[[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/VIS/Schedule|Schedule]] | [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/VIS/Schedule|Schedule]] * The next week * Type-A team: 3/9 IXV filter setting, 3/10-11 IYV payload disconnection * Type-B team: 3/9 EXV withdrawal, 3/10-12 PR/SR adjustment |
Contents
Agenda/Minutes
CRY+VIS Interface Meeting
Date : 13:30-
Participants :
Schedule
- IX: Oplev setting will be finished by 3/10. Mystery of 5-kg overload. The ballast on the F0 is too tall.
- IY: The vent was finished on 3/2. Disconnection is scheduled on 3/11.
- EX: Connection is scheduled in the week of 3/15.
Status
- Corrugate tube fixing jig: Re-measurement was performed in 2/25-3/2 at IYV.
- Commissioning in air: Commissioning of ITMX is delay. From April?
- Commissioning in vacuum: From May?
- Acceptance check: Cryo-payload in IX/EX and Type-A tower in EY/IX are on going.
- PF actuator: Not evaluated in IX, but after the commissioning for suspension.
- Jig for FC painting:
- Overall commissioning: Schedule meeting is requested (after JPS meeting?).
Discussion
- [Miyo] オフロード作業を無くすためのアイデア募集
- 問題意識:真空圧力が変わるとIPが傾いてPayloadが自身のEQフレームに当たる。(完全に傾かないようにする治具はそもそも不可能なので、傾いても大丈夫なアイデアがほしい。)
[Miyo] そもそも、IPが傾いてIPのEQストップに当たった状態でもPayloadも同じく当たらないよう十分に退避させれば良い話に思える。その場合、IPがEQに当たった状態でFRをつかってもとに戻せるかどうか確認すべき。これはAcceptanceCheckに追加すべきか?
VIS Meeting
14:00-
Participants:
Schedule
* The next week
- Type-A team: 3/9 IXV filter setting, 3/10-11 IYV payload disconnection
- Type-B team: 3/9 EXV withdrawal, 3/10-12 PR/SR adjustment
* [Miyo] Please check the remaining tasks for PRs and SRs (hardware )
- PR3
- PR2
- noise floor check
Install OpLev
- Calibration check
- PRM
- replace the LVDT circuit for BF damper. it is broken.
- noise floor check
- calibration check
- BS
- ballast mass adjustment
- noise floor check
- calibration check
- SR3
- ballast mass adjustment
- noise floor check
- calibration check
- SR2
- ballast mass adjustment
Install OpLev
- noise floor check
- calibration check
- SRM
- ballast mass adjustment
Install OpLev
- noise floor check
- calibration check
klog
EX
16142 IP and F0 stepper motor limit switches. , fabian.arellano
16084 Remedy of F0 , ryutaro.takahashi
16142 IP and F0 stepper motor limit switches. , fabian.arellano
16159 Comment , fabian.arellano
General
16144 I turned off the electronics in VIS racks in the central room. , fabian.arellano
16036 Cabling for temperature control equipment , satoru.ikeda
16114 Comment , satoru.ikeda
IX
16118 Setup of filter chain , ryutaro.takahashi
IY
16091 Monitoring of IP by ITMY venting , satoru.ikeda
16106 Comment , satoru.ikeda
16107 Comment , kouseki.miyo
16115 Comment , satoru.ikeda
16119 Comment , satoru.ikeda
MCE
16101 Preparation for fixing the MCe coil cable , naohisa.satou
MCF
16157 Investigation of IMC suspensions , ryutaro.takahashi
PR3
Progress report
TypeA
- Replacement of LVDT coils for F0 was finished in EX.
- Tuning of the filter chain is on going in IX.
TypeB
TypeBp
TypeC
- Investigation and recovery of the IMC suspensions were performed on 3/4.
Electronics
Control
Safety
Discussion
Travel Plans
The week from 3/8
- Takahashi: 3/8-3/12
- Sato: 3/8-3/12
- Hirata: 3/8-3/12
- Yano: 3/8-3/12
The week from 3/15
- Takahashi: 3/15-18
- Sato: 3/15-19
- Hirata: 3/15-19
- Yano: 3/15-19
Next meeting
- 2021/3/12(FRI)