* [Terrence] Just a reminder of the existence of [[https://github.com/gw-vis/vis-commissioning-tex | this suspension commissioning document]] * This is a compilation of various knowledge and techniques related to suspensions (mostly software). * I hope this document can help the upcoming suspension commissioning and, more importantly, for longevity as people left KAGRA along with their methods. * I have compiled a comprehensive list of suspension commissioning tasks to be done. (These tasks are foreseen to be recurring in the future.) * The list consists of ordered tasks focusing on satisfying residual motion and displacement noise requirements. * I am still writing the method sections, which consist of methods on how to complete the tasks. * I have also been programming these techniques as I write them, so implementation will be readily available. [[https://kontrol.readthedocs.io/en/latest/tutorial.html | Kontrol tutorials]] are available here. * I will be working on this. I hope to finish this in one-two weeks. I will be updating the progress. * Please have a sneak peek and tell me if you any comments or questions, or if you think that there are some other important things to be added in the document. |
Contents
Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2021/5/21 13:00-
Participants:
Schedule
- IX: Yaw FR was adjusted and the chamber was closed on 5/17-18.
- IY: Acceptance review is scheduled on 5/21. Remedy of the pre-isolator is postponed.
- EX: Parts to modify the addtional FR will be delivered on 5/24.
- EY: Installation of the tower is on going. Items (pure water maker, etc.) for the mirror cleaning are under preparation.
Status
- Corrugate tube fixing jig: Other 3 sets will be ready by the end of June.
- TM height setting: Height standard around the cross tube was made in IX/IY.
- Commissioning in air: Started on the pre-isolator in IX.
- Commissioning in vacuum:
- Overall commissioning:
- Acceptance check: Group work is set every Friday to make the acceptance check document.
- PF actuator: After SC.
- Jig for FC painting: Tested in this week.
Discussion
VIS Meeting
14:00-
Participants:
Schedule
See Schedule
- Type-A team: IXV 5/24, EXV 2/25, EYV 5/24-28
- Type-B team:
Milestone
IMC suspensions are ready in air [40] will finish 2011/04/21.
PRs are ready in air [643] will finish 2011/07/09.
ETMX is ready in air [656] will finish 2021/08/25.
ITMX is ready in air [657] will finish 2021/08/31.
ETMY is ready in air [658] will finish 2021/09/16.
ITMY is ready in air [659] will finish 2021/11/08.
BS is ready in air [691] will finish 2011/11/24.
SRs are ready in air [663] will finish 2011/12/20.
Output suspensions are ready in air [695] will finish 2011/12/21.
TMSY is ready in air [708] will finish 2011/??/??.
TMSX is ready in air [684] will finish 2011/??/??.
2021/03/29 updated
Klog
EX
16535 Height adjustment of ETMX , ryutaro.takahashi
General
16506 Deleted unnecessary processes from VIS model file. , satoru.ikeda
IX
16421 Height adjustment of ITMX , ryutaro.takahashi
MCE
16512 MCe oplev characterization , takaaki.yokozawa
MCF
16498 Type-C simulation model , yoichi.aso
16501 Oplev calibration MCo , takaaki.yokozawa
16500 Characterization of optical lever MCi , takaaki.yokozawa
16537 MCo suspension strange , tomotada.akutsu
16157 Investigation of IMC suspensions , ryutaro.takahashi
16513 Comment , kouseki.miyo
PR3
16520 Thermistor installation , fabian.arellano
16521 Setting the mirror to nominal height , fabian.arellano
16348 Tightening the locating clamps for the piano wire. , fabian.arellano
16502 Comment , fabian.arellano
16520 Thermistor installation , fabian.arellano
16533 Comment , fabian.arellano
16521 Setting the mirror to nominal height , fabian.arellano
PRM
SR2
16509 Lowering the pre-isolator , fabian.arellano
This is generated by python script in /users/Miyo/dropbox/Script/scrapping/main.py.
Summary Report
TypeA
TypeB
Type-Bp
TypeC
Electronics
Control
Safety
Discussion
[Terrence] Just a reminder of the existence of this suspension commissioning document
- This is a compilation of various knowledge and techniques related to suspensions (mostly software).
- I hope this document can help the upcoming suspension commissioning and, more importantly, for longevity as people left KAGRA along with their methods.
- I have compiled a comprehensive list of suspension commissioning tasks to be done. (These tasks are foreseen to be recurring in the future.)
- The list consists of ordered tasks focusing on satisfying residual motion and displacement noise requirements.
- I am still writing the method sections, which consist of methods on how to complete the tasks.
I have also been programming these techniques as I write them, so implementation will be readily available. Kontrol tutorials are available here.
- I will be working on this. I hope to finish this in one-two weeks. I will be updating the progress.
- Please have a sneak peek and tell me if you any comments or questions, or if you think that there are some other important things to be added in the document.
Travel Plans
The week from 5/24
- Takahashi: 5/24-28
- Sato: 5/24-28
- Hirata: 5/24-28
- Yano: 5/24-28
The week from 5/31
- Takahashi: 5/31-6/4
- Sato: 5/31-6/4
- Hirata: 5/31-6/4
- Yano: 5/31-6/4
Next meeting
- 2021/5/28(FRI)