru.ikeda__
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16107|16107]] Comment , __kouseki.miyo__
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16115|16115]] Comment , __satoru.ikeda__
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16119|16119]] Comment , __satoru.ikeda__
Line 65: Line 124:
Line 67: Line 127:
'''MCF'''

 * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16157|16157]] Investigation of IMC suspensions , __ryutaro.takahashi__

'''PR3'''

 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15976|15976]] Picomotor of PR3_BF_T(Motor2) got stuck , __satoru.ikeda__
  * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16162|16162]] Comment , __fabian.arellano__

In PR3 we inspected the OSEM flags with the optic fibre camera. They all seem to be in place.
Line 70: Line 140:
 * Replacement of LVDT coils for F0 in EX.  * Replacement of LVDT coils for F0 was finished in EX.
 * Tuning of the filter chain is on going in IX.
Line 75: Line 146:
 * Investigation and recovery of IMC suspensions are requested.  * Investigation and recovery of the IMC suspensions were performed on 3/4.
Line 79: Line 150:
Line 82: Line 152:
 * O3GK Noise Budget : Seismic noise through the Type-A tower
  * [[https://gokagra.slack.com/archives/C015M111B5G/p1611978135005400]]
  * Calculation for the ETMY : much smaller than O3GK sensitivity, but larger than the design sensitivity
Line 87: Line 153:
The week from 3/1

 * Takahashi: 3/1-5
 * Sato: 3/1-5
 * Hirata: 3/1-5
 * Yano: 3/1-5
Line 101: Line 160:
The week from 3/15

 * Takahashi: 3/15-18
 * Sato: 3/15-19
 * Hirata: 3/15-19
 * Yano: 3/15-19
Line 102: Line 168:
 * 2021/3/5(FRI)  * 2021/3/12(FRI)

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date : 13:30-14:10

Participants : Takahashi, Sato, Ikeda, Ushiba, Kimura, Akutsu, Aso, Hirata, Miyo

Post O3 Upgrade portal

Schedule

  • IX: Oplev setting will be finished by 3/10. Mystery of 5-kg overload. The ballast on the F0 is too tall.
  • IY: The vent was finished on 3/2. Disconnection is scheduled on 3/11.
  • EX: Connection is scheduled in the week of 3/15.

Status

  • Corrugate tube fixing jig: Re-measurement was performed in 2/25-3/2 at IYV.
  • Commissioning in air: Commissioning of ITMX is delay. From June.
  • Commissioning in vacuum:
  • Acceptance check: Cryo-payload in IX/EX and Type-A tower in EY/IX are on going.
  • PF actuator: Not evaluated in IX, but after the commissioning for suspension.
  • Jig for FC painting:
  • Overall commissioning: Schedule meeting is requested (after JPS meeting?).
  • Procedure of TM height setting:

Discussion

  • [Miyo] オフロード作業を無くすためのアイデア募集
    • 問題意識:真空圧力が変わるとIPが傾いてPayloadが自身のEQフレームに当たる。(完全に傾かないようにする治具はそもそも不可能なので、傾いても大丈夫なアイデアがほしい。)
    • [Miyo] そもそも、IPが傾いてIPのEQストップに当たった状態でもPayloadも同じく当たらないよう十分に退避させれば良い話に思える。その場合、IPがEQに当たった状態でFRをつかってもとに戻せるかどうか確認すべき。これはAcceptanceCheckに追加すべきか?


VIS Meeting

14:10-15:30

Participants: Takahashi, Sato, Ikeda, Aso, Hirata, Miyo, Tanaka, Washimi, Sugiyama, Ishizaki, Fabian

Schedule

Schedule

* The next week

  • Type-A team: 3/9 IXV filter setting, 3/10-11 IYV payload disconnection
  • Type-B team: 3/9 EXV withdrawal, 3/10-12 PR/SR adjustment

* [Miyo] Please check the remaining tasks for PRs and SRs (hardware )

  • PR3
    • rubbing check
    • Install OpLev

    • noise floor check about all sensors: OSEM, OpLev, LVDTs.

    • Calibration check
  • PR2
    • noise floor check
    • Install OpLev

    • Calibration check
  • PRM
    • replace the LVDT circuit for BF damper. it is broken.
    • noise floor check
    • calibration check
  • BS
    • ballast mass adjustment
    • noise floor check
    • calibration check
  • SR3
    • ballast mass adjustment
    • noise floor check
    • calibration check
  • SR2
    • ballast mass adjustment
    • Install OpLev

    • noise floor check
    • calibration check
  • SRM
    • ballast mass adjustment
    • Install OpLev

    • noise floor check
    • calibration check

klog

EX

  • 16142 IP and F0 stepper motor limit switches. , fabian.arellano

  • 16084 Remedy of F0 , ryutaro.takahashi

    • 16100 Comment , ryutaro.takahashi

    • 16116 Comment , fabian.arellano

    • 16128 Comment , fabian.arellano

    • 16139 Comment , fabian.arellano

  • 16142 IP and F0 stepper motor limit switches. , fabian.arellano

    • (!) 16159 Comment , fabian.arellano

  • On Monday we removed the jigs from the F0 blades and began adjusting the compression by 2 mm at the time.
  • This work was mostly finished on Wednesday. We gave the jigs to Type-A team in the afternoon. Blades 1, 3, 4 and 5 still require some compression. See this notebook page for details.

  • On Thursday we lowered the keystone and hooked the suspension rod. Then we lifted the keystone until there was some tension in the rod. We didn't proceed with the assembly of the keystone assembly because lifting the load would be required.
  • We installed and tested F0 vertical fishing roid switches. We checked the polarity of the motor also. It was correct.
  • We assembled the F0 yaw stepper motor, tested the limit switches and the polarity. We were all fine. We left the motor on IP table.
  • We took pictures of the IP horizontal fishing rods for Ikeda-san.

General

  • (!) 16144 I turned off the electronics in VIS racks in the central room. , fabian.arellano

  • 16036 Cabling for temperature control equipment , satoru.ikeda

    • 16114 Comment , satoru.ikeda

  • On Monday We have to set the appropriate setting of the signal generators for PR, BS and SR suspensions.

IX

  • 16118 Setup of filter chain , ryutaro.takahashi

    • 16127 Comment , ryutaro.takahashi

    • 16138 Comment , ryutaro.takahashi

    • (!) 16156 Comment , ryutaro.takahashi

IY

  • 16091 Monitoring of IP by ITMY venting , satoru.ikeda

  • 16106 Comment , satoru.ikeda

  • 16107 Comment , kouseki.miyo

  • 16115 Comment , satoru.ikeda

  • 16119 Comment , satoru.ikeda

MCE

  • 16101 Preparation for fixing the MCe coil cable , naohisa.satou

MCF

  • (!) 16157 Investigation of IMC suspensions , ryutaro.takahashi

PR3

  • 15976 Picomotor of PR3_BF_T(Motor2) got stuck , satoru.ikeda

    • (!) 16162 Comment , fabian.arellano

In PR3 we inspected the OSEM flags with the optic fibre camera. They all seem to be in place.

Progress report

TypeA

  • Replacement of LVDT coils for F0 was finished in EX.
  • Tuning of the filter chain is on going in IX.

TypeB

TypeBp

TypeC

  • Investigation and recovery of the IMC suspensions were performed on 3/4.

Electronics

Control

Safety

Discussion

Travel Plans

The week from 3/8

  • Takahashi: 3/8-3/12
  • Sato: 3/8-3/12
  • Hirata: 3/8-3/12
  • Yano: 3/8-3/12

The week from 3/15

  • Takahashi: 3/15-18
  • Sato: 3/15-19
  • Hirata: 3/15-19
  • Yano: 3/15-19

Next meeting

  • 2021/3/12(FRI)