Line 8: Line 8:
Date: 2021/7/9 13:00-14:00 Date: 2021/7/16 13:00-
Line 10: Line 10:
Participants: Takahashi, Ikeda, Sato, Ushiba, Kimura, Aso, Tomaru, Node, Hirata Participants:
Line 15: Line 15:
 * IX: To the finalization.
 * EX: Alignment for the green beam was finished. To the finalization
 * IY: Height adjustment is on going.
 * EY: Mirror cleaning is on going in Mitaka. Measurement system had a problem. The shipping will be in the end of next week at earliest.
 * IX: Payload was recovered. To the finalization.
 * EX: Aligned for the green beam again. To the finalization
 * IY: F1 was recovered. Adjustable range of F0 was extended ([[https://www.dropbox.com/s/a8p7m6luxz6ndwn/Height%20range%20rev.pdf?dl=0|Height range]]). To the height adjustment.
 * EY: Mirror cleaning is on going. The shipping will be in the next week (transported after holidays).
Line 21: Line 21:
 * Corrugate tube fixing jig: Implementation is scheduled on 7/12-13.  * Corrugate tube fixing jig: Replaced on 7/12-13.
Line 29: Line 29:
 * New vacuum pumps for V-chambers: Considering the port location.
 * Extension of cables
for picomotor drivers: Tested in EYV.
 * New vacuum pumps for V-chambers: Problem on the support for GVs.
Line 33: Line 32:
Adjustable height range of the filter chain in IY
 * [[https://www.dropbox.com/s/i7e0grqv324sdfz/Height%20range.pdf?dl=0|Present height range]]
 * The condition of F1 stepper motor is the same as the F3 in IX. We tried to move the motor with the stand alone driver, but the FR is still not working.
  * The motor is still not working?
  * The FR slider is stuck?
 * The range of BF is too small. Check the mechanical stopper.
 * Tune the F0 more to lower frequency (now 0.4Hz) in order to extend the range.
Line 41: Line 33:
== Next meeting ==
 * 2021/7/16(FRI)
----------
= VIS Meeting =
14:00-

Participants:
Line 45: Line 40:
'''EX'''
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17376|17376]] ETMX IM dewhitening filters and comb60 filters are implemented , __takafumi.ushiba__
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17396|17396]] Oplev preparation at EXC , __takaaki.yokozawa__
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17450|17450]] Oplev calibration EX TM oplev , __takaaki.yokozawa__
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17496|17496]] ETMX IM photosensor trouble shooting , __takafumi.ushiba__
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17503|17503]] Rebooter installation for pico motor drivers. (ETMX) , __koji.nakagaki__
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17506|17506]] Replacement of fixing jigs for the corrugate tube , __ryutaro.takahashi__
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17267|17267]] Oplev preparation work EX , __takaaki.yokozawa__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17362|17362]] Comment , __takaaki.yokozawa__
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17358|17358]] Injection of OpLev lasers to the cryostat at EXC , __takafumi.ushiba__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17361|17361]] Comment , __takaaki.yokozawa__
'''EY'''
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17457|17457]] dial gauge installation, Pico motor cable extension test , __naohisa.satou__
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17485|17485]] Replacement of fixing jigs for the corrugate tube , __ryutaro.takahashi__
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17485|17485]] Replacement of fixing jigs for the corrugate tube , __ryutaro.takahashi__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17505|17505]] Comment , __ryutaro.takahashi__
'''General'''
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17369|17369]] Added EPICS channel for VIS temperature adjustment , __satoru.ikeda__
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17368|17368]] Implemented some Oplev-related fixes to the VIS model file. , __satoru.ikeda__
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17388|17388]] Implementation of sensor to EULER matrix for IM photosensors , __takafumi.ushiba__
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17455|17455]] TypeA,B,Bp VIS Guardian changed to SAFE , __satoru.ikeda__
 * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17513|17513]] Safe.snap of MCi,e,o are updated after Miyoki-san closed laser shutter. , __kouseki.miyo__
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17079|17079]] Organizing DAQ channels for VIS , __satoru.ikeda__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17460|17460]] Comment , __satoru.ikeda__
'''IX'''
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17400|17400]] Modification of damp_temp filter for MN DAMP filter of ITMX , __takafumi.ushiba__
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17405|17405]] IX Pico motor driver was broken and replaced. , __koji.nakagaki__
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17449|17449]] Oplev calibration IX TM oplevs , __takaaki.yokozawa__
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17468|17468]] MNH1 actuator of ITMX seems to have an issue. , __takafumi.ushiba__
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17482|17482]] Re-calibration of the IX TM length oplev , __takaaki.yokozawa__
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17481|17481]] ITMX MNH1 cable repairement , __takafumi.ushiba__
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17247|17247]] Rebooter installation for pico motor drivers. (ITMX) , __koji.nakagaki__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17502|17502]] Comment , __koji.nakagaki__
  * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17522|17522]] Comment , __koji.nakagaki__
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17335|17335]] Checked resistance of TF and BF LVDT actuators coil. , __naohisa.satou__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17367|17367]] Comment , __naohisa.satou__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17377|17377]] Comment , __ryutaro.takahashi__
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17405|17405]] IX Pico motor driver was broken and replaced. , __koji.nakagaki__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17420|17420]] Comment , __satoru.ikeda__
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17449|17449]] Oplev calibration IX TM oplevs , __takaaki.yokozawa__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17461|17461]] Comment , __takafumi.ushiba__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17469|17469]] Comment , __takafumi.ushiba__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17497|17497]] Comment , __kouseki.miyo__
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17468|17468]] MNH1 actuator of ITMX seems to have an issue. , __takafumi.ushiba__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17472|17472]] Comment , __takafumi.ushiba__
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17481|17481]] ITMX MNH1 cable repairement , __takafumi.ushiba__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17501|17501]] Comment , __takafumi.ushiba__
  * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17516|17516]] Comment , __takafumi.ushiba__
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17482|17482]] Re-calibration of the IX TM length oplev , __takaaki.yokozawa__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17488|17488]] Comment , __takafumi.ushiba__
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=8564|8564]] ITMX healthy check after pump down , __lucia.trozzo__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17366|17366]] Comment , __kouseki.miyo__
'''IY'''
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17406|17406]] Setup of pre-isolator , __ryutaro.takahashi__
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17484|17484]] Replacement of fixing jigs for the corrugate tube , __ryutaro.takahashi__
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17406|17406]] Setup of pre-isolator , __ryutaro.takahashi__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17431|17431]] Comment , __ryutaro.takahashi__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17441|17441]] Comment , __ryutaro.takahashi__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17498|17498]] Comment , __naohisa.satou__
  * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17526|17526]] Comment , __ryutaro.takahashi__
'''MCE'''
 * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17523|17523]] About the placement of the mini-rack in MCE , __koji.nakagaki__
'''PR2'''
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17478|17478]] Rotate PR2 mirror by IM_YAW picomotor but we had better to use traverser , __kouseki.miyo__
 * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17520|17520]] PR2 Traversor motor and PR2 IM PITCH drive Picomotor , __satoru.ikeda__
'''SR2'''
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17434|17434]] Cable connection check , __naoatsu.hirata__
'''SR3'''
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17439|17439]] Cable connection check , __naoatsu.hirata__
'''SRM'''
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17314|17314]] Optical lever installation , __fabian.arellano__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17372|17372]] Comment , __fabian.arellano__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17499|17499]] Comment , __terrence.tsang__
Line 49: Line 118:
 * Adjusted the ballasts on the cryo-payload and the BF in IY. Additional spring was implemented on the BF.
 * Repaired the broken cables for TF/BF actuator opening the chamber. The BF and TF were recovered and the chamber was closed.
 * IY: Recovered the F1, F2 FRs. Compressed the F0 blades more to extend the height range. Total adjustable range became +/- 10.6mm.
 * IX: Calibrated the BF damper. The LVDT driver was replaced to the low noise one.
 * The corrugate tube fixing jigs were replaced in IY, EY, and EX.
Line 60: Line 130:
 * Type-A team: Adjustment of IYV  * Type-A team: Height adjustment of IYV
Line 82: Line 152:
The week from 7/5 The week from 7/19
Line 84: Line 154:
 * Takahashi: 7/5-8 (KIW8 7/7-9)
 * Sato: 7/5-8
 * Hirata: 7/5-9
 * Yano: 7/5-9
 * Takahashi: 7/19-21
 * Sato: 7/19-21
 * Hirata: 7/19-21
 * Yano: 7/19-21
Line 89: Line 159:
The week from 7/12 The week from 7/26
Line 91: Line 161:
 * Takahashi: 7/12-16
 * Sato: 7/12-16

 * Hirata: 7/12-16
 * Yano: 7/12-16
 * Takahashi: 7/26-30
 * Hirata: 7/26-30
 * Yano: 7/26-30
Line 97: Line 166:
 * 2021/7/16(FRI)  * 2021/7/30(FRI)

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2021/7/16 13:00-

Participants:

Post O3 Upgrade portal

Schedule

  • IX: Payload was recovered. To the finalization.
  • EX: Aligned for the green beam again. To the finalization
  • IY: F1 was recovered. Adjustable range of F0 was extended (Height range). To the height adjustment.

  • EY: Mirror cleaning is on going. The shipping will be in the next week (transported after holidays).

Status

  • Corrugate tube fixing jig: Replaced on 7/12-13.
  • TM height setting: ITMY.
  • Commissioning in air: X-arm.
  • Commissioning in vacuum:
  • Overall commissioning:
  • Acceptance check: Every Friday.
  • PF actuator: After SC.
  • Separation of rack in 2F: This is scheduled on 7/16.
  • New vacuum pumps for V-chambers: Problem on the support for GVs.

Discussion


VIS Meeting

14:00-

Participants:

Klog

EX

  • 17376 ETMX IM dewhitening filters and comb60 filters are implemented , takafumi.ushiba

  • 17396 Oplev preparation at EXC , takaaki.yokozawa

  • 17450 Oplev calibration EX TM oplev , takaaki.yokozawa

  • 17496 ETMX IM photosensor trouble shooting , takafumi.ushiba

  • 17503 Rebooter installation for pico motor drivers. (ETMX) , koji.nakagaki

  • 17506 Replacement of fixing jigs for the corrugate tube , ryutaro.takahashi

  • 17267 Oplev preparation work EX , takaaki.yokozawa

    • 17362 Comment , takaaki.yokozawa

  • 17358 Injection of OpLev lasers to the cryostat at EXC , takafumi.ushiba

    • 17361 Comment , takaaki.yokozawa

EY

  • 17457 dial gauge installation, Pico motor cable extension test , naohisa.satou

  • 17485 Replacement of fixing jigs for the corrugate tube , ryutaro.takahashi

  • 17485 Replacement of fixing jigs for the corrugate tube , ryutaro.takahashi

    • 17505 Comment , ryutaro.takahashi

General

  • 17369 Added EPICS channel for VIS temperature adjustment , satoru.ikeda

  • 17368 Implemented some Oplev-related fixes to the VIS model file. , satoru.ikeda

  • 17388 Implementation of sensor to EULER matrix for IM photosensors , takafumi.ushiba

  • 17455 TypeA,B,Bp VIS Guardian changed to SAFE , satoru.ikeda

  • (!) 17513 Safe.snap of MCi,e,o are updated after Miyoki-san closed laser shutter. , kouseki.miyo

  • 17079 Organizing DAQ channels for VIS , satoru.ikeda

    • 17460 Comment , satoru.ikeda

IX

  • 17400 Modification of damp_temp filter for MN DAMP filter of ITMX , takafumi.ushiba

  • 17405 IX Pico motor driver was broken and replaced. , koji.nakagaki

  • 17449 Oplev calibration IX TM oplevs , takaaki.yokozawa

  • 17468 MNH1 actuator of ITMX seems to have an issue. , takafumi.ushiba

  • 17482 Re-calibration of the IX TM length oplev , takaaki.yokozawa

  • 17481 ITMX MNH1 cable repairement , takafumi.ushiba

  • 17247 Rebooter installation for pico motor drivers. (ITMX) , koji.nakagaki

    • 17502 Comment , koji.nakagaki

    • (!) 17522 Comment , koji.nakagaki

  • 17335 Checked resistance of TF and BF LVDT actuators coil. , naohisa.satou

    • 17367 Comment , naohisa.satou

    • 17377 Comment , ryutaro.takahashi

  • 17405 IX Pico motor driver was broken and replaced. , koji.nakagaki

    • 17420 Comment , satoru.ikeda

  • 17449 Oplev calibration IX TM oplevs , takaaki.yokozawa

    • 17461 Comment , takafumi.ushiba

    • 17469 Comment , takafumi.ushiba

    • 17497 Comment , kouseki.miyo

  • 17468 MNH1 actuator of ITMX seems to have an issue. , takafumi.ushiba

    • 17472 Comment , takafumi.ushiba

  • 17481 ITMX MNH1 cable repairement , takafumi.ushiba

    • 17501 Comment , takafumi.ushiba

    • (!) 17516 Comment , takafumi.ushiba

  • 17482 Re-calibration of the IX TM length oplev , takaaki.yokozawa

    • 17488 Comment , takafumi.ushiba

  • 8564 ITMX healthy check after pump down , lucia.trozzo

    • 17366 Comment , kouseki.miyo

IY

  • 17406 Setup of pre-isolator , ryutaro.takahashi

  • 17484 Replacement of fixing jigs for the corrugate tube , ryutaro.takahashi

  • 17406 Setup of pre-isolator , ryutaro.takahashi

    • 17431 Comment , ryutaro.takahashi

    • 17441 Comment , ryutaro.takahashi

    • 17498 Comment , naohisa.satou

    • (!) 17526 Comment , ryutaro.takahashi

MCE

  • (!) 17523 About the placement of the mini-rack in MCE , koji.nakagaki

PR2

  • 17478 Rotate PR2 mirror by IM_YAW picomotor but we had better to use traverser , kouseki.miyo

  • (!) 17520 PR2 Traversor motor and PR2 IM PITCH drive Picomotor , satoru.ikeda

SR2

  • 17434 Cable connection check , naoatsu.hirata

SR3

  • 17439 Cable connection check , naoatsu.hirata

SRM

  • 17314 Optical lever installation , fabian.arellano

    • 17372 Comment , fabian.arellano

    • 17499 Comment , terrence.tsang

This is generated by python script in /users/Miyo/dropbox/Script/scrapping/main.py.

Summary Report

Type-A

  • IY: Recovered the F1, F2 FRs. Compressed the F0 blades more to extend the height range. Total adjustable range became +/- 10.6mm.
  • IX: Calibrated the BF damper. The LVDT driver was replaced to the low noise one.
  • The corrugate tube fixing jigs were replaced in IY, EY, and EX.

Type-B

Type-Bp

Type-C

Electronics

Control

Schedule

See Schedule

  • Type-A team: Height adjustment of IYV
  • Type-B team: MSB

Milestone

  • IMC suspensions are ready in air [40] will finish 2021/04/21.

  • PRs are ready in air [643] will finish 2021/07/09.

  • ETMX is ready in air [656] will finish 2021/08/25.

  • ITMX is ready in air [657] will finish 2021/08/31.

  • ETMY is ready in air [658] will finish 2021/09/16.

  • ITMY is ready in air [659] will finish 2021/11/08.

  • BS is ready in air [691] will finish 2021/11/24.

  • SRs are ready in air [663] will finish 2021/12/20.

  • Output suspensions are ready in air [695] will finish 2021/12/21.

  • TMSY is ready in air [708] will finish 2021/??/??.

  • TMSX is ready in air [684] will finish 2021/??/??.

2021/03/29 updated

Safety

Discussion

Travel Plans

The week from 7/19

  • Takahashi: 7/19-21
  • Sato: 7/19-21
  • Hirata: 7/19-21
  • Yano: 7/19-21

The week from 7/26

  • Takahashi: 7/26-30
  • Hirata: 7/26-30
  • Yano: 7/26-30

Next meeting

  • 2021/7/30(FRI)

KAGRA/Subgroups/VIS/VISMinutes20210716 (last edited 2021-07-16 14:26:07 by RyutaroTakahashi)