⇤ ← Revision 1 as of 2021-11-25 20:39:59
Size: 1686
Comment:
|
Size: 2397
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 10: | Line 10: |
Participants: | Participants: |
Line 17: | Line 17: |
* IY: * EY: |
* IY: * EY: |
Line 39: | Line 39: |
Participants: | Participants: |
Line 44: | Line 44: |
==== About the BS F1 LVDT problem ==== * We identified a place to mount the optical displacement sensor for calibrating the LVDT. * The sensor use an area on the BF cap free of ballast masses and cables. * It should be held from the pillar of the security structure. '''Hirata-san and I already have a plan'''. We'll use some components from Thorlabs and a couple of new pieces. * Takase-san finished making holes to electronics adapter box. * I did an experiment and it increased the SNR by a factor of 21. * Yesterday we covered the flanges of the SR2 and BS chambers and turned the Koach filters off, so today I quickly checked whether the moving peak in F1 LVDT spectra was still there: it is. |
|
Line 52: | Line 60: |
* Type-B team: | * Type-B team: |
Contents
Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2021/11/26 13:00-
Participants:
Schedule
- IX: Finalization of cryo-payload.
- EX: Finalization of cryo-payload. Installation of ACCs. Replacement of flip cables.
- IY:
- EY:
Status
- Replacement of Flip cable: EX on 11/25-26. IX in the next week.
- TM height setting: ITMY.
- Oplev: Setup of the TM Oplev in IY after the TM alignment.
- ACC: Installed to EX on 11/24-25. Assembly for EY is ongoing.
- Commissioning in air: GRY.
- Commissioning in vacuum: Chamber closing is scheduled from 12/13.
- Overall commissioning:
- Acceptance check:
- PF actuator: At the in-vacuum commissioning.
- New vacuum pumps for V-chambers: 11/24 in IXV.
- Heater control:
- Power source for Oplev: The next target is IX.
Discussion
VIS Meeting
Date: 2021/11/26 14:00-
Participants:
Summary Report
Type-A
Type-B
About the BS F1 LVDT problem
- We identified a place to mount the optical displacement sensor for calibrating the LVDT.
- The sensor use an area on the BF cap free of ballast masses and cables.
It should be held from the pillar of the security structure. Hirata-san and I already have a plan. We'll use some components from Thorlabs and a couple of new pieces.
- Takase-san finished making holes to electronics adapter box.
- I did an experiment and it increased the SNR by a factor of 21.
- Yesterday we covered the flanges of the SR2 and BS chambers and turned the Koach filters off, so today I quickly checked whether the moving peak in F1 LVDT spectra was still there: it is.
Type-Bp
Type-C
Electronics
Control
Schedule
See Schedule
- Type-A team: Finalization of IX and EX.
- Type-B team:
Safety
Discussion
Travel Plans
(Date in Kamioka)
The week from 11/29
- Takahashi: 11/30-12/3
- Sato: 11/30-12/3
- Hirata: 11/30-12/3
The week from 12/6
- Takahashi: 12/7-10
- Sato: 12/7-9
- Hirata: 12/7-10
Next meeting
- 2021/12/3(FRI)