Differences between revisions 9 and 11 (spanning 2 versions)
Revision 9 as of 2021-03-18 19:07:44
Size: 3758
Comment:
Revision 11 as of 2021-03-19 08:59:05
Size: 5124
Editor: KousekiMiyo
Comment:
Deletions are marked like this. Additions are marked like this.
Line 47: Line 47:
 * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16260|16260]] Connection of cryo-payload , __ryutaro.takahashi__  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16260|16260]] Connection of cryo-payload , __ryutaro.takahashi__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16271|16271]] Comment , __ryutaro.takahashi__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16275|16275]] Comment , __ryutaro.takahashi__
'''EY'''
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16276|16276]] Setup of F1 , __ryutaro.takahashi__
  * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16288|16288]] Comment , __ryutaro.takahashi__
Line 49: Line 54:
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16252|16252]] Common Type-C(OMMT1,OMMT2,OSTM) model. , __satoru.ikeda__
Line 51: Line 55:
  * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16261|16261]] Comment , __satoru.ikeda__   * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16261|16261]] Comment ,  __satoru.ikeda__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16269|16269]] Comment , __satoru.ikeda__
Line 53: Line 58:
  * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16262|16262]] Comment , __satoru.ikeda__   * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16262|16262]] Comment , __satoru.ikeda__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16268|16268]] Comment , __satoru.ikeda__
'''IX'''
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16185|16185]] Added MN/PF OpLev to k1visitmxp's Model file. , __satoru.ikeda__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16278|16278]] Comment , __satoru.ikeda__
Line 57: Line 66:
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16248|16248]] Comment , __satoru.ikeda__   * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16248|16248]] Comment , __satoru.ikeda__
Line 59: Line 68:
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16251|16251]] Comment , __naohisa.satou__    * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16251|16251]] Comment , __naohisa.satou__
Line 62: Line 71:
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16279|16279]] IMC oplev characterization and MCe oplev TX replacing , __tomotada.akutsu__
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16157|16157]] Investigation of IMC suspensions , __ryutaro.takahashi__
  * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16286|16286]] Comment , __kouseki.miyo__
Line 63: Line 75:
 * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16258|16258]] Setting the alignment of PR3. , __fabian.arellano__  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16258|16258]] Setting the alignment of PR3. , __fabian.arellano__
 * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16287|16287]] Comparison of PR3 and SR3 wire clamps. , __fabian.arellano__
Line 65: Line 78:
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16247|16247]] Comment , __fabian.arellano__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16246|16246]] Comment , __fabian.arellano__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16247|16247]] Comment , __fabian.arellano__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16246|16246]] Comment , __fabian.arellano__
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16272|16272]] Tightening of the wire clamp screws. , __fabian.arellano__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16277|16277]] Comment , __fabian.arellano__
Line 72: Line 87:
 * Connected the cryo-payload to the BF. The load for BF was roughly adjusted. The F1, F3, BF are working. The F0 overloads by 13kg.
 * Started the setup of F1.
 * Connected the cryo-payload to the BF in EX. The load for BF was roughly adjusted. The F1, F3, BF are working. The F0 overloads by 13kg.
 * Started the setup of F1 in EY.

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date : 13:30-

Participants : Post O3 Upgrade portal

Schedule

  • IX: Oplev setting will be carried out in the next week. Yaw will be adjusted after rough alignment.
  • IY:
  • EX: Cryo-payload was installed. Release is scheduled on 3/22.
  • EY: Installation of the F1 stage was started.

Status

  • Corrugate tube fixing jig: They will be prepared by the end of May.
  • Commissioning in air: From mid. May for IX.
  • Commissioning in vacuum:
  • Acceptance check: Cryo-payload in IX/EX and Type-A tower in EY/IX are on going.
  • PF actuator: Not evaluated in IX, but after the commissioning for suspension.
  • Jig for FC painting:
  • Overall commissioning: Schedule meeting on 3/22.
  • Procedure of TM height setting:

Discussion


VIS Meeting

14:00-

Participants:

Schedule

Schedule

* The next week

  • Type-A team: 3/22-26 installation in EY. 3/23 F0 tuning in EX.
  • Type-B team: 3/22-26 Remedy in PR3.

Klog

EX

  • 16260 Connection of cryo-payload , ryutaro.takahashi

    • 16271 Comment , ryutaro.takahashi

    • 16275 Comment , ryutaro.takahashi

EY

  • 16276 Setup of F1 , ryutaro.takahashi

    • (!) 16288 Comment , ryutaro.takahashi

General

  • 16234 Common Type-C(MCI,MCE,MCO,IMMT1,IMMT2) model. , satoru.ikeda

    • 16261 Comment , satoru.ikeda

    • 16269 Comment , satoru.ikeda

  • 16252 Common Type-C(OMMT1,OMMT2,OSTM) model. , satoru.ikeda

    • 16262 Comment , satoru.ikeda

    • 16268 Comment , satoru.ikeda

IX

  • 16185 Added MN/PF OpLev to k1visitmxp's Model file. , satoru.ikeda

    • 16278 Comment , satoru.ikeda

IY

  • 16249 Connection of release sensors to DGS , ryutaro.takahashi

  • 16091 Monitoring of IP by ITMY venting , satoru.ikeda

    • 16248 Comment , satoru.ikeda

  • 16249 Connection of release sensors to DGS , ryutaro.takahashi

    • 16251 Comment , naohisa.satou

MCF

  • 16242 MCi and MCo oplev TX replacing , tomotada.akutsu

  • 16279 IMC oplev characterization and MCe oplev TX replacing , tomotada.akutsu

  • 16157 Investigation of IMC suspensions , ryutaro.takahashi

    • (!) 16286 Comment , kouseki.miyo

PR3

  • 16258 Setting the alignment of PR3. , fabian.arellano

  • (!) 16287 Comparison of PR3 and SR3 wire clamps. , fabian.arellano

  • 16239 Test of PR3 mirror pitch stability using the Donald Trump method. , fabian.arellano

    • 16247 Comment , fabian.arellano

    • 16246 Comment , fabian.arellano

  • 16272 Tightening of the wire clamp screws. , fabian.arellano

    • 16277 Comment , fabian.arellano

This is generated by python script in /users/Miyo/dropbox/Script/scrapping/main.py.

Summary Report

TypeA

  • Connected the cryo-payload to the BF in EX. The load for BF was roughly adjusted. The F1, F3, BF are working. The F0 overloads by 13kg.
  • Started the setup of F1 in EY.

TypeB

TypeBp

TypeC

Electronics

Control

Safety

Discussion

Travel Plans

The week from 3/22

  • Takahashi: 3/22-3/26
  • Sato: 3/22-3/26
  • Hirata: 3/22-3/26
  • Yano: 3/22-3/26

The week from 3/29

  • Takahashi: 3/29-4/2
  • Sato: 3/29-4/2
  • Hirata: 3/29-4/2
  • Yano: 3/29-4/2

Next meeting

  • 2021/3/26(FRI)