Line 8: | Line 8: |
Date: 2021/7/9 13:00-14:00 Participants: Takahashi, Ikeda, Sato, Ushiba, Kimura, Aso, Tomaru, Node, Hirata |
Date: 2021/7/16 13:00-13:35 Participants: Takahashi, Node, Ikeda, Ushiba, Tomaru, Sato, Aso, Kimura, Miyo |
Line 15: | Line 15: |
* IX: To the finalization. * EX: Alignment for the green beam was finished. To the finalization * IY: Height adjustment is on going. * EY: Mirror cleaning is on going in Mitaka. Measurement system had a problem. The shipping will be in the end of next week at earliest. |
* IX: Still some cabling from payload have problems. To the finalization. * EX: Aligned for the green beam again. To the finalization * IY: F1 was recovered. Adjustable range of F0 was extended ([[https://www.dropbox.com/s/a8p7m6luxz6ndwn/Height%20range%20rev.pdf?dl=0|Height range]]). Range of BF damper should be taken into account. The height adjustment was scheduled in the week of 7/26. * EY: Mirror cleaning was almost finished. The shipping will be in the next week (transported after holidays). |
Line 21: | Line 21: |
* Corrugate tube fixing jig: Implementation is scheduled on 7/12-13. | * Corrugate tube fixing jig: Replaced on 7/12-13. |
Line 23: | Line 23: |
* Commissioning in air: X-arm. | * Commissioning in air: on going in X-arm. Oplev calibration is necessary. |
Line 28: | Line 28: |
* Separation of rack in 2F: This is scheduled on 7/16. * New vacuum pumps for V-chambers: Considering the port location. * Extension of cables for picomotor drivers: Tested in EYV. |
* Separation of rack in 2F: It was finished on 7/16. * New vacuum pumps for V-chambers: Problem on the support for GVs. |
Line 33: | Line 32: |
Adjustable height range of the filter chain in IY * [[https://www.dropbox.com/s/i7e0grqv324sdfz/Height%20range.pdf?dl=0|Present height range]] * The condition of F1 stepper motor is the same as the F3 in IX. We tried to move the motor with the stand alone driver, but the FR is still not working. * The motor is still not working? * The FR slider is stuck? * The range of BF is too small. Check the mechanical stopper. * Tune the F0 more to lower frequency (now 0.4Hz) in order to extend the range. == Next meeting == * 2021/7/16(FRI) |
---------- = VIS Meeting = 14:00-14:20 Participants: Takahashi, Miyo, Terrence, Sato, Fabian, Aso, Tanaka, Ishizaki |
Line 46: | Line 40: |
Line 49: | Line 44: |
* (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17496|17496]] ETMX IM photosensor trouble shooting , __takafumi.ushiba__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17267|17267]] Oplev preparation work EX , __takaaki.yokozawa__ |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17496|17496]] ETMX IM photosensor trouble shooting , __takafumi.ushiba__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17503|17503]] Rebooter installation for pico motor drivers. (ETMX) , __koji.nakagaki__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17506|17506]] Replacement of fixing jigs for the corrugate tube , __ryutaro.takahashi__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17267|17267]] Oplev preparation work EX , __takaaki.yokozawa__ |
Line 52: | Line 49: |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17358|17358]] Injection of OpLev lasers to the cryostat at EXC , __takafumi.ushiba__ | * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17358|17358]] Injection of OpLev lasers to the cryostat at EXC , __takafumi.ushiba__ |
Line 54: | Line 51: |
Line 55: | Line 53: |
Line 57: | Line 56: |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17485|17485]] Replacement of fixing jigs for the corrugate tube , __ryutaro.takahashi__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17505|17505]] Comment , __ryutaro.takahashi__ |
|
Line 58: | Line 60: |
Line 62: | Line 65: |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17079|17079]] Organizing DAQ channels for VIS , __satoru.ikeda__ | * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17513|17513]] Safe.snap of MCi,e,o are updated after Miyoki-san closed laser shutter. , __kouseki.miyo__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17079|17079]] Organizing DAQ channels for VIS , __satoru.ikeda__ |
Line 64: | Line 68: |
Line 65: | Line 70: |
Line 71: | Line 77: |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17335|17335]] Checked resistance of TF and BF LVDT actuators coil. , __naohisa.satou__ | * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17247|17247]] Rebooter installation for pico motor drivers. (ITMX) , __koji.nakagaki__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17502|17502]] Comment , __koji.nakagaki__ * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17522|17522]] Comment , __koji.nakagaki__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17335|17335]] Checked resistance of TF and BF LVDT actuators coil. , __naohisa.satou__ |
Line 74: | Line 83: |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17405|17405]] IX Pico motor driver was broken and replaced. , __koji.nakagaki__ | * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17405|17405]] IX Pico motor driver was broken and replaced. , __koji.nakagaki__ |
Line 76: | Line 85: |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17449|17449]] Oplev calibration IX TM oplevs , __takaaki.yokozawa__ | * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17449|17449]] Oplev calibration IX TM oplevs , __takaaki.yokozawa__ |
Line 79: | Line 88: |
* (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17497|17497]] Comment , __kouseki.miyo__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17468|17468]] MNH1 actuator of ITMX seems to have an issue. , __takafumi.ushiba__ |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17497|17497]] Comment , __kouseki.miyo__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17468|17468]] MNH1 actuator of ITMX seems to have an issue. , __takafumi.ushiba__ |
Line 82: | Line 91: |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17482|17482]] Re-calibration of the IX TM length oplev , __takaaki.yokozawa__ | * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17481|17481]] ITMX MNH1 cable repairement , __takafumi.ushiba__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17501|17501]] Comment , __takafumi.ushiba__ * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17516|17516]] Comment , __takafumi.ushiba__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17482|17482]] Re-calibration of the IX TM length oplev , __takaaki.yokozawa__ |
Line 84: | Line 96: |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=8564|8564]] ITMX healthy check after pump down , __lucia.trozzo__ | * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=8564|8564]] ITMX healthy check after pump down , __lucia.trozzo__ |
Line 86: | Line 98: |
Line 87: | Line 100: |
Line 89: | Line 103: |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17406|17406]] Setup of pre-isolator , __ryutaro.takahashi__ | * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17406|17406]] Setup of pre-isolator , __ryutaro.takahashi__ |
Line 92: | Line 106: |
* (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17498|17498]] Comment , __naohisa.satou__ | * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17498|17498]] Comment , __naohisa.satou__ * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17526|17526]] Comment , __ryutaro.takahashi__ '''MCE''' * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17523|17523]] About the placement of the mini-rack in MCE , __koji.nakagaki__ |
Line 94: | Line 114: |
Line 95: | Line 116: |
* (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17520|17520]] PR2 Traversor motor and PR2 IM PITCH drive Picomotor , __satoru.ikeda__ |
|
Line 96: | Line 119: |
Line 97: | Line 121: |
Line 98: | Line 123: |
Line 99: | Line 125: |
Line 100: | Line 127: |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17314|17314]] Optical lever installation , __fabian.arellano__ | * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17314|17314]] Optical lever installation , __fabian.arellano__ |
Line 102: | Line 130: |
* (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17499|17499]] Comment , __terrence.tsang__ | * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17499|17499]] Comment , __terrence.tsang__ |
Line 105: | Line 133: |
Line 107: | Line 136: |
* Adjusted the ballasts on the cryo-payload and the BF in IY. Additional spring was implemented on the BF. * Repaired the broken cables for TF/BF actuator opening the chamber. The BF and TF were recovered and the chamber was closed. |
* IY: Recovered the F1, F2 FRs. Compressed the F0 blades more to extend the height range. Total adjustable range became +/- 10.6mm. * IX: Calibrated the BF damper. The LVDT driver was replaced to the low noise one. * The corrugate tube fixing jigs were replaced in IY, EY, and EX. |
Line 111: | Line 141: |
* This week we installed SR2 oplev hardware and routed the power cable from the rack to the SLED. Next week we'll align the optical components. * On the week before the ast one, we installed the SRM oplev optics, aligned the optical components and calibrated the QPD in terms of their displacements. * [Terrence] SRM optical lever was calibrated and diagonalized. But the noise floor is too high to render it useful for my purpose. [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=17499|klog 17499]]. * I synthesized a sensor correction filter according to the seismometer noise and seismic noise in KAGRA. It resembles the LIGO filter but with lower noise amplification. (show notebook) * About SRM. * I was given a month to work on the SRM and unfortunately I can't finish everything that I wish to do. Today is the deadline so I will stop working on it, unless I am given more time to work on it. * It would be useless if I don't share my knowledge with commissioners. But I know you are all busy and you might already have your own plan on how to configure the suspensions. I don't want to force people to listen to my stuff. But, just in case if people want to know how I do particular things, I will be very happy to share. |
|
Line 114: | Line 152: |
* Power supply for IX and IY was changed. |
|
Line 118: | Line 158: |
* Type-A team: Adjustment of IYV * Type-B team: MSB |
* Type-A team: Finalization of IX and EX. * Type-B team: Oplev alignment in SR2 and SRM. |
Line 139: | Line 179: |
BS Outer frame * The brace (support beam) for BS outer frame was not attached in O3. The brace itself is ready. * We have a structure analysis for the frame prototype (SR type), but not for the BS type. * I like to ask Sato-san the analysis for BS type to confirm the availability. |
|
Line 140: | Line 186: |
The week from 7/5 * Takahashi: 7/5-8 (KIW8 7/7-9) * Sato: 7/5-8 * Hirata: 7/5-9 * Yano: 7/5-9 The week from 7/12 * Takahashi: 7/12-16 * Sato: 7/12-16 * Hirata: 7/12-16 * Yano: 7/12-16 |
The week from 7/19 * Takahashi: 7/19-21 * Sato: 7/19-21 * Hirata: 7/19-21 * Yano: 7/19-21 The week from 7/26 * Takahashi: 7/26-30 * Hirata: 7/26-30 * Yano: 7/26-30 |
Line 155: | Line 200: |
* 2021/7/16(FRI) | * 2021/7/30(FRI) |
Contents
Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2021/7/16 13:00-13:35
Participants: Takahashi, Node, Ikeda, Ushiba, Tomaru, Sato, Aso, Kimura, Miyo
Schedule
- IX: Still some cabling from payload have problems. To the finalization.
- EX: Aligned for the green beam again. To the finalization
IY: F1 was recovered. Adjustable range of F0 was extended (Height range). Range of BF damper should be taken into account. The height adjustment was scheduled in the week of 7/26.
- EY: Mirror cleaning was almost finished. The shipping will be in the next week (transported after holidays).
Status
- Corrugate tube fixing jig: Replaced on 7/12-13.
- TM height setting: ITMY.
- Commissioning in air: on going in X-arm. Oplev calibration is necessary.
- Commissioning in vacuum:
- Overall commissioning:
- Acceptance check: Every Friday.
- PF actuator: After SC.
- Separation of rack in 2F: It was finished on 7/16.
- New vacuum pumps for V-chambers: Problem on the support for GVs.
Discussion
VIS Meeting
14:00-14:20
Participants: Takahashi, Miyo, Terrence, Sato, Fabian, Aso, Tanaka, Ishizaki
Klog
EX
17376 ETMX IM dewhitening filters and comb60 filters are implemented , takafumi.ushiba
17396 Oplev preparation at EXC , takaaki.yokozawa
17450 Oplev calibration EX TM oplev , takaaki.yokozawa
17496 ETMX IM photosensor trouble shooting , takafumi.ushiba
17503 Rebooter installation for pico motor drivers. (ETMX) , koji.nakagaki
17506 Replacement of fixing jigs for the corrugate tube , ryutaro.takahashi
17267 Oplev preparation work EX , takaaki.yokozawa
17362 Comment , takaaki.yokozawa
17358 Injection of OpLev lasers to the cryostat at EXC , takafumi.ushiba
17361 Comment , takaaki.yokozawa
EY
17457 dial gauge installation, Pico motor cable extension test , naohisa.satou
17485 Replacement of fixing jigs for the corrugate tube , ryutaro.takahashi
17485 Replacement of fixing jigs for the corrugate tube , ryutaro.takahashi
17505 Comment , ryutaro.takahashi
General
17369 Added EPICS channel for VIS temperature adjustment , satoru.ikeda
17368 Implemented some Oplev-related fixes to the VIS model file. , satoru.ikeda
17388 Implementation of sensor to EULER matrix for IM photosensors , takafumi.ushiba
17455 TypeA,B,Bp VIS Guardian changed to SAFE , satoru.ikeda
17513 Safe.snap of MCi,e,o are updated after Miyoki-san closed laser shutter. , kouseki.miyo
17079 Organizing DAQ channels for VIS , satoru.ikeda
17460 Comment , satoru.ikeda
IX
17400 Modification of damp_temp filter for MN DAMP filter of ITMX , takafumi.ushiba
17405 IX Pico motor driver was broken and replaced. , koji.nakagaki
17449 Oplev calibration IX TM oplevs , takaaki.yokozawa
17468 MNH1 actuator of ITMX seems to have an issue. , takafumi.ushiba
17482 Re-calibration of the IX TM length oplev , takaaki.yokozawa
17481 ITMX MNH1 cable repairement , takafumi.ushiba
17247 Rebooter installation for pico motor drivers. (ITMX) , koji.nakagaki
17335 Checked resistance of TF and BF LVDT actuators coil. , naohisa.satou
17405 IX Pico motor driver was broken and replaced. , koji.nakagaki
17420 Comment , satoru.ikeda
17449 Oplev calibration IX TM oplevs , takaaki.yokozawa
17468 MNH1 actuator of ITMX seems to have an issue. , takafumi.ushiba
17472 Comment , takafumi.ushiba
17481 ITMX MNH1 cable repairement , takafumi.ushiba
17482 Re-calibration of the IX TM length oplev , takaaki.yokozawa
17488 Comment , takafumi.ushiba
8564 ITMX healthy check after pump down , lucia.trozzo
17366 Comment , kouseki.miyo
IY
17406 Setup of pre-isolator , ryutaro.takahashi
17484 Replacement of fixing jigs for the corrugate tube , ryutaro.takahashi
17406 Setup of pre-isolator , ryutaro.takahashi
MCE
17523 About the placement of the mini-rack in MCE , koji.nakagaki
PR2
17478 Rotate PR2 mirror by IM_YAW picomotor but we had better to use traverser , kouseki.miyo
17520 PR2 Traversor motor and PR2 IM PITCH drive Picomotor , satoru.ikeda
SR2
17434 Cable connection check , naoatsu.hirata
SR3
17439 Cable connection check , naoatsu.hirata
SRM
17314 Optical lever installation , fabian.arellano
This is generated by python script in /users/Miyo/dropbox/Script/scrapping/main.py.
Summary Report
Type-A
- IY: Recovered the F1, F2 FRs. Compressed the F0 blades more to extend the height range. Total adjustable range became +/- 10.6mm.
- IX: Calibrated the BF damper. The LVDT driver was replaced to the low noise one.
- The corrugate tube fixing jigs were replaced in IY, EY, and EX.
Type-B
- This week we installed SR2 oplev hardware and routed the power cable from the rack to the SLED. Next week we'll align the optical components.
- On the week before the ast one, we installed the SRM oplev optics, aligned the optical components and calibrated the QPD in terms of their displacements.
[Terrence] SRM optical lever was calibrated and diagonalized. But the noise floor is too high to render it useful for my purpose. klog 17499.
- I synthesized a sensor correction filter according to the seismometer noise and seismic noise in KAGRA. It resembles the LIGO filter but with lower noise amplification. (show notebook)
- About SRM.
- I was given a month to work on the SRM and unfortunately I can't finish everything that I wish to do. Today is the deadline so I will stop working on it, unless I am given more time to work on it.
- It would be useless if I don't share my knowledge with commissioners. But I know you are all busy and you might already have your own plan on how to configure the suspensions. I don't want to force people to listen to my stuff. But, just in case if people want to know how I do particular things, I will be very happy to share.
Type-Bp
Type-C
Electronics
- Power supply for IX and IY was changed.
Control
Schedule
See Schedule
- Type-A team: Finalization of IX and EX.
- Type-B team: Oplev alignment in SR2 and SRM.
Milestone
IMC suspensions are ready in air [40] will finish 2021/04/21.
PRs are ready in air [643] will finish 2021/07/09.
ETMX is ready in air [656] will finish 2021/08/25.
ITMX is ready in air [657] will finish 2021/08/31.
ETMY is ready in air [658] will finish 2021/09/16.
ITMY is ready in air [659] will finish 2021/11/08.
BS is ready in air [691] will finish 2021/11/24.
SRs are ready in air [663] will finish 2021/12/20.
Output suspensions are ready in air [695] will finish 2021/12/21.
TMSY is ready in air [708] will finish 2021/??/??.
TMSX is ready in air [684] will finish 2021/??/??.
2021/03/29 updated
Safety
Discussion
BS Outer frame
- The brace (support beam) for BS outer frame was not attached in O3. The brace itself is ready.
- We have a structure analysis for the frame prototype (SR type), but not for the BS type.
- I like to ask Sato-san the analysis for BS type to confirm the availability.
Travel Plans
The week from 7/19
- Takahashi: 7/19-21
- Sato: 7/19-21
- Hirata: 7/19-21
- Yano: 7/19-21
The week from 7/26
- Takahashi: 7/26-30
- Hirata: 7/26-30
- Yano: 7/26-30
Next meeting
- 2021/7/30(FRI)