Line 6: Line 6:
----------- ----------
Line 10: Line 10:
Participants :  Participants :
Line 33: Line 33:
----------- ----------
Line 44: Line 44:
Line 48: Line 49:
Line 62: Line 64:
  * ballast mass adjustment    * ballast mass adjustment
Line 66: Line 68:
  * ballast mass adjustment    * ballast mass adjustment
Line 69: Line 71:
 * SR2  
  * ballast mass adjustment 
 * SR2
  * ballast mass adjustment
Line 75: Line 77:
  * ballast mass adjustment    * ballast mass adjustment
Line 82: Line 84:
Line 83: Line 86:
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16084|16084]] Remedy of F0 , __ryutaro.takahashi__   * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16084|16084]] Remedy of F0 , __ryutaro.takahashi__
Line 88: Line 91:
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16142|16142]] IP and F0 stepper motor limit switches. , __fabian.arellano__   * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16142|16142]] IP and F0 stepper motor limit switches. , __fabian.arellano__
Line 90: Line 93:
 * On Monday we removed the jigs from the F0 blades and began adjusting the compression by 2 mm at the time.
 * This work was mostly finished on Wednesday. We gave the jigs to Type-A team in the afternoon. Blades 1, 3, 4 and 5 still require some compression. See [[https://photos.app.goo.gl/nzXUoTYVzXdZVLir7|this notebook page for details]].
 * On Thursday we lowered the keystone and hooked the suspension rod. Then we lifted the keystone until there was some tension in the rod. We didn't proceed with the assembly of the keystone assembly because lifting the load would be required.
 * We installed and tested F0 vertical fishing roid switches. We checked the polarity of the motor also. It was correct.
 * We assembled the F0 yaw stepper motor, tested the limit switches and the polarity. We were all fine. We left the motor on IP table.
Line 91: Line 100:
Line 92: Line 102:
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16036|16036]] Cabling for temperature control equipment , __satoru.ikeda__   * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16036|16036]] Cabling for temperature control equipment , __satoru.ikeda__
Line 94: Line 104:
Line 95: Line 106:
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16118|16118]] Setup of filter chain , __ryutaro.takahashi__ 
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16118|16118]] Setup of filter chain , __ryutaro.takahashi__
Line 99: Line 111:
Line 100: Line 113:
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16091|16091]] Monitoring of IP by ITMY venting , __satoru.ikeda__ 
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16091|16091]] Monitoring of IP by ITMY venting , __satoru.ikeda__
Line 105: Line 119:
Line 106: Line 121:
Line 107: Line 123:
Line 108: Line 125:
Line 109: Line 127:
Line 110: Line 129:
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15976|15976]] Picomotor of PR3_BF_T(Motor2) got stuck , __satoru.ikeda__ 
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15976|15976]] Picomotor of PR3_BF_T(Motor2) got stuck , __satoru.ikeda__
Line 125: Line 145:
Line 128: Line 147:

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date : 13:30-

Participants :

Post O3 Upgrade portal

Schedule

  • IX: Oplev setting will be finished by 3/10. Mystery of 5-kg overload. The ballast on the F0 is too tall.
  • IY: The vent was finished on 3/2. Disconnection is scheduled on 3/11.
  • EX: Connection is scheduled in the week of 3/15.

Status

  • Corrugate tube fixing jig: Re-measurement was performed in 2/25-3/2 at IYV.
  • Commissioning in air: Commissioning of ITMX is delay. From April?
  • Commissioning in vacuum: From May?
  • Acceptance check: Cryo-payload in IX/EX and Type-A tower in EY/IX are on going.
  • PF actuator: Not evaluated in IX, but after the commissioning for suspension.
  • Jig for FC painting:
  • Overall commissioning: Schedule meeting is requested (after JPS meeting?).

Discussion

  • [Miyo] オフロード作業を無くすためのアイデア募集
    • 問題意識:真空圧力が変わるとIPが傾いてPayloadが自身のEQフレームに当たる。(完全に傾かないようにする治具はそもそも不可能なので、傾いても大丈夫なアイデアがほしい。)
    • [Miyo] そもそも、IPが傾いてIPのEQストップに当たった状態でもPayloadも同じく当たらないよう十分に退避させれば良い話に思える。その場合、IPがEQに当たった状態でFRをつかってもとに戻せるかどうか確認すべき。これはAcceptanceCheckに追加すべきか?


VIS Meeting

14:00-

Participants:

Schedule

Schedule

* The next week

  • Type-A team: 3/9 IXV filter setting, 3/10-11 IYV payload disconnection
  • Type-B team: 3/9 EXV withdrawal, 3/10-12 PR/SR adjustment

* [Miyo] Please check the remaining tasks for PRs and SRs (hardware )

  • PR3
    • rubbing check
    • Install OpLev

    • noise floor check about all sensors: OSEM, OpLev, LVDTs.

    • Calibration check
  • PR2
    • noise floor check
    • Install OpLev

    • Calibration check
  • PRM
    • replace the LVDT circuit for BF damper. it is broken.
    • noise floor check
    • calibration check
  • BS
    • ballast mass adjustment
    • noise floor check
    • calibration check
  • SR3
    • ballast mass adjustment
    • noise floor check
    • calibration check
  • SR2
    • ballast mass adjustment
    • Install OpLev

    • noise floor check
    • calibration check
  • SRM
    • ballast mass adjustment
    • Install OpLev

    • noise floor check
    • calibration check

klog

EX

  • 16142 IP and F0 stepper motor limit switches. , fabian.arellano

  • 16084 Remedy of F0 , ryutaro.takahashi

    • 16100 Comment , ryutaro.takahashi

    • 16116 Comment , fabian.arellano

    • 16128 Comment , fabian.arellano

    • 16139 Comment , fabian.arellano

  • 16142 IP and F0 stepper motor limit switches. , fabian.arellano

    • (!) 16159 Comment , fabian.arellano

  • On Monday we removed the jigs from the F0 blades and began adjusting the compression by 2 mm at the time.
  • This work was mostly finished on Wednesday. We gave the jigs to Type-A team in the afternoon. Blades 1, 3, 4 and 5 still require some compression. See this notebook page for details.

  • On Thursday we lowered the keystone and hooked the suspension rod. Then we lifted the keystone until there was some tension in the rod. We didn't proceed with the assembly of the keystone assembly because lifting the load would be required.
  • We installed and tested F0 vertical fishing roid switches. We checked the polarity of the motor also. It was correct.
  • We assembled the F0 yaw stepper motor, tested the limit switches and the polarity. We were all fine. We left the motor on IP table.

General

  • (!) 16144 I turned off the electronics in VIS racks in the central room. , fabian.arellano

  • 16036 Cabling for temperature control equipment , satoru.ikeda

    • 16114 Comment , satoru.ikeda

IX

  • 16118 Setup of filter chain , ryutaro.takahashi

    • 16127 Comment , ryutaro.takahashi

    • 16138 Comment , ryutaro.takahashi

    • (!) 16156 Comment , ryutaro.takahashi

IY

  • 16091 Monitoring of IP by ITMY venting , satoru.ikeda

  • 16106 Comment , satoru.ikeda

  • 16107 Comment , kouseki.miyo

  • 16115 Comment , satoru.ikeda

  • 16119 Comment , satoru.ikeda

MCE

  • 16101 Preparation for fixing the MCe coil cable , naohisa.satou

MCF

  • (!) 16157 Investigation of IMC suspensions , ryutaro.takahashi

PR3

  • 15976 Picomotor of PR3_BF_T(Motor2) got stuck , satoru.ikeda

    • (!) 16162 Comment , fabian.arellano

Progress report

TypeA

  • Replacement of LVDT coils for F0 was finished in EX.
  • Tuning of the filter chain is on going in IX.

TypeB

TypeBp

TypeC

  • Investigation and recovery of the IMC suspensions were performed on 3/4.

Electronics

Control

Safety

Discussion

Travel Plans

The week from 3/8

  • Takahashi: 3/8-3/12
  • Sato: 3/8-3/12
  • Hirata: 3/8-3/12
  • Yano: 3/8-3/12

The week from 3/15

  • Takahashi: 3/15-18
  • Sato: 3/15-19
  • Hirata: 3/15-19
  • Yano: 3/15-19

Next meeting

  • 2021/3/12(FRI)