Contents
Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2021/10/29 13:00-
Participants:
Schedule
- IX: Health check. BF actuator. HPCD.
- EX: Health check. BF damper (V). HPCD.
- IY: LVDT driver for IP/F0. H4 geophone.
- EY:
Status
- Flip cable:
- TM height setting: ITMY
- Oplev:
- ACC: Ready to install to EX. Measurement for IY.
- Commissioning in air: Health check.
- Commissioning in vacuum:
- Overall commissioning:
- Acceptance check:
- PF actuator: At the in-vacuum commissioning.
- New vacuum pumps for V-chambers: Nov. 25-26 in IXV.
- Heater control:
Discussion
VIS Meeting
Date: 2021/10/29 14:00-
Participants:
Summary Report
Type-A
Type-B
Type-Bp
Type-C
Electronics
Control
Schedule
See Schedule
- Type-A team: BF damper in EX. ACC for IY.
- Type-B team:
Safety
Discussion
Travel Plans
(Date in Kamioka)
The week from 11/1
- Takahashi: 11/1-2
- Hirata: 11/2-5
The week from 11/8
- Takahashi: 11/9-12
- Sato: 11/9-12
- Hirata: 11/8-10
Next meeting
- 2021/11/5(FRI)