Size: 3803
Comment:
|
Size: 6302
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 10: | Line 10: |
Participants : | Participants : |
Line 38: | Line 38: |
Participants: | Participants: |
Line 63: | Line 63: |
Line 65: | Line 66: |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16382|16382]] Comment , __ryutaro.takahashi__ | * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16382|16382]] Comment , __ryutaro.takahashi__ |
Line 69: | Line 71: |
* (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16402|16402]] Change the name of EPICS channel in MASTERSWITCH , __satoru.ikeda__ | * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16402|16402]] Change the name of EPICS channel in MASTERSWITCH , __satoru.ikeda__ |
Line 71: | Line 73: |
* (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16401|16401]] Comment , __satoru.ikeda__ | * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16401|16401]] Comment , __satoru.ikeda__ '''IX''' * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16421|16421]] Height adjustment of ITMX , __ryutaro.takahashi__ * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16428|16428]] Height measurement of ITMX , __takafumi.ushiba__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16365|16365]] Wiring the release sensor (outside the vacuum chamber) , __naohisa.satou__ * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16438|16438]] Comment , __naohisa.satou__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16421|16421]] Height adjustment of ITMX , __ryutaro.takahashi__ * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16431|16431]] Comment , __ryutaro.takahashi__ |
Line 73: | Line 84: |
* (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16405|16405]] Unable to connect Picomotor in MCO , __satoru.ikeda__ | * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16405|16405]] Unable to connect Picomotor in MCO , __satoru.ikeda__ |
Line 75: | Line 87: |
* (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16406|16406]] Inspection of locating wire inner clamps , __fabian.arellano__ | * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16406|16406]] Inspection of locating wire inner clamps , __fabian.arellano__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16416|16416]] Comment , __fabian.arellano__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16417|16417]] Tightening of the inner wire locating clamps. , __fabian.arellano__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16418|16418]] Comment , __tomotada.akutsu__ * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16427|16427]] Comment , __fabian.arellano__ '''PR3''' * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16422|16422]] Install the OpLev box on the PR3 pylon , __kouseki.miyo__ |
Line 78: | Line 97: |
Line 82: | Line 102: |
=== TypeBp === | === Type-Bp PR2 === This week we inspected and tightened the wires clapms in PR2. We followed the same procedure as in PR3, so I won't write any details here. * We removed the IRM side panels and measure the gaps in different places using thickness gauges: * Largest gap: 220 um close the wire, but smaller exactly where the wire is. * Smallest gap: (50 , 60 ) um. * We tightened the clamps according to the specification: 10 Nm for the weight holding ones and 2 Nm for the locating ones. * 10 out of 12 screws rotated by small amounts when tightened, however, * The two screws of the locating clamp at the +Y side were completely loose. * After we re-assembled and released the payload we realized it had a lot of negative pitch (I wrote positive in the klog, sorry) and at least one OSEM flag was touching. * We corrected the pitch with the picomotor. * We also moved the BF keystone close to nominal position with the fishing rod. * Then we corrected IM yaw. * We found picomotor cables and stepper motor cables disconnected, so we connected them. * By the end of today's work the IM seemed to be hanging free. * We tried to measure TFs, but it seems the actuation is not going through because of a problem in the real-time model. Miyo-kun and Ikeda-san will take a look. |
Contents
Agenda/Minutes
CRY+VIS Interface Meeting
Date : 13:30-
Participants :
Schedule
- IX: Oplev will be finalized in April. Height and alignment adjustments are on going. ACC will be installed in April.
- Investigation of the behavior of BF.
- Wide range FR for the F0.
- Adjustment of the height of pre-isolator using the piston.
- IY: Remedy of the pre-isolator is scheduled in April.
- EX: Oplev setting is on going.
- EY: Installation of the tower will be restarted in May. Removing of the maraging rod is necessary.
Status
- Corrugate tube fixing jig: They will be prepared by the end of May.
- Commissioning in air: From mid. May for IX.
- Commissioning in vacuum:
- Acceptance check: Check items for in-air commissioning should be confirmed on the payload.
- PF actuator: After the commissioning for suspension.
- Jig for FC painting:
- Overall commissioning:
- Procedure of TM height setting: Prepare for the measurement in the first in-vacuum commissioning in IX.
Discussion
VIS Meeting
14:30-
Participants:
Schedule
See Schedule
- Type-A team: IXV 4/13-16
- Type-B team: PR2 4/13-16
Milestone
IMC suspensions are ready in air [40] will finish 2011/04/21.
PRs are ready in air [643] will finish 2011/07/09.
ETMX is ready in air [656] will finish 2021/08/25.
ITMX is ready in air [657] will finish 2021/08/31.
ETMY is ready in air [658] will finish 2021/09/16.
ITMY is ready in air [659] will finish 2021/11/08.
BS is ready in air [691] will finish 2011/11/24.
SRs are ready in air [663] will finish 2011/12/20.
Output suspensions are ready in air [695] will finish 2011/12/21.
TMSY is ready in air [708] will finish 2011/??/??.
TMSX is ready in air [684] will finish 2011/??/??.
2021/03/29
Klog
EX
General
16383 Fixed that ACC and VEL of Picomotor Ch1 was different from other Ch2 to 4. , satoru.ikeda
16391 Supported for common Payload model files: Type-Bp(PR3) to PAYLOAD_MASTER , satoru.ikeda
16402 Change the name of EPICS channel in MASTERSWITCH , satoru.ikeda
16391 Supported for common Payload model files: Type-Bp(PR3) to PAYLOAD_MASTER , satoru.ikeda
16401 Comment , satoru.ikeda
IX
16421 Height adjustment of ITMX , ryutaro.takahashi
16428 Height measurement of ITMX , takafumi.ushiba
16365 Wiring the release sensor (outside the vacuum chamber) , naohisa.satou
16438 Comment , naohisa.satou
16421 Height adjustment of ITMX , ryutaro.takahashi
16431 Comment , ryutaro.takahashi
MCF
16405 Unable to connect Picomotor in MCO , satoru.ikeda
PR2
16406 Inspection of locating wire inner clamps , fabian.arellano
16416 Comment , fabian.arellano
16417 Tightening of the inner wire locating clamps. , fabian.arellano
PR3
This is generated by python script in /users/Miyo/dropbox/Script/scrapping/main.py.
Summary Report
TypeA
TypeB
Type-Bp PR2
This week we inspected and tightened the wires clapms in PR2. We followed the same procedure as in PR3, so I won't write any details here.
- We removed the IRM side panels and measure the gaps in different places using thickness gauges:
- Largest gap: 220 um close the wire, but smaller exactly where the wire is.
- Smallest gap: (50 , 60 ) um.
- We tightened the clamps according to the specification: 10 Nm for the weight holding ones and 2 Nm for the locating ones.
- 10 out of 12 screws rotated by small amounts when tightened, however,
- The two screws of the locating clamp at the +Y side were completely loose.
- After we re-assembled and released the payload we realized it had a lot of negative pitch (I wrote positive in the klog, sorry) and at least one OSEM flag was touching.
- We corrected the pitch with the picomotor.
- We also moved the BF keystone close to nominal position with the fishing rod.
- Then we corrected IM yaw.
- We found picomotor cables and stepper motor cables disconnected, so we connected them.
- By the end of today's work the IM seemed to be hanging free.
- We tried to measure TFs, but it seems the actuation is not going through because of a problem in the real-time model. Miyo-kun and Ikeda-san will take a look.
TypeC
Electronics
Control
Safety
Discussion
Travel Plans
The week from 4/12
- Takahashi: 4/12-16
- Sato: 4/12-16
- Hirata: 4/12-16
The week from 4/19
- Takahashi: 4/19-23
- Sato: 4/19-23
- Hirata: 4/19-23
Next meeting
- 2021/4/16(FRI)