Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date : 13:30-

Participants :

Post O3 Upgrade portal

Schedule

  • IX: Oplev will be finalized in April. Height and alignment adjustments are on going. ACC will be installed in April.
  • IY: Remedy of the pre-isolator will be postponed.
  • EX: Height and alignment adjustments are scheduled in 4/20-23.
  • EY: Installation of the tower will be restarted in May. Removing of the maraging rod is necessary.

Status

  • Corrugate tube fixing jig: They will be prepared by the end of May.
  • Commissioning in air: From mid. May for IX.
  • Commissioning in vacuum:
  • Acceptance check: Check items for in-air commissioning should be confirmed on the payload.
  • PF actuator: After the commissioning for suspension.
  • Jig for FC painting:
  • Overall commissioning:
  • Procedure of TM height setting: Prepare for the measurement in the first in-vacuum commissioning in IX.

Discussion


VIS Meeting

14:30-

Participants:

Schedule

See Schedule

  • Type-A team: EXV 4/20-23
  • Type-B team: Remain work on Type-B/Bp.

Milestone

  • IMC suspensions are ready in air [40] will finish 2011/04/21.

  • PRs are ready in air [643] will finish 2011/07/09.

  • ETMX is ready in air [656] will finish 2021/08/25.

  • ITMX is ready in air [657] will finish 2021/08/31.

  • ETMY is ready in air [658] will finish 2021/09/16.

  • ITMY is ready in air [659] will finish 2021/11/08.

  • BS is ready in air [691] will finish 2011/11/24.

  • SRs are ready in air [663] will finish 2011/12/20.

  • Output suspensions are ready in air [695] will finish 2011/12/21.

  • TMSY is ready in air [708] will finish 2011/??/??.

  • TMSX is ready in air [684] will finish 2011/??/??.

2021/03/29 updated

Klog

BS

  • 16447 Support for common Tower/Payload model files Type-B(BS) supports TOWER_MASTER and PAYLOAD_MASTER. , satoru.ikeda

General

  • 16446 Model files have been modified. , satoru.ikeda

  • 16445 Buoyancy effect in PR suspensions. , fabian.arellano

  • 16465 Laser level deviation from the horizontal. , fabian.arellano

    • 16466 Comment , tomotada.akutsu

IX

  • 16468 Tuning of LVDT type accelerometer for ITMX , kouseki.miyo

  • 16365 Wiring the release sensor (outside the vacuum chamber) , naohisa.satou

    • 16438 Comment , naohisa.satou

  • 16421 Height adjustment of ITMX , ryutaro.takahashi

    • 16458 Comment , ryutaro.takahashi

    • 16472 Comment , ryutaro.takahashi

    • (!) 16480 Comment , satoru.ikeda

    • (!) 16487 Comment , ryutaro.takahashi

MCF

  • 16463 Taking picture of MCo coils , takaaki.yokozawa

PR2

  • 16417 Tightening of the inner wire locating clamps. , fabian.arellano

    • 16440 Comment , fabian.arellano

    • 16444 Comment , fabian.arellano

    • 16460 Comment , fabian.arellano

    • 16469 Comment , fabian.arellano

    • (!) 16484 Comment , fabian.arellano

PR3

  • 16348 Tightening the locating clamps for the piano wire. , fabian.arellano

    • (!) 16486 Comment , fabian.arellano

This is generated by python script in /users/Miyo/dropbox/Script/scrapping/main.py.

Summary Report

TypeA

TypeB

Type-Bp

TypeC

Electronics

Control

Safety

Discussion

Suspension commissioning details and plans? [Terrence]

  • Has it been discussed? To me, it is still very unclear how it should be done and what people expect. If it has been discussed before, it seems to me it is not transparent.
  • I would like to call for a meeting. In the meeting, we should discuss how should SC be done, including but not limited to topics like:
    • The scope of the suspension commissioning.
    • What are some deliverables?
    • How should tasks be done? (E.g. Sensor alignment, noise estimation, etc..)
    • What methods should we use? (I propose to use a benchmark so we accept multiple methods, for now.)
    • What are some evaluations that should be done? (E.g. We should make a report for each suspension about what has been done and what are some objective quantities that we measured to confirm the performance of the suspensions)
    • How to interface with interferometer commissioning? (We shouldn't think of suspension commissioning as something that can be done once and for all. Instead, we need to get input from the interferometer and recursively update our strategies.)
    • Someone should roughly plan out the timeline (at least from start to finish).
  • I will be drafting a document, which I hope to serve as a handbook/rules for suspension commissioning so everything is clear to everyone.
  • Which mailing list should I use, to organize the meetings? gokagra?

Travel Plans

The week from 4/19

  • Takahashi: 4/19-23
  • Sato: 4/19-23
  • Hirata: 4/19-23

The week from 4/26

  • Takahashi: 4/26-28
  • Sato: 4/26-5/1
  • Hirata: 4/26-28

Next meeting

  • 2021/4/23(FRI)