Differences between revisions 17 and 18
Revision 17 as of 2021-03-12 13:16:49
Size: 4720
Comment:
Revision 18 as of 2021-03-12 13:45:12
Size: 6720
Comment:
Deletions are marked like this. Additions are marked like this.
Line 10: Line 10:
Participants :  Participants :
Line 20: Line 20:
 * Corrugate tube fixing jig:   * Corrugate tube fixing jig:
Line 30: Line 30:
Line 36: Line 35:
Participants:  Participants:
Line 43: Line 42:
 * Type-A team: 3/15-16 connection of cryo-payload in EX. 3/17- go back to EY   * Type-A team: 3/15-16 connection of cryo-payload in EX. 3/17- go back to EY
Line 48: Line 47:
Line 49: Line 49:
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16142|16142]] IP and F0 stepper motor limit switches. , __fabian.arellano__   * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16142|16142]] IP and F0 stepper motor limit switches. , __fabian.arellano__
Line 52: Line 52:
Line 53: Line 54:
Line 54: Line 56:
Line 55: Line 58:
Line 57: Line 61:
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16118|16118]] Setup of filter chain , __ryutaro.takahashi__   * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16118|16118]] Setup of filter chain , __ryutaro.takahashi__
Line 60: Line 64:
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16185|16185]] Added MN/PF OpLev to k1visitmxp's Model file. , __satoru.ikeda__   * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16185|16185]] Added MN/PF OpLev to k1visitmxp's Model file. , __satoru.ikeda__
Line 63: Line 67:
Line 64: Line 69:
Line 66: Line 72:
Line 67: Line 74:
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16157|16157]] Investigation of IMC suspensions , __ryutaro.takahashi__ 
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16157|16157]] Investigation of IMC suspensions , __ryutaro.takahashi__
Line 74: Line 82:
Line 75: Line 84:
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15976|15976]] Picomotor of PR3_BF_T(Motor2) got stuck , __satoru.ikeda__ 
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15976|15976]] Picomotor of PR3_BF_T(Motor2) got stuck , __satoru.ikeda__
Line 89: Line 99:
PR3

 * At the begining of the week the IM was still touching the IRM.
 * First we did a health check of the IM-Y picomotor because I had the impression it had reached a limit.
  * We locked the BF and pushed the IRM in yaw such that the IM was hanging free.
  * We actuated in yaw using the picomotor and it moved freely suggesting it had not reached its limit.
 * With confidence in the picomotor condition we proceeded to adjust yaw and pitch until the IM became free although the OSEM flags were not at the centres of their cavities.
 * Measurements of IM TFs revealed the system was healthy. (IM-V TF was not measured because the SF is locked due to the plastic cover.)
 * '''Happily, we can consider the system to be recovered from the jammed-BF-picomotor-earthqueake event.'''
 * Later we moved the IM picomotors in order to move the OSEM flags closer to centers of their cavities.However, this rendered H3 out of range.
 * The locked theIRM and the IM and moved H3 into range, but when we released the system we realized V1 had become out of range due to a change in pitch.
 * We measured transfer functions with the horizontal OSEMs and they were all good.
 * We proceeded with the Trump method to test the pitch stability:
  * We carried out the procedure from the control room and used the readout from V2 and V3 (V1 out of range) and the 3D-CAD to calculate the change in pitch: '''-3.9 mrad''' ('''consistent with what was measured with an oplev when we disturbed the suspension when we glued the wire''').
  * In the tunnel we carried out the procedure again and used an oplev to measure a change of '''33.4 mrad'''. '''See the videos'''.
  * For the same event we used the V2 and V3 OSEMs to estimate the change in pitch of the IM: '''4.1 mrad''' '''(consistent with previous measurements).'''
 * Today we inspected the payload visually.
  * We didn't find anything wrong.
  * Only H2 flag rotated during the Trump procedure. See pictures.

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date : 13:30-

Participants :

Post O3 Upgrade portal

Schedule

  • IX: Oplev setting by 3/10. F0 and IP were tuned.
  • IY: Cryo-payload was removed on 3/11.
  • EX: Connection is scheduled in the next week.

Status

  • Corrugate tube fixing jig:
  • Commissioning in air: From June for IX?
  • Commissioning in vacuum:
  • Acceptance check: Cryo-payload in IX/EX and Type-A tower in EY/IX are on going.
  • PF actuator: Not evaluated in IX, but after the commissioning for suspension.
  • Jig for FC painting:
  • Overall commissioning: Schedule meeting after JPS meeting.
  • Procedure of TM height setting:

Discussion


VIS Meeting

14:00-

Participants:

Schedule

Schedule

* The next week

  • Type-A team: 3/15-16 connection of cryo-payload in EX. 3/17- go back to EY
  • Type-B team: 3/15-19 remedy of IY or still PR3 setting.

klog

EX

  • 16183 Cleaning and transportation of components. , fabian.arellano

  • 16142 IP and F0 stepper motor limit switches. , fabian.arellano

    • 16170 Comment , satoru.ikeda

    • 16178 Comment , fabian.arellano

General

  • (!) 16200 Recovery of the signal generators in Type-B and Type-Bp suspensions. , fabian.arellano

IX

  • 16185 Added MN/PF OpLev to k1visitmxp's Model file. , satoru.ikeda

  • 16199 Setup of IP , ryutaro.takahashi

  • 16118 Setup of filter chain , ryutaro.takahashi

    • 16171 Comment , ryutaro.takahashi

    • 16195 Comment , ryutaro.takahashi

  • 16185 Added MN/PF OpLev to k1visitmxp's Model file. , satoru.ikeda

    • 16197 Comment , satoru.ikeda

    • (!) 16216 Comment , satoru.ikeda

IY

  • (!) 16214 Preparation for disconnection of cryo-payload , ryutaro.takahashi

  • (!) 16217 Support for common Payload/Tower model files: Type-A (ITMY) is supported to TOWER_MASTER/PAYLOAD_MASTER. , satoru.ikeda

MCF

  • 16157 Investigation of IMC suspensions , ryutaro.takahashi

    • 16180 Comment , ryutaro.takahashi

    • 16181 Comment , takaaki.yokozawa

    • 16182 Comment , shinji.miyoki

    • 16198 Comment , kouseki.miyo

    • 16201 Comment , tomotada.akutsu

    • (!) 16225 Comment , kouseki.miyo

PR3

  • 15976 Picomotor of PR3_BF_T(Motor2) got stuck , satoru.ikeda

    • (!) 16204 Comment , fabian.arellano

    • (!) 16207 Comment , fabian.arellano

    • (!) 16223 Comment , fabian.arellano

This is generated by python script in /users/Miyo/dropbox/Script/scrapping/main.py.

Summary Report

TypeA

  • Disconnected the cryo-payload in IY.
  • Setup the F0 and tuned the IP in IX.

TypeB

TypeBp

PR3

  • At the begining of the week the IM was still touching the IRM.
  • First we did a health check of the IM-Y picomotor because I had the impression it had reached a limit.
    • We locked the BF and pushed the IRM in yaw such that the IM was hanging free.
    • We actuated in yaw using the picomotor and it moved freely suggesting it had not reached its limit.
  • With confidence in the picomotor condition we proceeded to adjust yaw and pitch until the IM became free although the OSEM flags were not at the centres of their cavities.
  • Measurements of IM TFs revealed the system was healthy. (IM-V TF was not measured because the SF is locked due to the plastic cover.)
  • Happily, we can consider the system to be recovered from the jammed-BF-picomotor-earthqueake event.

  • Later we moved the IM picomotors in order to move the OSEM flags closer to centers of their cavities.However, this rendered H3 out of range.
  • The locked theIRM and the IM and moved H3 into range, but when we released the system we realized V1 had become out of range due to a change in pitch.
  • We measured transfer functions with the horizontal OSEMs and they were all good.
  • We proceeded with the Trump method to test the pitch stability:
    • We carried out the procedure from the control room and used the readout from V2 and V3 (V1 out of range) and the 3D-CAD to calculate the change in pitch: -3.9 mrad (consistent with what was measured with an oplev when we disturbed the suspension when we glued the wire).

    • In the tunnel we carried out the procedure again and used an oplev to measure a change of 33.4 mrad. See the videos.

    • For the same event we used the V2 and V3 OSEMs to estimate the change in pitch of the IM: 4.1 mrad (consistent with previous measurements).

  • Today we inspected the payload visually.
    • We didn't find anything wrong.
    • Only H2 flag rotated during the Trump procedure. See pictures.

TypeC

Electronics

  • [Takahashi] Connected the release sensors to the DGS using the exchange cables in IY.

Control

Safety

Discussion

Travel Plans

The week from 3/15

  • Takahashi: 3/15-18
  • Sato: 3/15-19
  • Hirata: 3/15-19
  • Yano: 3/15-19

The week from 3/22

  • Takahashi: 3/22-3/26
  • Sato: 3/22-3/26
  • Hirata: 3/22-3/26
  • Yano: 3/22-3/26

Next meeting

  • 2021/3/19(FRI)

KAGRA/Subgroups/VIS/VISMinutes20210312 (last edited 2021-03-12 15:19:04 by RyutaroTakahashi)