Differences between revisions 9 and 10
Revision 9 as of 2021-03-11 06:52:16
Size: 5632
Editor: KousekiMiyo
Comment:
Revision 10 as of 2021-03-11 07:14:38
Size: 5720
Editor: KousekiMiyo
Comment:
Deletions are marked like this. Additions are marked like this.
Line 50: Line 50:
Line 77: Line 76:
  * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16225|16225]] Comment , __kouseki.miyo__

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date : 13:30-14:10

Participants : Takahashi, Sato, Ikeda, Ushiba, Kimura, Akutsu, Aso, Hirata, Miyo

Post O3 Upgrade portal

Schedule

  • IX: Oplev setting will be finished by 3/10. Mystery of 5-kg overload. The ballast on the F0 is too tall.
  • IY: The vent was finished on 3/2. Disconnection is scheduled on 3/11.
  • EX: Connection is scheduled in the week of 3/15.

Status

  • Corrugate tube fixing jig: Re-measurement was performed in 2/25-3/2 at IYV.
  • Commissioning in air: Commissioning of ITMX is delay. From June.
  • Commissioning in vacuum:
  • Acceptance check: Cryo-payload in IX/EX and Type-A tower in EY/IX are on going.
  • PF actuator: Not evaluated in IX, but after the commissioning for suspension.
  • Jig for FC painting:
  • Overall commissioning: Schedule meeting is requested (after JPS meeting?).
  • Procedure of TM height setting:

Discussion

  • [Miyo] オフロード作業を無くすためのアイデア募集
    • 問題意識:真空圧力が変わるとIPが傾いてPayloadが自身のEQフレームに当たる。(完全に傾かないようにする治具はそもそも不可能なので、傾いても大丈夫なアイデアがほしい。)
    • [Miyo] そもそも、IPが傾いてIPのEQストップに当たった状態でもPayloadも同じく当たらないよう十分に退避させれば良い話に思える。その場合、IPがEQに当たった状態でFRをつかってもとに戻せるかどうか確認すべき。これはAcceptanceCheckに追加すべきか?


VIS Meeting

14:10-15:30

Participants: Takahashi, Sato, Ikeda, Aso, Hirata, Miyo, Tanaka, Washimi, Sugiyama, Ishizaki, Fabian

Schedule

Schedule

* The next week

  • Type-A team: 3/9 IXV filter setting, 3/10-11 IYV payload disconnection
  • Type-B team: 3/9 EXV withdrawal, 3/10-12 PR/SR adjustment

klog

EX

  • 16183 Cleaning and transportation of components. , fabian.arellano

  • 16142 IP and F0 stepper motor limit switches. , fabian.arellano

    • 16170 Comment , satoru.ikeda

    • 16178 Comment , fabian.arellano

General

  • (!) 16200 Recovery of the signal generators in Type-B and Type-Bp suspensions. , fabian.arellano

IX

  • 16185 Added MN/PF OpLev to k1visitmxp's Model file. , satoru.ikeda

  • 16199 Setup of IP , ryutaro.takahashi

  • 16118 Setup of filter chain , ryutaro.takahashi

    • 16171 Comment , ryutaro.takahashi

    • 16195 Comment , ryutaro.takahashi

  • 16185 Added MN/PF OpLev to k1visitmxp's Model file. , satoru.ikeda

    • 16197 Comment , satoru.ikeda

    • (!) 16216 Comment , satoru.ikeda

IY

  • (!) 16214 Preparation for disconnection of cryo-payload , ryutaro.takahashi

  • (!) 16217 Support for common Payload/Tower model files: Type-A (ITMY) is supported to TOWER_MASTER/PAYLOAD_MASTER. , satoru.ikeda

MCF

  • 16157 Investigation of IMC suspensions , ryutaro.takahashi

    • 16180 Comment , ryutaro.takahashi

    • 16181 Comment , takaaki.yokozawa

    • 16182 Comment , shinji.miyoki

    • 16198 Comment , kouseki.miyo

    • 16201 Comment , tomotada.akutsu

    • (!) 16225 Comment , kouseki.miyo

PR3

  • 15976 Picomotor of PR3_BF_T(Motor2) got stuck , satoru.ikeda

    • (!) 16204 Comment , fabian.arellano

    • (!) 16207 Comment , fabian.arellano

    • (!) 16223 Comment , fabian.arellano

This is generated by python script in /users/Miyo/dropbox/Script/scrapping/main.py.

Summary Report

TypeA

  • Replacement of LVDT coils for F0 was finished in EX.
  • Tuning of the filter chain is on going in IX.

TypeB

TypeBp

TypeC

  • Investigation and recovery of the IMC suspensions were performed on 3/4.

Electronics

Control

Safety

Discussion

Travel Plans

The week from 3/8

  • Takahashi: 3/8-3/12
  • Sato: 3/8-3/12
  • Hirata: 3/8-3/12
  • Yano: 3/8-3/12

The week from 3/15

  • Takahashi: 3/15-18
  • Sato: 3/15-19
  • Hirata: 3/15-19
  • Yano: 3/15-19

Next meeting

  • 2021/3/12(FRI)

KAGRA/Subgroups/VIS/VISMinutes20210312 (last edited 2021-03-12 15:19:04 by RyutaroTakahashi)