Differences between revisions 16 and 22 (spanning 6 versions)
Revision 16 as of 2021-04-01 22:54:10
Size: 3634
Comment:
Revision 22 as of 2021-04-02 12:59:05
Size: 4814
Comment:
Deletions are marked like this. Additions are marked like this.
Line 10: Line 10:
Participants :  Participants :
Line 15: Line 15:
 * IX: Oplev will be finalized in April. ACC installation will be started in April.
 * IY:
 * EX: Oplev setting is on going. Payload was released on 4/1. F0 tuning is on going.
 * IX: Oplev will be finalized in April. Height and alignment adjustments are planed on 4/7-8. ACC will be installed in April.
 * IY: Remedy of the pre-isolator is scheduled in April.
 * EX: Oplev setting is on going. Payload was released on 4/1. F0 was tuned.
Line 32: Line 32:
Line 36: Line 35:
Participants:  Participants:
Line 41: Line 40:
 * Type-A team: MCo 4/6, IXV 4/7-8
 * Type-B team: PR3 4/5-9
Line 42: Line 44:
Line 53: Line 56:
Line 56: Line 60:
'''EX'''

 * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16378|16378]] F0 tuning , __ryutaro.takahashi__
Line 58: Line 65:
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16276|16276]] Setup of F1 , __ryutaro.takahashi__    * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16336|16336]] Comment , __naohisa.satou__
 * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16353|16353]] Comment , __ryutaro.takahashi__

* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16276|16276]] Setup of F1 , __ryutaro.takahashi__
 
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16336|16336]] Comment , __naohisa.satou__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16353|16353]] Comment ,  __ryutaro.takahashi__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16366|16366]] Comment , __ryutaro.takahashi__
Line 62: Line 72:
Line 63: Line 74:
 * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16356|16356]] Added EPICS channel for , __satoru.ikeda__  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16356|16356]] Added EPICS channel for , __satoru.ikeda__
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16362|16362]] Update matrices for oplev segments , __kouseki.miyo__

'''IX'''

 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16365|16365]] Wiring the release sensor (outside the vacuum chamber) , __naohisa.satou__
Line 65: Line 82:
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16310|16310]] Preparation for testing the procedure to glue the piano wire at the locating clamps in the IM. , __fabian.arellano__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16338|16338]] Comment , __fabian.arellano__
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16348|16348]] Tightening the locating clamps for the piano wire. , __fabian.arellano__
  * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16355|16355]] Comment , __fabian.arellano__

 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16348|16348]] Tightening the locating clamps for the piano wire. , __fabian.arellano__
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16310|16310]] Preparation for testing the procedure to glue the piano wire at the locating clamps in the IM. , __fabian.arellano__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16338|16338]] Comment , __fabian.arellano__
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16348|16348]] Tightening the locating clamps for the piano wire. , __fabian.arellano__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16355|16355]] Comment , __fabian.arellano__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16363|16363]] Comment , __fabian.arellano__
  * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16370|16370]] Comment , __fabian.arellano__
  * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16373|16373]] Comment , __fabian.arellano__
Line 71: Line 93:
Line 75: Line 98:
I will explain using [[https://1drv.ms/b/s!AoQaV1tdsEcUgeNmg0hHZMMSejqOdA?e=AI19Xb|this short presentation]] about the adjustment of PR3 inner wire locating clamps.

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date : 13:30-

Participants :

Post O3 Upgrade portal

Schedule

  • IX: Oplev will be finalized in April. Height and alignment adjustments are planed on 4/7-8. ACC will be installed in April.
  • IY: Remedy of the pre-isolator is scheduled in April.
  • EX: Oplev setting is on going. Payload was released on 4/1. F0 was tuned.
  • EY: Installation of the tower will be restarted in May. Countermeasure for the contamination is scheduled on 4/5-6. Removing of the maraging rod is necessary.

Status

  • Corrugate tube fixing jig: They will be prepared by the end of May.
  • Commissioning in air: From mid. May for IX.
  • Commissioning in vacuum:
  • Acceptance check: Check items for in-air commissioning should be confirmed on the payload.
  • PF actuator: Not evaluated in IX, but after the commissioning for suspension.
  • Jig for FC painting:
  • Overall commissioning:
  • Procedure of TM height setting: More information on the range and limit is necessary to decide procedure. Prepare for the measurement in the first in-vacuum commissioning in IX.

Discussion


VIS Meeting

14:00-

Participants:

Schedule

See Schedule

  • Type-A team: MCo 4/6, IXV 4/7-8
  • Type-B team: PR3 4/5-9

Milestone

  • IMC suspensions are ready in air [40] will finish 2011/04/21.

  • PRs are ready in air [643] will finish 2011/07/09.

  • ETMX is ready in air [656] will finish 2021/08/25.

  • ITMX is ready in air [657] will finish 2021/08/31.

  • ETMY is ready in air [658] will finish 2021/09/16.

  • ITMY is ready in air [659] will finish 2021/11/08.

  • BS is ready in air [691] will finish 2011/11/24.

  • SRs are ready in air [663] will finish 2011/12/20.

  • Output suspensions are ready in air [695] will finish 2011/12/21.

  • TMSY is ready in air [708] will finish 2011/??/??.

  • TMSX is ready in air [684] will finish 2011/??/??.

2021/03/29

Klog

EX

  • (!) 16378 F0 tuning , ryutaro.takahashi

EY

  • 16276 Setup of F1 , ryutaro.takahashi

    • 16336 Comment , naohisa.satou

    • 16353 Comment , ryutaro.takahashi

    • 16366 Comment , ryutaro.takahashi

General

  • 16349 Some of the EPICS channels have been changed to science frames , satoru.ikeda

  • 16356 Added EPICS channel for , satoru.ikeda

  • 16362 Update matrices for oplev segments , kouseki.miyo

IX

  • 16365 Wiring the release sensor (outside the vacuum chamber) , naohisa.satou

PR3

  • 16348 Tightening the locating clamps for the piano wire. , fabian.arellano

  • 16310 Preparation for testing the procedure to glue the piano wire at the locating clamps in the IM. , fabian.arellano

    • 16338 Comment , fabian.arellano

  • 16348 Tightening the locating clamps for the piano wire. , fabian.arellano

    • 16355 Comment , fabian.arellano

    • 16363 Comment , fabian.arellano

    • (!) 16370 Comment , fabian.arellano

    • (!) 16373 Comment , fabian.arellano

This is generated by python script in /users/Miyo/dropbox/Script/scrapping/main.py.

Summary Report

TypeA

TypeB

TypeBp

I will explain using this short presentation about the adjustment of PR3 inner wire locating clamps.

TypeC

Electronics

Control

Safety

Discussion

Travel Plans

The week from 4/5

  • Takahashi: 4/5-8
  • Sato: 4/5-9
  • Hirata: 4/5-9

The week from 4/12

  • Takahashi: 4/12-16
  • Sato: 4/12-16
  • Hirata: 4/12-16

Next meeting

  • 2021/4/9(FRI)

KAGRA/Subgroups/VIS/VISMinutes20210402 (last edited 2021-04-02 16:31:50 by RyutaroTakahashi)