3634
Comment:
|
4814
|
Deletions are marked like this. | Additions are marked like this. |
Line 10: | Line 10: |
Participants : | Participants : |
Line 15: | Line 15: |
* IX: Oplev will be finalized in April. ACC installation will be started in April. * IY: * EX: Oplev setting is on going. Payload was released on 4/1. F0 tuning is on going. |
* IX: Oplev will be finalized in April. Height and alignment adjustments are planed on 4/7-8. ACC will be installed in April. * IY: Remedy of the pre-isolator is scheduled in April. * EX: Oplev setting is on going. Payload was released on 4/1. F0 was tuned. |
Line 32: | Line 32: |
Line 36: | Line 35: |
Participants: | Participants: |
Line 41: | Line 40: |
* Type-A team: MCo 4/6, IXV 4/7-8 * Type-B team: PR3 4/5-9 |
|
Line 42: | Line 44: |
Line 53: | Line 56: |
Line 56: | Line 60: |
'''EX''' * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16378|16378]] F0 tuning , __ryutaro.takahashi__ |
|
Line 58: | Line 65: |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16276|16276]] Setup of F1 , __ryutaro.takahashi__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16336|16336]] Comment , __naohisa.satou__ * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16353|16353]] Comment , __ryutaro.takahashi__ |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16276|16276]] Setup of F1 , __ryutaro.takahashi__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16336|16336]] Comment , __naohisa.satou__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16353|16353]] Comment , __ryutaro.takahashi__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16366|16366]] Comment , __ryutaro.takahashi__ |
Line 62: | Line 72: |
Line 63: | Line 74: |
* (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16356|16356]] Added EPICS channel for , __satoru.ikeda__ | * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16356|16356]] Added EPICS channel for , __satoru.ikeda__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16362|16362]] Update matrices for oplev segments , __kouseki.miyo__ '''IX''' * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16365|16365]] Wiring the release sensor (outside the vacuum chamber) , __naohisa.satou__ |
Line 65: | Line 82: |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16310|16310]] Preparation for testing the procedure to glue the piano wire at the locating clamps in the IM. , __fabian.arellano__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16338|16338]] Comment , __fabian.arellano__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16348|16348]] Tightening the locating clamps for the piano wire. , __fabian.arellano__ * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16355|16355]] Comment , __fabian.arellano__ |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16348|16348]] Tightening the locating clamps for the piano wire. , __fabian.arellano__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16310|16310]] Preparation for testing the procedure to glue the piano wire at the locating clamps in the IM. , __fabian.arellano__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16338|16338]] Comment , __fabian.arellano__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16348|16348]] Tightening the locating clamps for the piano wire. , __fabian.arellano__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16355|16355]] Comment , __fabian.arellano__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16363|16363]] Comment , __fabian.arellano__ * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16370|16370]] Comment , __fabian.arellano__ * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16373|16373]] Comment , __fabian.arellano__ |
Line 71: | Line 93: |
Line 75: | Line 98: |
I will explain using [[https://1drv.ms/b/s!AoQaV1tdsEcUgeNmg0hHZMMSejqOdA?e=AI19Xb|this short presentation]] about the adjustment of PR3 inner wire locating clamps. |
Contents
Agenda/Minutes
CRY+VIS Interface Meeting
Date : 13:30-
Participants :
Schedule
- IX: Oplev will be finalized in April. Height and alignment adjustments are planed on 4/7-8. ACC will be installed in April.
- IY: Remedy of the pre-isolator is scheduled in April.
- EX: Oplev setting is on going. Payload was released on 4/1. F0 was tuned.
- EY: Installation of the tower will be restarted in May. Countermeasure for the contamination is scheduled on 4/5-6. Removing of the maraging rod is necessary.
Status
- Corrugate tube fixing jig: They will be prepared by the end of May.
- Commissioning in air: From mid. May for IX.
- Commissioning in vacuum:
- Acceptance check: Check items for in-air commissioning should be confirmed on the payload.
- PF actuator: Not evaluated in IX, but after the commissioning for suspension.
- Jig for FC painting:
- Overall commissioning:
- Procedure of TM height setting: More information on the range and limit is necessary to decide procedure. Prepare for the measurement in the first in-vacuum commissioning in IX.
Discussion
VIS Meeting
14:00-
Participants:
Schedule
See Schedule
- Type-A team: MCo 4/6, IXV 4/7-8
- Type-B team: PR3 4/5-9
Milestone
IMC suspensions are ready in air [40] will finish 2011/04/21.
PRs are ready in air [643] will finish 2011/07/09.
ETMX is ready in air [656] will finish 2021/08/25.
ITMX is ready in air [657] will finish 2021/08/31.
ETMY is ready in air [658] will finish 2021/09/16.
ITMY is ready in air [659] will finish 2021/11/08.
BS is ready in air [691] will finish 2011/11/24.
SRs are ready in air [663] will finish 2011/12/20.
Output suspensions are ready in air [695] will finish 2011/12/21.
TMSY is ready in air [708] will finish 2011/??/??.
TMSX is ready in air [684] will finish 2011/??/??.
2021/03/29
Klog
EX
16378 F0 tuning , ryutaro.takahashi
EY
16276 Setup of F1 , ryutaro.takahashi
General
16349 Some of the EPICS channels have been changed to science frames , satoru.ikeda
16356 Added EPICS channel for , satoru.ikeda
16362 Update matrices for oplev segments , kouseki.miyo
IX
16365 Wiring the release sensor (outside the vacuum chamber) , naohisa.satou
PR3
16348 Tightening the locating clamps for the piano wire. , fabian.arellano
16310 Preparation for testing the procedure to glue the piano wire at the locating clamps in the IM. , fabian.arellano
16338 Comment , fabian.arellano
16348 Tightening the locating clamps for the piano wire. , fabian.arellano
This is generated by python script in /users/Miyo/dropbox/Script/scrapping/main.py.
Summary Report
TypeA
TypeB
TypeBp
I will explain using this short presentation about the adjustment of PR3 inner wire locating clamps.
TypeC
Electronics
Control
Safety
Discussion
Travel Plans
The week from 4/5
- Takahashi: 4/5-8
- Sato: 4/5-9
- Hirata: 4/5-9
The week from 4/12
- Takahashi: 4/12-16
- Sato: 4/12-16
- Hirata: 4/12-16
Next meeting
- 2021/4/9(FRI)