Differences between revisions 51 and 52
Revision 51 as of 2021-03-05 08:38:31
Size: 4991
Editor: KousekiMiyo
Comment:
Revision 52 as of 2021-03-05 08:56:08
Size: 5756
Editor: KousekiMiyo
Comment:
Deletions are marked like this. Additions are marked like this.
Line 42: Line 42:

* [Miyo] Please check the remaining tasks for PRs and SRs (hardware )
 * PR3
  * rubbing check
  * Install OpLev
  * noise floor check about all sensors: OSEM, OpLev, LVDTs.
  * Calibration check
 * PR2
  * noise floor check
  * Install OpLev
  * Calibration check
 * PRM
  * replace the LVDT circuit for BF damper. it is broken.
  * noise floor check
  * calibration check
 * BS
  * ballast mass adjustment
  * noise floor check
  * calibration check
 * SR3
  * ballast mass adjustment
  * noise floor check
  * calibration check
 * SR2
  * ballast mass adjustment
  * Install OpLev
  * noise floor check
  * calibration check
 * SRM
  * ballast mass adjustment
  * Install OpLev
  * noise floor check
  * calibration check

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date : 13:30-

Participants :

Post O3 Upgrade portal

Schedule

  • IX: Oplev setting will be finished by 3/10. Mystery of 5-kg overload. The ballast on the F0 is too tall.
  • IY: The vent was finished on 3/2. Disconnection is scheduled on 3/11.
  • EX: Connection is scheduled in the week of 3/15.

Status

  • Corrugate tube fixing jig: Re-measurement was performed in 2/25-3/2 at IYV.
  • Commissioning in air: Commissioning of ITMX is delay. From April?
  • Commissioning in vacuum: From May?
  • Acceptance check: Cryo-payload in IX/EX and Type-A tower in EY/IX are on going.
  • PF actuator: Not evaluated in IX, but after the commissioning for suspension.
  • Jig for FC painting:
  • Overall commissioning: Schedule meeting is requested (after JPS meeting?).

Discussion

  • [Miyo] オフロード作業を無くすためのアイデア募集
    • 問題意識:真空圧力が変わるとIPが傾いてPayloadが自身のEQフレームに当たる。(完全に傾かないようにする治具はそもそも不可能なので、傾いても大丈夫なアイデアがほしい。)
    • [Miyo] そもそも、IPが傾いてIPのEQストップに当たった状態でもPayloadも同じく当たらないよう十分に退避させれば良い話に思える。その場合、IPがEQに当たった状態でFRをつかってもとに戻せるかどうか確認すべき。これはAcceptanceCheckに追加すべきか?


VIS Meeting

14:00-

Participants:

Schedule

Schedule

* [Miyo] Please check the remaining tasks for PRs and SRs (hardware )

  • PR3
    • rubbing check
    • Install OpLev

    • noise floor check about all sensors: OSEM, OpLev, LVDTs.

    • Calibration check
  • PR2
    • noise floor check
    • Install OpLev

    • Calibration check
  • PRM
    • replace the LVDT circuit for BF damper. it is broken.
    • noise floor check
    • calibration check
  • BS
    • ballast mass adjustment
    • noise floor check
    • calibration check
  • SR3
    • ballast mass adjustment
    • noise floor check
    • calibration check
  • SR2
    • ballast mass adjustment
    • Install OpLev

    • noise floor check
    • calibration check
  • SRM
    • ballast mass adjustment
    • Install OpLev

    • noise floor check
    • calibration check

klog

EX

  • 16142 IP and F0 stepper motor limit switches. , fabian.arellano

  • 16084 Remedy of F0 , ryutaro.takahashi

    • 16100 Comment , ryutaro.takahashi

    • 16116 Comment , fabian.arellano

    • 16128 Comment , fabian.arellano

    • 16139 Comment , fabian.arellano

  • 16142 IP and F0 stepper motor limit switches. , fabian.arellano

    • (!) 16159 Comment , fabian.arellano

General

  • (!) 16144 I turned off the electronics in VIS racks in the central room. , fabian.arellano

  • 16036 Cabling for temperature control equipment , satoru.ikeda

    • 16114 Comment , satoru.ikeda

IX

  • 16118 Setup of filter chain , ryutaro.takahashi

    • 16127 Comment , ryutaro.takahashi

    • 16138 Comment , ryutaro.takahashi

    • (!) 16156 Comment , ryutaro.takahashi

IY

  • 16091 Monitoring of IP by ITMY venting , satoru.ikeda

  • 16106 Comment , satoru.ikeda

  • 16107 Comment , kouseki.miyo

  • 16115 Comment , satoru.ikeda

  • 16119 Comment , satoru.ikeda

MCE

  • 16101 Preparation for fixing the MCe coil cable , naohisa.satou

MCF

  • (!) 16157 Investigation of IMC suspensions , ryutaro.takahashi

PR3

  • 15976 Picomotor of PR3_BF_T(Motor2) got stuck , satoru.ikeda

    • (!) 16162 Comment , fabian.arellano

Progress report

TypeA

  • Replacement of LVDT coils for F0 was finished in EX.
  • Tuning of the filter chain is on going in IX.

TypeB

TypeBp

TypeC

  • Investigation and recovery of the IMC suspensions were performed on 3/4.

Electronics

Control

Safety

Discussion

Travel Plans

The week from 3/8

  • Takahashi: 3/8-3/12
  • Sato: 3/8-3/12
  • Hirata: 3/8-3/12
  • Yano: 3/8-3/12

The week from 3/15

  • Takahashi: 3/15-18
  • Sato: 3/15-19
  • Hirata: 3/15-19
  • Yano: 3/15-19

Next meeting

  • 2021/3/12(FRI)

KAGRA/Subgroups/VIS/VISMinutes20210305 (last edited 2021-03-05 16:43:25 by RyutaroTakahashi)