Contents
Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2021/6/18 13:00-
Participants:
Schedule
- IX: H4 geophone was replaced. Top chamber was closed again.
- IY: Schedule: Rough alignment of TM?
- EX: Adjustment of Yaw FR and IP tuning was finished. Broken cable was recovered. Top chamber was closed.
- EY: Assembly of payload is on going. Status of mirror cleaning?
Status
- Corrugate tube fixing jig: Delivery and implement were scheduled on 7/12-13.
- TM height setting: Next target is ITMY.
- Commissioning in air: X-arm.
- Commissioning in vacuum:
- Overall commissioning:
- Acceptance check: Group work is set every Friday.
- PF actuator: After SC.
- Jig for FC painting:
- Separation of rack in 2F: On the maintenance days.
- Disassembly of PRM/PR2 assembly frame: This was scheduled on 6/28-29.
Discussion
VIS Meeting
14:00-
Participants:
Klog
This is generated by python script in /users/Miyo/dropbox/Script/scrapping/main.py.
Summary Report
Type-A
- Tuned the F0 in IY.
- Adjusted the yaw FR in EX. Tuned the IP. The H4 geophone was put on the IP. Repaired some in-vacuum cables.
- Closed the top chambers in IX and EX.
Type-B
- SRM [Terrence]
- Fabian locked the SRM IP so I can measure the LVDT sensor noises.
- I measured the geophone readouts as well when the IP is unlocked. The suspension is quiet enough so these can be used as sensor noise estimates. [notebook sneak peek]
- I then measured transfer functions and cross-transfer functions.
cross-coupling is confusing. Explain with figure: klog 17137
- I reverted the sensing matrix and the actuation matrix using Mark's old matrix, which is derived from geometry.
- Cross-coupling is still confusing between L and T. But at least I can decouple L2Y, T2Y, Y2L and Y2T.
- I suspect the lowest frequency modes are L-T coupled. I am pretty sure L and T sensors are not 100% coupled as suggested in the figures.
- I compared the L and T readout with seismic noise in the x-arm and y-arm direction and L has minimal coherence with x-arm while T has minimal coherence with y-arm.
- Peaks are too close :*(.
- Some opinion about the RT-model
- LVDTALIGN and ACCALIGN matrices are great for sensor diagonalization.
- Why don't add something like COILALIGN (for actuation)?
Type-Bp
Type-C
Electronics
Control
Schedule
See Schedule
- Type-A team: ACC preparation
- Type-B team: Remaining work
Milestone
IMC suspensions are ready in air [40] will finish 2021/04/21.
PRs are ready in air [643] will finish 2021/07/09.
ETMX is ready in air [656] will finish 2021/08/25.
ITMX is ready in air [657] will finish 2021/08/31.
ETMY is ready in air [658] will finish 2021/09/16.
ITMY is ready in air [659] will finish 2021/11/08.
BS is ready in air [691] will finish 2021/11/24.
SRs are ready in air [663] will finish 2021/12/20.
Output suspensions are ready in air [695] will finish 2021/12/21.
TMSY is ready in air [708] will finish 2021/??/??.
TMSX is ready in air [684] will finish 2021/??/??.
2021/03/29 updated
Safety
Discussion
Travel Plans
The week from 6/21
- Takahashi: 6/21-22
- Hirata: 6/21-22
- Yano: 6/21-25
The week from 6/28
- Takahashi: 6/28-7/2
- Sato: 6/28-7/2
- Hirata: 6/28-7/2
- Yano: 6/28-7/2
Next meeting
- 2021/6/25(FRI)