Line 16: Line 16:
  * Investigation of the behavior of BF.
  * Wide range FR for the F0.
  * Adjustment of the height of pre-isolator using the piston.
 * IY: Remedy of the pre-isolator is scheduled in April.
 * EX: Oplev setting is on going.
  * Height adjustment ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16487|summary]]).
 * IY: Remedy of the pre-isolator will be postponed.
 * EX: Height and alignment adjustments are scheduled in 4/20-23.
Line 43: Line 41:
 * Type-A team: IXV 4/13-16
 * Type-B team: PR2 4/13-16
 * Type-A team: EXV 4/20-23
 * Type-B team: Remain work on Type-B/Bp.
Line 63: Line 61:
'''BS'''
 * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16447|16447]] Support for common Tower/Payload model files:: Type-B(BS) supports TOWER_M
ASTER and PAYLOAD_MASTER. , __satoru.ikeda__
'''General'''
 * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16446|16446]] Model files have been modified. , __satoru.ikeda__
 * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16445|16445]] Buoyancy effect in PR suspensions. , __fabian.arellano__
'''BS'''
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16447|16447]] Support for common Tower/Payload model files: Type-B(BS) supports TOWER_MASTER and PAYLOAD_MASTER. , __satoru.ikeda__
'''General'''
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16446|16446]] Model files have been modified. , __satoru.ikeda__
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16445|16445]] Buoyancy effect in PR suspensions. , __fabian.arellano__
 * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16465|16465]] Laser level deviation from the horizontal. , __fabian.arellano__
 * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16465|16465]] Laser level deviation from the horizontal. , __fabian.arellano__
  * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16466|16466]] Comment , __tomotada.akutsu__
'''IX'''
 * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16468|16468]] Tuning of LVDT type accelerometer for ITMX , __kouseki.miyo__
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16365|16365]] Wiring the release sensor (outside the vacuum chamber) , __naohisa.satou__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16438|16438]] Comment , __naohisa.satou__
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16421|16421]] Height adjustment of ITMX , __ryutaro.takahashi__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16458|16458]] Comment , __ryutaro.takahashi__
  * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16472|16472]] Comment , __ryutaro.takahashi__
'''MCF'''
 * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16463|16463]] Taking picture of MCo coils , __takaaki.yokozawa__
'''PR2'''
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16417|16417]] Tightening of the inner wire locating clamps. , __fabian.arellano__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16440|16440]] Comment , __fabian.arellano__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16444|16444]] Comment , __fabian.arellano__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16460|16460]] Comment , __fabian.arellano__
  * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16469|16469]] Comment , __fabian.arellano__
Line 70: Line 85:
'''IX'''
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16365|16365]] Wiring the release sensor (outside the vacuum chamber) , __naohisa.satou__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16438|16438]] Comment , __naohisa.satou__

'''PR2'''
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16417|16417]] Tightening of the inner wire locating clamps. , __fabian.arellano__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16440|16440]] Comment , __fabian.arellano__
  * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16444|16444]] Comment , __fabian.arellano__
                                                                                                                                                                                                                                                                                
This is generated by python script in /users/Miyo/dropbox/Script/scrapping/main.py.
(miyoconda37) controls@k1ctr1:/users/Miyo/dropbox/Scripts/scraping$
This is generated by python script in /users/Miyo/dropbox/Script/scrapping/main.py.
Line 86: Line 91:
=== Type-Bp PR2 ===
This week we inspected and tightened the wires clapms in PR2. We followed the same procedure as in PR3, so I won't write any details here.

 * We removed the IRM side panels and measure the gaps in different places using thickness gauges:
  * Largest gap: 220 um close the wire, but smaller exactly where the wire is.
  * Smallest gap: (50 , 60 ) um.
 * We tightened the clamps according to the specification: 10 Nm for the weight holding ones and 2 Nm for the locating ones.
  * 10 out of 12 screws rotated by small amounts when tightened, however,
  * The two screws of the locating clamp at the +Y side were completely loose.
 * After we re-assembled and released the payload we realized it had a lot of negative pitch (I wrote positive in the klog, sorry) and at least one OSEM flag was touching.
  * We corrected the pitch with the picomotor.
  * We also moved the BF keystone close to nominal position with the fishing rod.
  * Then we corrected IM yaw.
 * We found picomotor cables and stepper motor cables disconnected, so we connected them.
 * By the end of today's work the IM seemed to be hanging free.
 * We tried to measure TFs, but it seems the actuation is not going through because of a problem in the real-time model. Miyo-kun and Ikeda-san will take a look.
=== Type-Bp ===
Line 104: Line 93:

 * Before pumping down the IMC area, we have to write acceptance document for review. This document will be organized by Akutsu-san with some VIS people (Miyo, Takahashi)
 *
Line 113: Line 98:
The week from 4/12

 * Takahashi: 4/12-16
 * Sato: 4/12-16
 * Hirata: 4/12-16
Line 125: Line 104:
The week from 4/26

 * Takahashi: 4/26-28
 * Sato: 4/26-5/1
 * Hirata: 4/26-28
Line 126: Line 111:
 * 2021/4/16(FRI)  * 2021/4/23(FRI)

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date : 13:30-

Participants :

Post O3 Upgrade portal

Schedule

  • IX: Oplev will be finalized in April. Height and alignment adjustments are on going. ACC will be installed in April.
  • IY: Remedy of the pre-isolator will be postponed.
  • EX: Height and alignment adjustments are scheduled in 4/20-23.
  • EY: Installation of the tower will be restarted in May. Removing of the maraging rod is necessary.

Status

  • Corrugate tube fixing jig: They will be prepared by the end of May.
  • Commissioning in air: From mid. May for IX.
  • Commissioning in vacuum:
  • Acceptance check: Check items for in-air commissioning should be confirmed on the payload.
  • PF actuator: After the commissioning for suspension.
  • Jig for FC painting:
  • Overall commissioning:
  • Procedure of TM height setting: Prepare for the measurement in the first in-vacuum commissioning in IX.

Discussion


VIS Meeting

14:30-

Participants:

Schedule

See Schedule

  • Type-A team: EXV 4/20-23
  • Type-B team: Remain work on Type-B/Bp.

Milestone

  • IMC suspensions are ready in air [40] will finish 2011/04/21.

  • PRs are ready in air [643] will finish 2011/07/09.

  • ETMX is ready in air [656] will finish 2021/08/25.

  • ITMX is ready in air [657] will finish 2021/08/31.

  • ETMY is ready in air [658] will finish 2021/09/16.

  • ITMY is ready in air [659] will finish 2021/11/08.

  • BS is ready in air [691] will finish 2011/11/24.

  • SRs are ready in air [663] will finish 2011/12/20.

  • Output suspensions are ready in air [695] will finish 2011/12/21.

  • TMSY is ready in air [708] will finish 2011/??/??.

  • TMSX is ready in air [684] will finish 2011/??/??.

2021/03/29 updated

Klog

BS

  • 16447 Support for common Tower/Payload model files: Type-B(BS) supports TOWER_MASTER and PAYLOAD_MASTER. , satoru.ikeda

General

  • 16446 Model files have been modified. , satoru.ikeda

  • 16445 Buoyancy effect in PR suspensions. , fabian.arellano

  • (!) 16465 Laser level deviation from the horizontal. , fabian.arellano

  • (!) 16465 Laser level deviation from the horizontal. , fabian.arellano

    • (!) 16466 Comment , tomotada.akutsu

IX

  • (!) 16468 Tuning of LVDT type accelerometer for ITMX , kouseki.miyo

  • 16365 Wiring the release sensor (outside the vacuum chamber) , naohisa.satou

    • 16438 Comment , naohisa.satou

  • 16421 Height adjustment of ITMX , ryutaro.takahashi

    • 16458 Comment , ryutaro.takahashi

    • (!) 16472 Comment , ryutaro.takahashi

MCF

  • (!) 16463 Taking picture of MCo coils , takaaki.yokozawa

PR2

  • 16417 Tightening of the inner wire locating clamps. , fabian.arellano

    • 16440 Comment , fabian.arellano

    • 16444 Comment , fabian.arellano

    • 16460 Comment , fabian.arellano

    • (!) 16469 Comment , fabian.arellano

This is generated by python script in /users/Miyo/dropbox/Script/scrapping/main.py.

Summary Report

TypeA

TypeB

Type-Bp

TypeC

Electronics

Control

Safety

Discussion

Travel Plans

The week from 4/19

  • Takahashi: 4/19-23
  • Sato: 4/19-23
  • Hirata: 4/19-23

The week from 4/26

  • Takahashi: 4/26-28
  • Sato: 4/26-5/1
  • Hirata: 4/26-28

Next meeting

  • 2021/4/23(FRI)