=== TypeBp PR3 === === TypeBp ===

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date : 13:30-

Participants :

Post O3 Upgrade portal

Schedule

  • IX: Oplev will be finalized in April. ACC installation will be started in April.
  • IY:
  • EX: Oplev setting is on going. Payload was released on 4/1. F0 tuning is on going.
  • EY: Installation of the tower will be restarted in May. Countermeasure for the contamination is scheduled on 4/5-6. Removing of the maraging rod is necessary.

Status

  • Corrugate tube fixing jig: They will be prepared by the end of May.
  • Commissioning in air: From mid. May for IX.
  • Commissioning in vacuum:
  • Acceptance check: Check items for in-air commissioning should be confirmed on the payload.
  • PF actuator: Not evaluated in IX, but after the commissioning for suspension.
  • Jig for FC painting:
  • Overall commissioning:
  • Procedure of TM height setting: More information on the range and limit is necessary to decide procedure. Prepare for the measurement in the first in-vacuum commissioning in IX.

Discussion


VIS Meeting

14:00-

Participants:

Schedule

See Schedule

Milestone

  • IMC suspensions are ready in air [40] will finish 2011/04/21.

  • PRs are ready in air [643] will finish 2011/07/09.

  • ETMX is ready in air [656] will finish 2021/08/25.

  • ITMX is ready in air [657] will finish 2021/08/31.

  • ETMY is ready in air [658] will finish 2021/09/16.

  • ITMY is ready in air [659] will finish 2021/11/08.

  • BS is ready in air [691] will finish 2011/11/24.

  • SRs are ready in air [663] will finish 2011/12/20.

  • Output suspensions are ready in air [695] will finish 2011/12/21.

  • TMSY is ready in air [708] will finish 2011/??/??.

  • TMSX is ready in air [684] will finish 2011/??/??.

2021/03/29

Klog

EY

  • 16276 Setup of F1 , ryutaro.takahashi

    • 16336 Comment , naohisa.satou

  • (!) 16353 Comment , ryutaro.takahashi

General

  • 16349 Some of the EPICS channels have been changed to science frames , satoru.ikeda

  • (!) 16356 Added EPICS channel for , satoru.ikeda

PR3

  • 16310 Preparation for testing the procedure to glue the piano wire at the locating clamps in the IM. , fabian.arellano

    • 16338 Comment , fabian.arellano

  • 16348 Tightening the locating clamps for the piano wire. , fabian.arellano

    • (!) 16355 Comment , fabian.arellano

This is generated by python script in /users/Miyo/dropbox/Script/scrapping/main.py.

Summary Report

TypeA

TypeB

TypeBp

TypeC

Electronics

Control

Safety

Discussion

Travel Plans

The week from 4/5

  • Takahashi: 4/5-8
  • Sato: 4/5-9
  • Hirata: 4/5-9

The week from 4/12

  • Takahashi: 4/12-16
  • Sato: 4/12-16
  • Hirata: 4/12-16

Next meeting

  • 2021/4/9(FRI)

KAGRA/Subgroups/VIS/VISMinutes20210402 (last edited 2021-04-02 16:31:50 by RyutaroTakahashi)