Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2021/10/29 13:00-

Participants:

Post O3 Upgrade portal

Schedule

  • IX: Health check. BF actuator. HPCD.
  • EX: Health check. BF damper (V). HPCD.
  • IY: LVDT driver for IP/F0. H4 geophone.
  • EY:

Status

  • Replacement of Flip cable:
  • Mirror cleanliness:
  • TM height setting: ITMY
  • Oplev:
  • ACC: Ready to install to EX. Measurement for IY.
  • Commissioning in air: Health check.
  • Commissioning in vacuum:
  • Overall commissioning:
  • Acceptance check:
  • PF actuator: At the in-vacuum commissioning.
  • New vacuum pumps for V-chambers: Nov. 25-26 in IXV.
  • Heater control:

Discussion


VIS Meeting

Date: 2021/10/29 14:00-

Participants:

Summary Report

Type-A

Type-B

Type-Bp

Type-C

Electronics

Control

Schedule

See Schedule

  • Type-A team: BF damper in EX. ACC for IY.
  • Type-B team:

Safety

Discussion

Travel Plans

(Date in Kamioka)

The week from 11/1

  • Takahashi: 11/1-2
  • Hirata: 11/2-5

The week from 11/8

  • Takahashi: 11/9-12
  • Sato: 11/9-12
  • Hirata: 11/8-10

Next meeting

  • 2021/11/5(FRI)