Contents
Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2021/10/15 13:00-13:25
Participants: Takahashi, Hirata, Miyoki, Yasui, Ikeda, Ushiba, Uchiyama, Yokozawa, Sato, Node
Schedule
- IX: Health check. F0 behavire.
- EX: Health check.
- IY: (LVDT driver. Cable check.)
- EY: H4 geophone. F0 FR. Height adjustment. LVDT driver. IP position. Insulator repair.
Status
- TM height setting: ITMY
- Commissioning in air: Health check.
- Commissioning in vacuum:
- Overall commissioning:
- Acceptance check:
- PF actuator: At the in-vacuum commissioning.
- New vacuum pumps for V-chambers: Under the bidding process.
- Heater control: To PRs in the next.
Discussion
VIS Meeting
Date: 2021/10/15 14:00-
Participants:
Summary Report
Type-A
Type-B
Type-Bp
Type-C
Electronics
Control
Schedule
See Schedule
- Type-A team:
- Type-B team:
Safety
Discussion
Travel Plans
(Date in Kamioka)
The week from 10/18
- Hirata: 10/18-22
- Yano: 10/18-22
The week from 10/25
- Takahashi: 10/26-29
- Sato: 10/26-29
- Hirata: 10/26-29
- Yano: 10/25-29
Next meeting
- 2021/10/22(FRI)