* IY: * EX: Oplev setting is on going. The payload has been released? * EY: Installation of the F1 stage was almost finished. Countermeasure for the contamination is scheduled on 4/5-6. Removing of the maraging rod is necessary. |
* IY: Remedy of the pre-isolator is scheduled in April. * EX: Oplev setting is on going. Payload was released on 4/1. F0 tuning is on going. * EY: Installation of the tower will be restarted in May. Countermeasure for the contamination is scheduled on 4/5-6. Removing of the maraging rod is necessary. |
Line 24: | Line 24: |
* Acceptance check: Check items for in-air commissioning should be confirmed on the payload. Present status of EYV was shown. | * Acceptance check: Check items for in-air commissioning should be confirmed on the payload. |
Line 27: | Line 27: |
* Overall commissioning: Schedule meeting was held on 3/22. | * Overall commissioning: |
Line 32: | Line 32: |
= VIS Meeting = 14:00- |
|
Line 33: | Line 35: |
= VIS Meeting = 14:15-15:00 Participants: Takahashi, Fabian, Aso, Hirata, Miyo, Ishizaki, Tanaka, Sato, Sugiyama |
Participants: |
Line 39: | Line 38: |
[[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/VIS/Schedule|Schedule]] | See [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/VIS/Schedule|Schedule]] |
Line 41: | Line 40: |
* The next week | '''Milestone''' |
Line 43: | Line 42: |
* Type-A team: 3/30-31 ACC in IX. 4/1-2 F0 tuning in EX. * Type-B team: 3/29-4/2 Remedy in PR3. |
* ''IMC suspensions are ready in air [40]'' will finish 2011/04/21. * ''PRs are ready in air [643]'' will finish 2011/07/09. * ''ETMX is ready in air [656]'' will finish 2021/08/25. * ''ITMX is ready in air [657]'' will finish 2021/08/31. * ''ETMY is ready in air [658]'' will finish 2021/09/16. * ''ITMY is ready in air [659]'' will finish 2021/11/08. * ''BS is ready in air [691]'' will finish 2011/11/24. * ''SRs are ready in air [663]'' will finish 2011/12/20. * ''Output suspensions are ready in air [695]'' will finish 2011/12/21. * ''TMSY is ready in air [708]'' will finish 2011/??/??. * ''TMSX is ready in air [684]'' will finish 2011/??/??. 2021/03/29 |
Line 48: | Line 58: |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16260|16260]] Connection of cryo-payload , __ryutaro.takahashi__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16271|16271]] Comment , __ryutaro.takahashi__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16275|16275]] Comment , __ryutaro.takahashi__ |
* (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16378|16378]] F0 tuning , __ryutaro.takahashi__ |
Line 54: | Line 61: |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16276|16276]] Setup of F1 , __ryutaro.takahashi__ * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16288|16288]] Comment , __ryutaro.takahashi__ |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16276|16276]] Setup of F1 , __ryutaro.takahashi__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16336|16336]] Comment , __naohisa.satou__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16353|16353]] Comment , __ryutaro.takahashi__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16366|16366]] Comment , __ryutaro.takahashi__ |
Line 59: | Line 66: |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16234|16234]] Common Type-C(MCI,MCE,MCO,IMMT1,IMMT2) model. , __satoru.ikeda__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16261|16261]] Comment , __satoru.ikeda__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16269|16269]] Comment , __satoru.ikeda__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16252|16252]] Common Type-C(OMMT1,OMMT2,OSTM) model. , __satoru.ikeda__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16262|16262]] Comment , __satoru.ikeda__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16268|16268]] Comment , __satoru.ikeda__ |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16349|16349]] Some of the EPICS channels have been changed to science frames , __satoru.ikeda__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16356|16356]] Added EPICS channel for , __satoru.ikeda__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16362|16362]] Update matrices for oplev segments , __kouseki.miyo__ |
Line 68: | Line 70: |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16185|16185]] Added MN/PF OpLev to k1visitmxp's Model file. , __satoru.ikeda__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16278|16278]] Comment , __satoru.ikeda__ '''IY''' * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16249|16249]] Connection of release sensors to DGS , __ryutaro.takahashi__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16091|16091]] Monitoring of IP by ITMY venting , __satoru.ikeda__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16248|16248]] Comment , __satoru.ikeda__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16249|16249]] Connection of release sensors to DGS , __ryutaro.takahashi__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16251|16251]] Comment , __naohisa.satou__ '''MCF''' * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16242|16242]] MCi and MCo oplev TX replacing , __tomotada.akutsu__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16279|16279]] IMC oplev characterization and MCe oplev TX replacing , __tomotada.akutsu__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16157|16157]] Investigation of IMC suspensions , __ryutaro.takahashi__ * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16286|16286]] Comment , __kouseki.miyo__ |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16365|16365]] Wiring the release sensor (outside the vacuum chamber) , __naohisa.satou__ |
Line 88: | Line 72: |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16258|16258]] Setting the alignment of PR3. , __fabian.arellano__ * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16287|16287]] Comparison of PR3 and SR3 wire clamps. , __fabian.arellano__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16239|16239]] Test of PR3 mirror pitch stability using the Donald Trump method. , __fabian.arellano__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16247|16247]] Comment , __fabian.arellano__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16246|16246]] Comment , __fabian.arellano__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16272|16272]] Tightening of the wire clamp screws. , __fabian.arellano__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16277|16277]] Comment , __fabian.arellano__ |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16348|16348]] Tightening the locating clamps for the piano wire. , __fabian.arellano__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16310|16310]] Preparation for testing the procedure to glue the piano wire at the locating clamps in the IM. , __fabian.arellano__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16338|16338]] Comment , __fabian.arellano__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16348|16348]] Tightening the locating clamps for the piano wire. , __fabian.arellano__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16355|16355]] Comment , __fabian.arellano__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16363|16363]] Comment , __fabian.arellano__ * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16370|16370]] Comment , __fabian.arellano__ * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16373|16373]] Comment , __fabian.arellano__ |
Line 101: | Line 85: |
EY cabling * According to the continuity check at F1, disconnection of the LVDT (actuator coil) of BF was found, but we have not been able to determine where the break occurred. |
|
Line 106: | Line 86: |
=== TypeBp PR3 === This week we did two tasks, both related with PR3 clamps: * We measured the gaps in PR3 locating clamps for the 200 um piano wire and * We tested applying adhesive to the wires within the grooves in the locating clamps. * One magnet from the IM OSEM flags was chipped. We need to get another one. See [[https://photos.app.goo.gl/3cu5TECSb8hXkkW56|this picture]]. Size of gaps * We used thickness gauges. * We measured the gaps in different places to take into account that the gaps are not necessarily uniform. * The largest gap size was between 170 um and 180 um. * The lowest one was between 70 um and 80 um. * The tickness of the clamped wire is 200 um. Gluing test. * Using a spare SR style clamp we tested the procedure. Let's see klog [[https://klog.icrr.u-tokyo.ac.jp//?r=16331|16331]] and [[https://klog.icrr.u-tokyo.ac.jp//?r=16338|16338]] for details. * The test was successful in the sense that the adhesive went into the gap and the grooves around the wires. However, I wonder if this tiny amount of glue would keep the wires in place. Is there another option before deciding to hang the mirror again? Yes * During the gluing test we saw that the outer locating clamps was not badly scared, neither the tungsten wire. See pictures. * In order to access the screws of the inner locating clamps to tighten them we could do something like this: * Lock the payload, remove the IRM side panels (already done). * Remove the coils from the back ring of the RM in ordet to protect the magnet standoffs. * Release the mirror from the RM and withdraw the lower screws by more than a few milimeters. * Lift the RM by 3 mm using the screws from the security structure. * Loosen the outer locating clamps and move the wires out of the way just enough for the tool to reach the inner screw. * Tighten the inner screws with 2 Nm torque. * Put the tungsten wires back in the grooves and tighten the clamp again. * Lower the RM * Etc. * Washimi-san and I can do preparation on Monday and on Tuesday we can tighten the screws with Hirata-san. |
=== TypeBp === |
Line 147: | Line 93: |
The week from 3/29 * Takahashi: 3/29-4/2 * Sato: 3/29-4/2 * Hirata: 3/29-4/2 * Yano: 3/29-31 |
|
Line 156: | Line 95: |
* Takahashi: 4/5-9 | * Takahashi: 4/5-8 |
Line 160: | Line 99: |
The week from 4/12 * Takahashi: 4/12-16 * Sato: 4/12-16 * Hirata: 4/12-16 |
|
Line 161: | Line 106: |
* 2021/4/2(FRI) | * 2021/4/9(FRI) |
Contents
Agenda/Minutes
CRY+VIS Interface Meeting
Date : 13:30-
Participants :
Schedule
- IX: Oplev will be finalized in April. ACC installation will be started in April.
- IY: Remedy of the pre-isolator is scheduled in April.
- EX: Oplev setting is on going. Payload was released on 4/1. F0 tuning is on going.
- EY: Installation of the tower will be restarted in May. Countermeasure for the contamination is scheduled on 4/5-6. Removing of the maraging rod is necessary.
Status
- Corrugate tube fixing jig: They will be prepared by the end of May.
- Commissioning in air: From mid. May for IX.
- Commissioning in vacuum:
- Acceptance check: Check items for in-air commissioning should be confirmed on the payload.
- PF actuator: Not evaluated in IX, but after the commissioning for suspension.
- Jig for FC painting:
- Overall commissioning:
- Procedure of TM height setting: More information on the range and limit is necessary to decide procedure. Prepare for the measurement in the first in-vacuum commissioning in IX.
Discussion
VIS Meeting
14:00-
Participants:
Schedule
See Schedule
Milestone
IMC suspensions are ready in air [40] will finish 2011/04/21.
PRs are ready in air [643] will finish 2011/07/09.
ETMX is ready in air [656] will finish 2021/08/25.
ITMX is ready in air [657] will finish 2021/08/31.
ETMY is ready in air [658] will finish 2021/09/16.
ITMY is ready in air [659] will finish 2021/11/08.
BS is ready in air [691] will finish 2011/11/24.
SRs are ready in air [663] will finish 2011/12/20.
Output suspensions are ready in air [695] will finish 2011/12/21.
TMSY is ready in air [708] will finish 2011/??/??.
TMSX is ready in air [684] will finish 2011/??/??.
2021/03/29
Klog
EX
16378 F0 tuning , ryutaro.takahashi
EY
16276 Setup of F1 , ryutaro.takahashi
General
16349 Some of the EPICS channels have been changed to science frames , satoru.ikeda
16356 Added EPICS channel for , satoru.ikeda
16362 Update matrices for oplev segments , kouseki.miyo
IX
16365 Wiring the release sensor (outside the vacuum chamber) , naohisa.satou
PR3
16348 Tightening the locating clamps for the piano wire. , fabian.arellano
16310 Preparation for testing the procedure to glue the piano wire at the locating clamps in the IM. , fabian.arellano
16338 Comment , fabian.arellano
16348 Tightening the locating clamps for the piano wire. , fabian.arellano
This is generated by python script in /users/Miyo/dropbox/Script/scrapping/main.py.
Summary Report
TypeA
TypeB
TypeBp
TypeC
Electronics
Control
Safety
Discussion
Travel Plans
The week from 4/5
- Takahashi: 4/5-8
- Sato: 4/5-9
- Hirata: 4/5-9
The week from 4/12
- Takahashi: 4/12-16
- Sato: 4/12-16
- Hirata: 4/12-16
Next meeting