Line 8: | Line 8: |
Date : 13:30-14:30 | Date : 13:30- |
Line 10: | Line 10: |
Participants : Takahashi, Hirata, Sato, Aso, Ushiba, Ikeda, Miyo, Akutsu, Kimura, Tomaru | Participants : |
Line 15: | Line 15: |
* IX: Oplev will be finalized in April. Height and alignment adjustments are planed on 4/7-8. ACC will be installed in April. | * IX: Oplev will be finalized in April. Height and alignment adjustments are on going. ACC will be installed in April. * Investigation of the behavior of BF. * Wide range FR for the F0. * Adjustment of the height of pre-isolator using the piston. |
Line 17: | Line 20: |
* EX: Oplev setting is on going. Payload was released on 4/1. F0 was tuned. * EY: Installation of the tower will be restarted in May. Countermeasure for the contamination is scheduled on 4/5-6. Removing of the maraging rod is necessary. |
* EX: Oplev setting is on going. * EY: Installation of the tower will be restarted in May. Removing of the maraging rod is necessary. |
Line 25: | Line 28: |
* PF actuator: Not evaluated in IX, but after the commissioning for suspension. | * PF actuator: After the commissioning for suspension. |
Line 28: | Line 31: |
* Procedure of TM height setting: More information on the range and limit is necessary to decide procedure. Prepare for the measurement in the first in-vacuum commissioning in IX. | * Procedure of TM height setting: Prepare for the measurement in the first in-vacuum commissioning in IX. |
Line 33: | Line 36: |
14:30-15:10 | 14:30- |
Line 35: | Line 38: |
Participants: Takahashi, Fabian, Tanaka, Sugiyama, Terrence,Aso, Hirata, Sato, Miyo | Participants: |
Line 40: | Line 43: |
* Type-A team: MCo 4/6, IXV 4/7-8 * Type-B team: PR3 4/5-9 |
* Type-A team: IXV 4/13-16 * Type-B team: PR2 4/13-16 |
Line 60: | Line 63: |
Line 61: | Line 65: |
* (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16378|16378]] F0 tuning , __ryutaro.takahashi__ '''EY''' * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16276|16276]] Setup of F1 , __ryutaro.takahashi__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16336|16336]] Comment , __naohisa.satou__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16353|16353]] Comment , __ryutaro.takahashi__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16366|16366]] Comment , __ryutaro.takahashi__ |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16378|16378]] F0 tuning , __ryutaro.takahashi__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16382|16382]] Comment , __ryutaro.takahashi__ |
Line 72: | Line 69: |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16349|16349]] Some of the EPICS channels have been changed to science frames , __satoru.ikeda__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16356|16356]] Added EPICS channel for , __satoru.ikeda__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16362|16362]] Update matrices for oplev segments , __kouseki.miyo__ |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16383|16383]] Fixed that ACC and VEL of Picomotor Ch1 was different from other Ch2 to 4. , __satoru.ikeda__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16391|16391]] Supported for common Payload model files: Type-Bp(PR3) to PAYLOAD_MASTER , __satoru.ikeda__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16402|16402]] Change the name of EPICS channel in MASTERSWITCH , __satoru.ikeda__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16391|16391]] Supported for common Payload model files: Type-Bp(PR3) to PAYLOAD_MASTER , __satoru.ikeda__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16401|16401]] Comment , __satoru.ikeda__ |
Line 78: | Line 76: |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16421|16421]] Height adjustment of ITMX , __ryutaro.takahashi__ * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16428|16428]] Height measurement of ITMX , __takafumi.ushiba__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16365|16365]] Wiring the release sensor (outside the vacuum chamber) , __naohisa.satou__ * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16438|16438]] Comment , __naohisa.satou__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16421|16421]] Height adjustment of ITMX , __ryutaro.takahashi__ * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16431|16431]] Comment , __ryutaro.takahashi__ |
|
Line 79: | Line 83: |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16365|16365]] Wiring the release sensor (outside the vacuum chamber) , __naohisa.satou__ | '''MCF''' * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16405|16405]] Unable to connect Picomotor in MCO , __satoru.ikeda__ '''PR2''' * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16406|16406]] Inspection of locating wire inner clamps , __fabian.arellano__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16416|16416]] Comment , __fabian.arellano__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16417|16417]] Tightening of the inner wire locating clamps. , __fabian.arellano__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16418|16418]] Comment , __tomotada.akutsu__ * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16427|16427]] Comment , __fabian.arellano__ |
Line 82: | Line 94: |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16348|16348]] Tightening the locating clamps for the piano wire. , __fabian.arellano__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16310|16310]] Preparation for testing the procedure to glue the piano wire at the locating clamps in the IM. , __fabian.arellano__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16338|16338]] Comment , __fabian.arellano__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16348|16348]] Tightening the locating clamps for the piano wire. , __fabian.arellano__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16355|16355]] Comment , __fabian.arellano__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16363|16363]] Comment , __fabian.arellano__ * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16370|16370]] Comment , __fabian.arellano__ * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16373|16373]] Comment , __fabian.arellano__ |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16422|16422]] Install the OpLev box on the PR3 pylon , __kouseki.miyo__ |
Line 93: | Line 97: |
Line 97: | Line 102: |
=== TypeBp === I will explain using [[https://1drv.ms/b/s!AoQaV1tdsEcUgeNmg0hHZMMSejqOdA?e=AI19Xb|this short presentation]] about the adjustment of PR3 inner wire locating clamps. |
=== Type-Bp PR2 === This week we inspected and tightened the wires clapms in PR2. We followed the same procedure as in PR3, so I won't write any details here. * We removed the IRM side panels and measure the gaps in different places using thickness gauges: * Largest gap: 220 um close the wire, but smaller exactly where the wire is. * Smallest gap: (50 , 60 ) um. * We tightened the clamps according to the specification: 10 Nm for the weight holding ones and 2 Nm for the locating ones. * 10 out of 12 screws rotated by small amounts when tightened, however, * The two screws of the locating clamp at the +Y side were completely loose. * After we re-assembled and released the payload we realized it had a lot of negative pitch (I wrote positive in the klog, sorry) and at least one OSEM flag was touching. * We corrected the pitch with the picomotor. * We also moved the BF keystone close to nominal position with the fishing rod. * Then we corrected IM yaw. * We found picomotor cables and stepper motor cables disconnected, so we connected them. * By the end of today's work the IM seemed to be hanging free. * We tried to measure TFs, but it seems the actuation is not going through because of a problem in the real-time model. Miyo-kun and Ikeda-san will take a look. |
Line 101: | Line 120: |
* Before pumping down the IMC area, we have to write acceptance document for review. This document will be organized by Akutsu-san with some VIS people (Miyo, Takahashi) * |
|
Line 106: | Line 129: |
The week from 4/5 * Takahashi: 4/5-8 * Sato: 4/5-9 * Hirata: 4/5-9 |
|
Line 118: | Line 135: |
The week from 4/19 * Takahashi: 4/19-23 * Sato: 4/19-23 * Hirata: 4/19-23 |
|
Line 119: | Line 142: |
* 2021/4/9(FRI) | * 2021/4/16(FRI) |
Contents
Agenda/Minutes
CRY+VIS Interface Meeting
Date : 13:30-
Participants :
Schedule
- IX: Oplev will be finalized in April. Height and alignment adjustments are on going. ACC will be installed in April.
- Investigation of the behavior of BF.
- Wide range FR for the F0.
- Adjustment of the height of pre-isolator using the piston.
- IY: Remedy of the pre-isolator is scheduled in April.
- EX: Oplev setting is on going.
- EY: Installation of the tower will be restarted in May. Removing of the maraging rod is necessary.
Status
- Corrugate tube fixing jig: They will be prepared by the end of May.
- Commissioning in air: From mid. May for IX.
- Commissioning in vacuum:
- Acceptance check: Check items for in-air commissioning should be confirmed on the payload.
- PF actuator: After the commissioning for suspension.
- Jig for FC painting:
- Overall commissioning:
- Procedure of TM height setting: Prepare for the measurement in the first in-vacuum commissioning in IX.
Discussion
VIS Meeting
14:30-
Participants:
Schedule
See Schedule
- Type-A team: IXV 4/13-16
- Type-B team: PR2 4/13-16
Milestone
IMC suspensions are ready in air [40] will finish 2011/04/21.
PRs are ready in air [643] will finish 2011/07/09.
ETMX is ready in air [656] will finish 2021/08/25.
ITMX is ready in air [657] will finish 2021/08/31.
ETMY is ready in air [658] will finish 2021/09/16.
ITMY is ready in air [659] will finish 2021/11/08.
BS is ready in air [691] will finish 2011/11/24.
SRs are ready in air [663] will finish 2011/12/20.
Output suspensions are ready in air [695] will finish 2011/12/21.
TMSY is ready in air [708] will finish 2011/??/??.
TMSX is ready in air [684] will finish 2011/??/??.
2021/03/29
Klog
EX
General
16383 Fixed that ACC and VEL of Picomotor Ch1 was different from other Ch2 to 4. , satoru.ikeda
16391 Supported for common Payload model files: Type-Bp(PR3) to PAYLOAD_MASTER , satoru.ikeda
16402 Change the name of EPICS channel in MASTERSWITCH , satoru.ikeda
16391 Supported for common Payload model files: Type-Bp(PR3) to PAYLOAD_MASTER , satoru.ikeda
16401 Comment , satoru.ikeda
IX
16421 Height adjustment of ITMX , ryutaro.takahashi
16428 Height measurement of ITMX , takafumi.ushiba
16365 Wiring the release sensor (outside the vacuum chamber) , naohisa.satou
16438 Comment , naohisa.satou
16421 Height adjustment of ITMX , ryutaro.takahashi
16431 Comment , ryutaro.takahashi
MCF
16405 Unable to connect Picomotor in MCO , satoru.ikeda
PR2
16406 Inspection of locating wire inner clamps , fabian.arellano
16416 Comment , fabian.arellano
16417 Tightening of the inner wire locating clamps. , fabian.arellano
PR3
This is generated by python script in /users/Miyo/dropbox/Script/scrapping/main.py.
Summary Report
TypeA
TypeB
Type-Bp PR2
This week we inspected and tightened the wires clapms in PR2. We followed the same procedure as in PR3, so I won't write any details here.
- We removed the IRM side panels and measure the gaps in different places using thickness gauges:
- Largest gap: 220 um close the wire, but smaller exactly where the wire is.
- Smallest gap: (50 , 60 ) um.
- We tightened the clamps according to the specification: 10 Nm for the weight holding ones and 2 Nm for the locating ones.
- 10 out of 12 screws rotated by small amounts when tightened, however,
- The two screws of the locating clamp at the +Y side were completely loose.
- After we re-assembled and released the payload we realized it had a lot of negative pitch (I wrote positive in the klog, sorry) and at least one OSEM flag was touching.
- We corrected the pitch with the picomotor.
- We also moved the BF keystone close to nominal position with the fishing rod.
- Then we corrected IM yaw.
- We found picomotor cables and stepper motor cables disconnected, so we connected them.
- By the end of today's work the IM seemed to be hanging free.
- We tried to measure TFs, but it seems the actuation is not going through because of a problem in the real-time model. Miyo-kun and Ikeda-san will take a look.
TypeC
- Before pumping down the IMC area, we have to write acceptance document for review. This document will be organized by Akutsu-san with some VIS people (Miyo, Takahashi)
Electronics
Control
Safety
Discussion
Travel Plans
The week from 4/12
- Takahashi: 4/12-16
- Sato: 4/12-16
- Hirata: 4/12-16
The week from 4/19
- Takahashi: 4/19-23
- Sato: 4/19-23
- Hirata: 4/19-23
Next meeting
- 2021/4/16(FRI)