Size: 3770
Comment:
|
Size: 5124
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 47: | Line 47: |
* (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16260|16260]] Connection of cryo-payload , __ryutaro.takahashi__ | * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16260|16260]] Connection of cryo-payload , __ryutaro.takahashi__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16271|16271]] Comment , __ryutaro.takahashi__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16275|16275]] Comment , __ryutaro.takahashi__ '''EY''' * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16276|16276]] Setup of F1 , __ryutaro.takahashi__ * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16288|16288]] Comment , __ryutaro.takahashi__ |
Line 49: | Line 54: |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16252|16252]] Common Type-C(OMMT1,OMMT2,OSTM) model. , __satoru.ikeda__ | |
Line 51: | Line 55: |
* (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16261|16261]] Comment , __satoru.ikeda__ | * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16261|16261]] Comment , __satoru.ikeda__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16269|16269]] Comment , __satoru.ikeda__ |
Line 53: | Line 58: |
* (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16262|16262]] Comment , __satoru.ikeda__ | * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16262|16262]] Comment , __satoru.ikeda__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16268|16268]] Comment , __satoru.ikeda__ '''IX''' * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16185|16185]] Added MN/PF OpLev to k1visitmxp's Model file. , __satoru.ikeda__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16278|16278]] Comment , __satoru.ikeda__ |
Line 57: | Line 66: |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16248|16248]] Comment , __satoru.ikeda__ | * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16248|16248]] Comment , __satoru.ikeda__ |
Line 59: | Line 68: |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16251|16251]] Comment , __naohisa.satou__ | * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16251|16251]] Comment , __naohisa.satou__ |
Line 62: | Line 71: |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16279|16279]] IMC oplev characterization and MCe oplev TX replacing , __tomotada.akutsu__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16157|16157]] Investigation of IMC suspensions , __ryutaro.takahashi__ * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16286|16286]] Comment , __kouseki.miyo__ |
|
Line 63: | Line 75: |
* (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16258|16258]] Setting the alignment of PR3. , __fabian.arellano__ | * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16258|16258]] Setting the alignment of PR3. , __fabian.arellano__ * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16287|16287]] Comparison of PR3 and SR3 wire clamps. , __fabian.arellano__ |
Line 65: | Line 78: |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16247|16247]] Comment , __fabian.arellano__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16246|16246]] Comment , __fabian.arellano__ |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16247|16247]] Comment , __fabian.arellano__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16246|16246]] Comment , __fabian.arellano__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16272|16272]] Tightening of the wire clamp screws. , __fabian.arellano__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16277|16277]] Comment , __fabian.arellano__ |
Contents
Agenda/Minutes
CRY+VIS Interface Meeting
Date : 13:30-
Participants : Post O3 Upgrade portal
Schedule
- IX: Oplev setting will be carried out in the next week. Yaw will be adjusted after rough alignment.
- IY:
- EX: Cryo-payload was installed. Release is scheduled on 3/22.
- EY: Installation of the F1 stage was started.
Status
- Corrugate tube fixing jig: They will be prepared by the end of May.
- Commissioning in air: From mid. May for IX.
- Commissioning in vacuum:
- Acceptance check: Cryo-payload in IX/EX and Type-A tower in EY/IX are on going.
- PF actuator: Not evaluated in IX, but after the commissioning for suspension.
- Jig for FC painting:
- Overall commissioning: Schedule meeting on 3/22.
- Procedure of TM height setting:
Discussion
VIS Meeting
14:00-
Participants:
Schedule
* The next week
- Type-A team: 3/22-26 installation in EY. 3/23 F0 tuning in EX.
- Type-B team: 3/22-26 Remedy in PR3.
Klog
EX
16260 Connection of cryo-payload , ryutaro.takahashi
EY
General
16234 Common Type-C(MCI,MCE,MCO,IMMT1,IMMT2) model. , satoru.ikeda
16252 Common Type-C(OMMT1,OMMT2,OSTM) model. , satoru.ikeda
IX
IY
16249 Connection of release sensors to DGS , ryutaro.takahashi
16091 Monitoring of IP by ITMY venting , satoru.ikeda
16248 Comment , satoru.ikeda
16249 Connection of release sensors to DGS , ryutaro.takahashi
16251 Comment , naohisa.satou
MCF
16242 MCi and MCo oplev TX replacing , tomotada.akutsu
16279 IMC oplev characterization and MCe oplev TX replacing , tomotada.akutsu
16157 Investigation of IMC suspensions , ryutaro.takahashi
16286 Comment , kouseki.miyo
PR3
16258 Setting the alignment of PR3. , fabian.arellano
16287 Comparison of PR3 and SR3 wire clamps. , fabian.arellano
16239 Test of PR3 mirror pitch stability using the Donald Trump method. , fabian.arellano
16272 Tightening of the wire clamp screws. , fabian.arellano
16277 Comment , fabian.arellano
This is generated by python script in /users/Miyo/dropbox/Script/scrapping/main.py.
Summary Report
TypeA
- Connected the cryo-payload to the BF in EX. The load for BF was roughly adjusted. The F1, F3, BF are working. The F0 overloads by 13kg.
- Started the setup of F1 in EY.
TypeB
TypeBp
TypeC
Electronics
Control
Safety
Discussion
Travel Plans
The week from 3/22
- Takahashi: 3/22-3/26
- Sato: 3/22-3/26
- Hirata: 3/22-3/26
- Yano: 3/22-3/26
The week from 3/29
- Takahashi: 3/29-4/2
- Sato: 3/29-4/2
- Hirata: 3/29-4/2
- Yano: 3/29-4/2
Next meeting
- 2021/3/26(FRI)