Size: 4745
Comment:
|
Size: 5634
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 49: | Line 49: |
* [Miyo] Please check the remaining tasks for PRs and SRs (hardware ) | == klog == |
Line 51: | Line 51: |
* PR3 * rubbing check * Install OpLev * noise floor check about all sensors: OSEM, OpLev, LVDTs. * Calibration check * PR2 * noise floor check * Install OpLev * Calibration check * PRM * replace the LVDT circuit for BF damper. it is broken. * noise floor check * calibration check * BS * ballast mass adjustment * noise floor check * calibration check * SR3 * ballast mass adjustment * noise floor check * calibration check * SR2 * ballast mass adjustment * Install OpLev * noise floor check * calibration check * SRM * ballast mass adjustment * Install OpLev * noise floor check * calibration check == klog == |
|
Line 85: | Line 52: |
* (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16183|16183]] Cleaning and transportation of components. , __fabian.arellano__ | * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16183|16183]] Cleaning and transportation of components. , __fabian.arellano__ |
Line 89: | Line 56: |
'''General''' * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16200|16200]] Recovery of the signal generators in Type-B and Type-Bp suspensions. , __fabian.arellano__ |
|
Line 90: | Line 59: |
* (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16185|16185]] Added MN/PF OpLev to k1visitmxp's Model file. , __satoru.ikeda__ | * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16185|16185]] Added MN/PF OpLev to k1visitmxp's Model file. , __satoru.ikeda__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16199|16199]] Setup of IP , __ryutaro.takahashi__ |
Line 93: | Line 63: |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16195|16195]] Comment , __ryutaro.takahashi__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16185|16185]] Added MN/PF OpLev to k1visitmxp's Model file. , __satoru.ikeda__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16197|16197]] Comment , __satoru.ikeda__ * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16216|16216]] Comment , __satoru.ikeda__ '''IY''' * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16214|16214]] Preparation for disconnection of cryo-payload , __ryutaro.takahashi__ * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16217|16217]] Support for common Payload/Tower model files: Type-A (ITMY) is supported to TOWER_MASTER/PAYLOAD_MASTER. , __satoru.ikeda__ |
|
Line 95: | Line 72: |
* (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16180|16180]] Comment , __ryutaro.takahashi__ * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16181|16181]] Comment , __takaaki.yokozawa__ * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16182|16182]] Comment , __shinji.miyoki__ == Progress report == |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16180|16180]] Comment , __ryutaro.takahashi__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16181|16181]] Comment , __takaaki.yokozawa__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16182|16182]] Comment , __shinji.miyoki__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16198|16198]] Comment , __kouseki.miyo__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16201|16201]] Comment , __tomotada.akutsu__ '''PR3''' * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15976|15976]] Picomotor of PR3_BF_T(Motor2) got stuck , __satoru.ikeda__ * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16204|16204]] Comment , __fabian.arellano__ * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16207|16207]] Comment , __fabian.arellano__ * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16223|16223]] Comment , __fabian.arellano__ This is generated by python script in /users/Miyo/dropbox/Script/scrapping/main.py. == Progress Summary == |
Contents
Agenda/Minutes
CRY+VIS Interface Meeting
Date : 13:30-14:10
Participants : Takahashi, Sato, Ikeda, Ushiba, Kimura, Akutsu, Aso, Hirata, Miyo
Schedule
- IX: Oplev setting will be finished by 3/10. Mystery of 5-kg overload. The ballast on the F0 is too tall.
- IY: The vent was finished on 3/2. Disconnection is scheduled on 3/11.
- EX: Connection is scheduled in the week of 3/15.
Status
- Corrugate tube fixing jig: Re-measurement was performed in 2/25-3/2 at IYV.
- Commissioning in air: Commissioning of ITMX is delay. From June.
- Commissioning in vacuum:
- Acceptance check: Cryo-payload in IX/EX and Type-A tower in EY/IX are on going.
- PF actuator: Not evaluated in IX, but after the commissioning for suspension.
- Jig for FC painting:
- Overall commissioning: Schedule meeting is requested (after JPS meeting?).
- Procedure of TM height setting:
Discussion
- [Miyo] オフロード作業を無くすためのアイデア募集
- 問題意識:真空圧力が変わるとIPが傾いてPayloadが自身のEQフレームに当たる。(完全に傾かないようにする治具はそもそも不可能なので、傾いても大丈夫なアイデアがほしい。)
[Miyo] そもそも、IPが傾いてIPのEQストップに当たった状態でもPayloadも同じく当たらないよう十分に退避させれば良い話に思える。その場合、IPがEQに当たった状態でFRをつかってもとに戻せるかどうか確認すべき。これはAcceptanceCheckに追加すべきか?
VIS Meeting
14:10-15:30
Participants: Takahashi, Sato, Ikeda, Aso, Hirata, Miyo, Tanaka, Washimi, Sugiyama, Ishizaki, Fabian
Schedule
* The next week
- Type-A team: 3/9 IXV filter setting, 3/10-11 IYV payload disconnection
- Type-B team: 3/9 EXV withdrawal, 3/10-12 PR/SR adjustment
klog
EX
16183 Cleaning and transportation of components. , fabian.arellano
16142 IP and F0 stepper motor limit switches. , fabian.arellano
General
16200 Recovery of the signal generators in Type-B and Type-Bp suspensions. , fabian.arellano
IX
16185 Added MN/PF OpLev to k1visitmxp's Model file. , satoru.ikeda
16199 Setup of IP , ryutaro.takahashi
16118 Setup of filter chain , ryutaro.takahashi
16185 Added MN/PF OpLev to k1visitmxp's Model file. , satoru.ikeda
IY
16214 Preparation for disconnection of cryo-payload , ryutaro.takahashi
16217 Support for common Payload/Tower model files: Type-A (ITMY) is supported to TOWER_MASTER/PAYLOAD_MASTER. , satoru.ikeda
MCF
16157 Investigation of IMC suspensions , ryutaro.takahashi
PR3
15976 Picomotor of PR3_BF_T(Motor2) got stuck , satoru.ikeda
This is generated by python script in /users/Miyo/dropbox/Script/scrapping/main.py.
Progress Summary
TypeA
- Replacement of LVDT coils for F0 was finished in EX.
- Tuning of the filter chain is on going in IX.
TypeB
TypeBp
TypeC
- Investigation and recovery of the IMC suspensions were performed on 3/4.
Electronics
Control
Safety
Discussion
Travel Plans
The week from 3/8
- Takahashi: 3/8-3/12
- Sato: 3/8-3/12
- Hirata: 3/8-3/12
- Yano: 3/8-3/12
The week from 3/15
- Takahashi: 3/15-18
- Sato: 3/15-19
- Hirata: 3/15-19
- Yano: 3/15-19
Next meeting
- 2021/3/12(FRI)