Differences between revisions 17 and 18
Revision 17 as of 2021-04-15 22:06:32
Size: 4709
Comment:
Revision 18 as of 2021-04-16 06:47:48
Size: 5079
Editor: KousekiMiyo
Comment:
Deletions are marked like this. Additions are marked like this.
Line 61: Line 61:
Line 62: Line 63:
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16447|16447]] Support for common Tower/Payload model files: Type-B(BS) supports TOWER_MASTER and PAYLOAD_MASTER. , __satoru.ikeda__  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16447|16447]] Support for common Tower/Payload model files Type-B(BS) supports TOWER_MASTER and PAYLOAD_MASTER. , __satoru.ikeda__
Line 66: Line 67:
 * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16465|16465]] Laser level deviation from the horizontal. , __fabian.arellano__
 * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16465|16465]] Laser level deviation from the horizontal. , __fabian.arellano__
  * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16466|16466]] Comment , __tomotada.akutsu__
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16465|16465]] Laser level deviation from the horizontal. ,  __fabian.arellano__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16466|16466]] Comment , __tomotada.akutsu__
Line 70: Line 70:
 * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16468|16468]] Tuning of LVDT type accelerometer for ITMX , __kouseki.miyo__  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16468|16468]] Tuning of LVDT type accelerometer for ITMX ,  __kouseki.miyo__
Line 75: Line 75:
  * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16472|16472]] Comment , __ryutaro.takahashi__   * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16472|16472]] Comment , __ryutaro.takahashi__
  * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16480|16480]] Comment , __satoru.ikeda__
  * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16487|16487]] Comment , __ryutaro.takahashi__
Line 77: Line 79:
 * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16463|16463]] Taking picture of MCo coils , __takaaki.yokozawa__  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16463|16463]] Taking picture of MCo coils ,  __takaaki.yokozawa__
Line 83: Line 85:
  * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16469|16469]] Comment , __fabian.arellano__   * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16469|16469]] Comment , __fabian.arellano__
  * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16484|16484]] Comment , __fabian.arellano__
'''PR3'''
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16348|16348]] Tightening the locating clamps for the piano wire. , __fabian.arellano__
  * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16486|16486]] Comment , __fabian.arellano__

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date : 13:30-

Participants :

Post O3 Upgrade portal

Schedule

  • IX: Oplev will be finalized in April. Height and alignment adjustments are on going. ACC will be installed in April.
  • IY: Remedy of the pre-isolator will be postponed.
  • EX: Height and alignment adjustments are scheduled in 4/20-23.
  • EY: Installation of the tower will be restarted in May. Removing of the maraging rod is necessary.

Status

  • Corrugate tube fixing jig: They will be prepared by the end of May.
  • Commissioning in air: From mid. May for IX.
  • Commissioning in vacuum:
  • Acceptance check: Check items for in-air commissioning should be confirmed on the payload.
  • PF actuator: After the commissioning for suspension.
  • Jig for FC painting:
  • Overall commissioning:
  • Procedure of TM height setting: Prepare for the measurement in the first in-vacuum commissioning in IX.

Discussion


VIS Meeting

14:30-

Participants:

Schedule

See Schedule

  • Type-A team: EXV 4/20-23
  • Type-B team: Remain work on Type-B/Bp.

Milestone

  • IMC suspensions are ready in air [40] will finish 2011/04/21.

  • PRs are ready in air [643] will finish 2011/07/09.

  • ETMX is ready in air [656] will finish 2021/08/25.

  • ITMX is ready in air [657] will finish 2021/08/31.

  • ETMY is ready in air [658] will finish 2021/09/16.

  • ITMY is ready in air [659] will finish 2021/11/08.

  • BS is ready in air [691] will finish 2011/11/24.

  • SRs are ready in air [663] will finish 2011/12/20.

  • Output suspensions are ready in air [695] will finish 2011/12/21.

  • TMSY is ready in air [708] will finish 2011/??/??.

  • TMSX is ready in air [684] will finish 2011/??/??.

2021/03/29 updated

Klog

BS

  • 16447 Support for common Tower/Payload model files Type-B(BS) supports TOWER_MASTER and PAYLOAD_MASTER. , satoru.ikeda

General

  • 16446 Model files have been modified. , satoru.ikeda

  • 16445 Buoyancy effect in PR suspensions. , fabian.arellano

  • 16465 Laser level deviation from the horizontal. , fabian.arellano

    • 16466 Comment , tomotada.akutsu

IX

  • 16468 Tuning of LVDT type accelerometer for ITMX , kouseki.miyo

  • 16365 Wiring the release sensor (outside the vacuum chamber) , naohisa.satou

    • 16438 Comment , naohisa.satou

  • 16421 Height adjustment of ITMX , ryutaro.takahashi

    • 16458 Comment , ryutaro.takahashi

    • 16472 Comment , ryutaro.takahashi

    • (!) 16480 Comment , satoru.ikeda

    • (!) 16487 Comment , ryutaro.takahashi

MCF

  • 16463 Taking picture of MCo coils , takaaki.yokozawa

PR2

  • 16417 Tightening of the inner wire locating clamps. , fabian.arellano

    • 16440 Comment , fabian.arellano

    • 16444 Comment , fabian.arellano

    • 16460 Comment , fabian.arellano

    • 16469 Comment , fabian.arellano

    • (!) 16484 Comment , fabian.arellano

PR3

  • 16348 Tightening the locating clamps for the piano wire. , fabian.arellano

    • (!) 16486 Comment , fabian.arellano

This is generated by python script in /users/Miyo/dropbox/Script/scrapping/main.py.

Summary Report

TypeA

TypeB

Type-Bp

TypeC

Electronics

Control

Safety

Discussion

Travel Plans

The week from 4/19

  • Takahashi: 4/19-23
  • Sato: 4/19-23
  • Hirata: 4/19-23

The week from 4/26

  • Takahashi: 4/26-28
  • Sato: 4/26-5/1
  • Hirata: 4/26-28

Next meeting

  • 2021/4/23(FRI)