Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2021/5/28 13:00-

Participants:

Post O3 Upgrade portal

Schedule

  • IX: Setup of Geophones/ACCs are on going.
  • IY: GAS blades of F0 were replaced. Installation of the cryo-payload is scheduled on 5/31-6/1.
  • EX: Additional FR was modified. Light source for Oplev has a problem.
  • EY: Installation of tower is in the pre-isolator stage. Mirror was taken out. Delivery of pure water generator is delayed.

Status

  • Corrugate tube fixing jig: Other 3 sets will be ready by the end of June.
  • TM height setting: Confirmed the height of EQ stop using the height standard near the cross tube in IX.
  • Commissioning in air: Started on the pre-isolator in IX.
  • Commissioning in vacuum:
  • Overall commissioning:
  • Acceptance check: Group work is set every Friday to make the acceptance check document.
  • PF actuator: After SC.
  • Jig for FC painting:

Discussion


VIS Meeting

14:00-

Participants:

Schedule

See Schedule

  • Type-A team: IYV 5/31, EYV 6/21-4
  • Type-B team: SR

Milestone

  • IMC suspensions are ready in air [40] will finish 2021/04/21.

  • PRs are ready in air [643] will finish 2021/07/09.

  • ETMX is ready in air [656] will finish 2021/08/25.

  • ITMX is ready in air [657] will finish 2021/08/31.

  • ETMY is ready in air [658] will finish 2021/09/16.

  • ITMY is ready in air [659] will finish 2021/11/08.

  • BS is ready in air [691] will finish 2021/11/24.

  • SRs are ready in air [663] will finish 2021/12/20.

  • Output suspensions are ready in air [695] will finish 2021/12/21.

  • TMSY is ready in air [708] will finish 2021/??/??.

  • TMSX is ready in air [684] will finish 2021/??/??.

2021/03/29 updated

Klog

EX

  • (!) 16535 Height adjustment of ETMX , ryutaro.takahashi

General

  • 16506 Deleted unnecessary processes from VIS model file. , satoru.ikeda

IX

  • 16421 Height adjustment of ITMX , ryutaro.takahashi

    • 16499 Comment , ryutaro.takahashi

    • 16519 Comment , ryutaro.takahashi

MCE

  • 16512 MCe oplev characterization , takaaki.yokozawa

    • 16525 Comment , takaaki.yokozawa

    • (!) 16522 Comment , tomotada.akutsu

MCF

  • 16498 Type-C simulation model , yoichi.aso

  • 16501 Oplev calibration MCo , takaaki.yokozawa

  • 16500 Characterization of optical lever MCi , takaaki.yokozawa

  • (!) 16537 MCo suspension strange , tomotada.akutsu

  • 16157 Investigation of IMC suspensions , ryutaro.takahashi

    • 16513 Comment , kouseki.miyo

PR3

  • 16520 Thermistor installation , fabian.arellano

  • 16521 Setting the mirror to nominal height , fabian.arellano

  • 16348 Tightening the locating clamps for the piano wire. , fabian.arellano

    • 16502 Comment , fabian.arellano

  • 16520 Thermistor installation , fabian.arellano

    • (!) 16533 Comment , fabian.arellano

  • 16521 Setting the mirror to nominal height , fabian.arellano

    • (!) 16532 Comment , shinji.miyoki

    • (!) 16529 Comment , fabian.arellano

PRM

  • 16518 PRM BF-LVDT replacement , yoichi.aso

    • (!) 16534 Comment , yoichi.aso

SR2

  • 16509 Lowering the pre-isolator , fabian.arellano

This is generated by python script in /users/Miyo/dropbox/Script/scrapping/main.py.

Summary Report

Type-A

Type-B

Type-Bp

TypeC

Electronics

Control

Safety

Discussion

Travel Plans

The week from 5/31

  • Takahashi: 5/31-6/4
  • Sato: 5/31-6/4
  • Hirata: 5/31-6/4
  • Yano: 5/31-6/4

The week from 6/7

  • Takahashi: 6/7-11
  • Sato: 6/7-11
  • Hirata: 6/7-11
  • Yano: 6/7-11

Next meeting

  • 2021/6/4(FRI)