⇤ ← Revision 1 as of 2021-04-06 08:51:32
Size: 4968
Comment:
|
Size: 3564
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 61: | Line 61: |
* (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16378|16378]] F0 tuning , __ryutaro.takahashi__ '''EY''' * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16276|16276]] Setup of F1 , __ryutaro.takahashi__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16336|16336]] Comment , __naohisa.satou__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16353|16353]] Comment , __ryutaro.takahashi__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16366|16366]] Comment , __ryutaro.takahashi__ |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16378|16378]] F0 tuning , __ryutaro.takahashi__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16382|16382]] Comment , __ryutaro.takahashi__ |
Line 72: | Line 64: |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16349|16349]] Some of the EPICS channels have been changed to science frames , __satoru.ikeda__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16356|16356]] Added EPICS channel for , __satoru.ikeda__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16362|16362]] Update matrices for oplev segments , __kouseki.miyo__ '''IX''' * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16365|16365]] Wiring the release sensor (outside the vacuum chamber) , __naohisa.satou__ '''PR3''' * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16348|16348]] Tightening the locating clamps for the piano wire. , __fabian.arellano__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16310|16310]] Preparation for testing the procedure to glue the piano wire at the locating clamps in the IM. , __fabian.arellano__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16338|16338]] Comment , __fabian.arellano__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16348|16348]] Tightening the locating clamps for the piano wire. , __fabian.arellano__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16355|16355]] Comment , __fabian.arellano__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16363|16363]] Comment , __fabian.arellano__ * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16370|16370]] Comment , __fabian.arellano__ * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16373|16373]] Comment , __fabian.arellano__ |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16383|16383]] Fixed that ACC and VEL of Picomotor Ch1 was different from other Ch2 to 4. , __satoru.ikeda__ * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16391|16391]] Supported for common Payload model files: Type-Bp(PR3) to PAYLOAD_MASTER , __satoru.ikeda__ |
Line 93: | Line 68: |
Contents
Agenda/Minutes
CRY+VIS Interface Meeting
Date : 13:30-14:30
Participants : Takahashi, Hirata, Sato, Aso, Ushiba, Ikeda, Miyo, Akutsu, Kimura, Tomaru
Schedule
- IX: Oplev will be finalized in April. Height and alignment adjustments are planed on 4/7-8. ACC will be installed in April.
- IY: Remedy of the pre-isolator is scheduled in April.
- EX: Oplev setting is on going. Payload was released on 4/1. F0 was tuned.
- EY: Installation of the tower will be restarted in May. Countermeasure for the contamination is scheduled on 4/5-6. Removing of the maraging rod is necessary.
Status
- Corrugate tube fixing jig: They will be prepared by the end of May.
- Commissioning in air: From mid. May for IX.
- Commissioning in vacuum:
- Acceptance check: Check items for in-air commissioning should be confirmed on the payload.
- PF actuator: Not evaluated in IX, but after the commissioning for suspension.
- Jig for FC painting:
- Overall commissioning:
- Procedure of TM height setting: More information on the range and limit is necessary to decide procedure. Prepare for the measurement in the first in-vacuum commissioning in IX.
Discussion
VIS Meeting
14:30-15:10
Participants: Takahashi, Fabian, Tanaka, Sugiyama, Terrence,Aso, Hirata, Sato, Miyo
Schedule
See Schedule
- Type-A team: MCo 4/6, IXV 4/7-8
- Type-B team: PR3 4/5-9
Milestone
IMC suspensions are ready in air [40] will finish 2011/04/21.
PRs are ready in air [643] will finish 2011/07/09.
ETMX is ready in air [656] will finish 2021/08/25.
ITMX is ready in air [657] will finish 2021/08/31.
ETMY is ready in air [658] will finish 2021/09/16.
ITMY is ready in air [659] will finish 2021/11/08.
BS is ready in air [691] will finish 2011/11/24.
SRs are ready in air [663] will finish 2011/12/20.
Output suspensions are ready in air [695] will finish 2011/12/21.
TMSY is ready in air [708] will finish 2011/??/??.
TMSX is ready in air [684] will finish 2011/??/??.
2021/03/29
Klog
EX
General
16383 Fixed that ACC and VEL of Picomotor Ch1 was different from other Ch2 to 4. , satoru.ikeda
16391 Supported for common Payload model files: Type-Bp(PR3) to PAYLOAD_MASTER , satoru.ikeda
This is generated by python script in /users/Miyo/dropbox/Script/scrapping/main.py.
Summary Report
TypeA
TypeB
TypeBp
I will explain using this short presentation about the adjustment of PR3 inner wire locating clamps.
TypeC
Electronics
Control
Safety
Discussion
Travel Plans
The week from 4/5
- Takahashi: 4/5-8
- Sato: 4/5-9
- Hirata: 4/5-9
The week from 4/12
- Takahashi: 4/12-16
- Sato: 4/12-16
- Hirata: 4/12-16
Next meeting
- 2021/4/9(FRI)