Line 32: Line 32:

== Next meeting ==
 * 2021/7/16(FRI)
Line 115: Line 112:
 * Adjusted the ballasts on the cryo-payload and the BF in IY. Additional spring was implemented on the BF.
 * Repaired the broken cables for TF/BF actuator opening the chamber. The BF and TF were recovered and the chamber was closed.
Line 126: Line 120:
 * Type-A team: Adjustment of IYV  * Type-A team: Height adjustment of IYV
Line 148: Line 142:
The week from 7/5 The week from 7/19
Line 150: Line 144:
 * Takahashi: 7/5-8 (KIW8 7/7-9)
 * Sato: 7/5-8
 * Hirata: 7/5-9
 * Yano: 7/5-9
 * Takahashi: 7/19-21
 * Sato: 7/19-21
 * Hirata: 7/19-21
 * Yano: 7/19-21
Line 155: Line 149:
The week from 7/12 The week from 7/26
Line 157: Line 151:
 * Takahashi: 7/12-16
 * Sato: 7/12-16

 * Hirata: 7/12-16
 * Yano: 7/12-16
 * Takahashi: 7/26-30
 * Hirata: 7/26-30
 * Yano: 7/26-30
Line 163: Line 156:
 * 2021/7/16(FRI)  * 2021/7/30(FRI)

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2021/7/16 13:00-

Participants:

Post O3 Upgrade portal

Schedule

  • IX: Payload was recovered. To the finalization.
  • EX: Aligned for the green beam again. To the finalization
  • IY: F1 was recovered. Adjustable range of F0 was extended (Height range). To the height adjustment.

  • EY: Mirror cleaning is on going. The shipping will be in the end of next week (after holidays).

Status

  • Corrugate tube fixing jig: Replaced on 7/12-13.
  • TM height setting: ITMY.
  • Commissioning in air: X-arm.
  • Commissioning in vacuum:
  • Overall commissioning:
  • Acceptance check: Every Friday.
  • PF actuator: After SC.
  • Separation of rack in 2F: This is scheduled on 7/16.
  • New vacuum pumps for V-chambers: Problem on the support for GVs.

Discussion

Klog

EX

  • 17376 ETMX IM dewhitening filters and comb60 filters are implemented , takafumi.ushiba

  • 17396 Oplev preparation at EXC , takaaki.yokozawa

  • 17450 Oplev calibration EX TM oplev , takaaki.yokozawa

  • 17496 ETMX IM photosensor trouble shooting , takafumi.ushiba

  • 17503 Rebooter installation for pico motor drivers. (ETMX) , koji.nakagaki

  • 17506 Replacement of fixing jigs for the corrugate tube , ryutaro.takahashi

  • 17267 Oplev preparation work EX , takaaki.yokozawa

    • 17362 Comment , takaaki.yokozawa

  • 17358 Injection of OpLev lasers to the cryostat at EXC , takafumi.ushiba

    • 17361 Comment , takaaki.yokozawa

EY

  • 17457 dial gauge installation, Pico motor cable extension test , naohisa.satou

  • 17485 Replacement of fixing jigs for the corrugate tube , ryutaro.takahashi

  • 17485 Replacement of fixing jigs for the corrugate tube , ryutaro.takahashi

    • 17505 Comment , ryutaro.takahashi

General

  • 17369 Added EPICS channel for VIS temperature adjustment , satoru.ikeda

  • 17368 Implemented some Oplev-related fixes to the VIS model file. , satoru.ikeda

  • 17388 Implementation of sensor to EULER matrix for IM photosensors , takafumi.ushiba

  • 17455 TypeA,B,Bp VIS Guardian changed to SAFE , satoru.ikeda

  • (!) 17513 Safe.snap of MCi,e,o are updated after Miyoki-san closed laser shutter. , kouseki.miyo

  • 17079 Organizing DAQ channels for VIS , satoru.ikeda

    • 17460 Comment , satoru.ikeda

IX

  • 17400 Modification of damp_temp filter for MN DAMP filter of ITMX , takafumi.ushiba

  • 17405 IX Pico motor driver was broken and replaced. , koji.nakagaki

  • 17449 Oplev calibration IX TM oplevs , takaaki.yokozawa

  • 17468 MNH1 actuator of ITMX seems to have an issue. , takafumi.ushiba

  • 17482 Re-calibration of the IX TM length oplev , takaaki.yokozawa

  • 17481 ITMX MNH1 cable repairement , takafumi.ushiba

  • 17247 Rebooter installation for pico motor drivers. (ITMX) , koji.nakagaki

    • 17502 Comment , koji.nakagaki

    • (!) 17522 Comment , koji.nakagaki

  • 17335 Checked resistance of TF and BF LVDT actuators coil. , naohisa.satou

    • 17367 Comment , naohisa.satou

    • 17377 Comment , ryutaro.takahashi

  • 17405 IX Pico motor driver was broken and replaced. , koji.nakagaki

    • 17420 Comment , satoru.ikeda

  • 17449 Oplev calibration IX TM oplevs , takaaki.yokozawa

    • 17461 Comment , takafumi.ushiba

    • 17469 Comment , takafumi.ushiba

    • 17497 Comment , kouseki.miyo

  • 17468 MNH1 actuator of ITMX seems to have an issue. , takafumi.ushiba

    • 17472 Comment , takafumi.ushiba

  • 17481 ITMX MNH1 cable repairement , takafumi.ushiba

    • 17501 Comment , takafumi.ushiba

    • (!) 17516 Comment , takafumi.ushiba

  • 17482 Re-calibration of the IX TM length oplev , takaaki.yokozawa

    • 17488 Comment , takafumi.ushiba

  • 8564 ITMX healthy check after pump down , lucia.trozzo

    • 17366 Comment , kouseki.miyo

IY

  • 17406 Setup of pre-isolator , ryutaro.takahashi

  • 17484 Replacement of fixing jigs for the corrugate tube , ryutaro.takahashi

  • 17406 Setup of pre-isolator , ryutaro.takahashi

    • 17431 Comment , ryutaro.takahashi

    • 17441 Comment , ryutaro.takahashi

    • 17498 Comment , naohisa.satou

    • (!) 17526 Comment , ryutaro.takahashi

MCE

  • (!) 17523 About the placement of the mini-rack in MCE , koji.nakagaki

PR2

  • 17478 Rotate PR2 mirror by IM_YAW picomotor but we had better to use traverser , kouseki.miyo

  • (!) 17520 PR2 Traversor motor and PR2 IM PITCH drive Picomotor , satoru.ikeda

SR2

  • 17434 Cable connection check , naoatsu.hirata

SR3

  • 17439 Cable connection check , naoatsu.hirata

SRM

  • 17314 Optical lever installation , fabian.arellano

    • 17372 Comment , fabian.arellano

    • 17499 Comment , terrence.tsang

This is generated by python script in /users/Miyo/dropbox/Script/scrapping/main.py.

Summary Report

Type-A

Type-B

Type-Bp

Type-C

Electronics

Control

Schedule

See Schedule

  • Type-A team: Height adjustment of IYV
  • Type-B team: MSB

Milestone

  • IMC suspensions are ready in air [40] will finish 2021/04/21.

  • PRs are ready in air [643] will finish 2021/07/09.

  • ETMX is ready in air [656] will finish 2021/08/25.

  • ITMX is ready in air [657] will finish 2021/08/31.

  • ETMY is ready in air [658] will finish 2021/09/16.

  • ITMY is ready in air [659] will finish 2021/11/08.

  • BS is ready in air [691] will finish 2021/11/24.

  • SRs are ready in air [663] will finish 2021/12/20.

  • Output suspensions are ready in air [695] will finish 2021/12/21.

  • TMSY is ready in air [708] will finish 2021/??/??.

  • TMSX is ready in air [684] will finish 2021/??/??.

2021/03/29 updated

Safety

Discussion

Travel Plans

The week from 7/19

  • Takahashi: 7/19-21
  • Sato: 7/19-21
  • Hirata: 7/19-21
  • Yano: 7/19-21

The week from 7/26

  • Takahashi: 7/26-30
  • Hirata: 7/26-30
  • Yano: 7/26-30

Next meeting

  • 2021/7/30(FRI)