Contents
Agenda/Minutes
CRY+VIS Interface Meeting
Date : 13:30-
Participants :
Schedule
- IX: Oplev will be finalized in April. Height and alignment adjustments are on going. ACC will be installed in April.
Height adjustment (summary).
- IY: Remedy of the pre-isolator will be postponed.
- EX: Height and alignment adjustments are scheduled in 4/20-23.
- EY: Installation of the tower will be restarted in May. Removing of the maraging rod is necessary.
Status
- Corrugate tube fixing jig: They will be prepared by the end of May.
- Commissioning in air: From mid. May for IX.
- Commissioning in vacuum:
- Acceptance check: Check items for in-air commissioning should be confirmed on the payload.
- PF actuator: After the commissioning for suspension.
- Jig for FC painting:
- Overall commissioning:
- Procedure of TM height setting: Prepare for the measurement in the first in-vacuum commissioning in IX.
Discussion
VIS Meeting
14:30-
Participants:
Schedule
See Schedule
- Type-A team: EXV 4/20-23
- Type-B team: Remain work on Type-B/Bp.
Milestone
IMC suspensions are ready in air [40] will finish 2011/04/21.
PRs are ready in air [643] will finish 2011/07/09.
ETMX is ready in air [656] will finish 2021/08/25.
ITMX is ready in air [657] will finish 2021/08/31.
ETMY is ready in air [658] will finish 2021/09/16.
ITMY is ready in air [659] will finish 2021/11/08.
BS is ready in air [691] will finish 2011/11/24.
SRs are ready in air [663] will finish 2011/12/20.
Output suspensions are ready in air [695] will finish 2011/12/21.
TMSY is ready in air [708] will finish 2011/??/??.
TMSX is ready in air [684] will finish 2011/??/??.
2021/03/29 updated
Klog
BS
16447 Support for common Tower/Payload model files Type-B(BS) supports TOWER_MASTER and PAYLOAD_MASTER. , satoru.ikeda
General
16446 Model files have been modified. , satoru.ikeda
16445 Buoyancy effect in PR suspensions. , fabian.arellano
16465 Laser level deviation from the horizontal. , fabian.arellano
16466 Comment , tomotada.akutsu
IX
16468 Tuning of LVDT type accelerometer for ITMX , kouseki.miyo
16365 Wiring the release sensor (outside the vacuum chamber) , naohisa.satou
16438 Comment , naohisa.satou
16421 Height adjustment of ITMX , ryutaro.takahashi
MCF
16463 Taking picture of MCo coils , takaaki.yokozawa
PR2
16417 Tightening of the inner wire locating clamps. , fabian.arellano
PR3
16348 Tightening the locating clamps for the piano wire. , fabian.arellano
16486 Comment , fabian.arellano
This is generated by python script in /users/Miyo/dropbox/Script/scrapping/main.py.
Summary Report
TypeA
TypeB
Type-Bp
TypeC
Electronics
Control
Safety
Discussion
Suspension commissioning details and plans? [Terrence]
- Has it been discussed? To me, it is still very unclear how it should be done and what people expect. If it has been discussed before, it seems to me it is not transparent.
- I would like to call for a meeting. In the meeting, we should discuss how should SC be done, including but not limited to topics like:
- The scope of the suspension commissioning.
- What are some deliverables?
- How should tasks be done? (E.g. Sensor alignment, noise estimation, etc..)
- What methods should we use? (I propose to use a benchmark so we accept multiple methods, for now.)
- What are some evaluations that should be done? (E.g. We should make a report for each suspension about what has been done and what are some objective quantities that we measured to confirm the performance of the suspensions)
- How to interface with interferometer commissioning? (We shouldn't think of suspension commissioning as something that can be done once and for all. Instead, we need to get input from the interferometer and recursively update our strategies.)
- Someone should roughly plan out the timeline (at least from start to finish).
- I will be drafting a document, which I hope to serve as a handbook/rules for suspension commissioning so everything is clear to everyone.
- Which mailing list should I use, to organize the meetings? gokagra?
Travel Plans
The week from 4/19
- Takahashi: 4/19-23
- Sato: 4/19-23
- Hirata: 4/19-23
The week from 4/26
- Takahashi: 4/26-28
- Sato: 4/26-5/1
- Hirata: 4/26-28
Next meeting
- 2021/4/23(FRI)