Differences between revisions 1 and 7 (spanning 6 versions)
Revision 1 as of 2021-11-25 20:39:59
Size: 1686
Comment:
Revision 7 as of 2021-11-26 13:44:43
Size: 3580
Comment:
Deletions are marked like this. Additions are marked like this.
Line 8: Line 8:
Date: 2021/11/26 13:00- Date: 2021/11/26 13:00-13:40
Line 10: Line 10:
Participants: Participants: Takahashi, Uchiyama, Yasui, Sato, Aso, Ikeda, Kimura, Ushiba, Tomaru, Akutsu, Hirata, Yokozawa, Miyoki
Line 15: Line 15:
 * IX: Finalization of cryo-payload.
 * EX: Finalization of cryo-payload. Installation of ACCs. Replacement of flip cables.
 * IX: Finalization of cryo-payload. It will be finished on 11/26.
 * EX: Finalization of cryo-payload. It will be finished in early next week. Installation of ACCs. Replacement of flip cables.
Line 18: Line 18:
 * EY:  * EY: Some problems were found on the actuators.
Line 21: Line 21:
 * Replacement of Flip cable: EX on 11/25-26. IX in the next week.  * Replacement of Flip cable: EX in this week. IX in the next week.
Line 39: Line 39:
Participants:  Participants:
Line 43: Line 43:
 * Installed the accelerometers to EX.
 * Replaced the flip cables in EX.
Line 44: Line 47:
==== About the BS F1 LVDT problem ====
 * We identified a place to mount the optical displacement sensor for calibrating the LVDT.
 * The sensor use an area on the BF cap free of ballast masses and cables.
 * It should be held from the pillar of the security structure. '''Hirata-san and I already have a plan'''. We'll use some components from Thorlabs and a couple of new pieces.
 * Takase-san finished making holes to electronics adapter box.
 * I did an experiment and it increased the SNR by a factor of 21.
 * Yesterday we covered the flanges of the SR2 and BS chambers and turned the Koach filters off, so today I quickly checked whether the moving peak in F1 LVDT spectra was still there: it is.
==== SR2 ====
 * Derived OpLev calibration factor from old calibration data [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=18980|https://klog.icrr.u-tokyo.ac.jp/osl/?r=18980]]
 * Derived OpLev Sensing Matrix from old distance measurements [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=18993|https://klog.icrr.u-tokyo.ac.jp/osl/?r=18993]]
   * Oplev readouts show agreement with IP readouts to 10-20%.
 * Diagonalization. Cross-couplings are all around/below the 1% level [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=18994|https://klog.icrr.u-tokyo.ac.jp/osl/?r=18994]]
 * IM H1 cable was disconnected from the flanged. Fabian plugged them back. [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=18996|https://klog.icrr.u-tokyo.ac.jp/osl/?r=18996]]
 * I measured all transfer functions and I have modeled them this morning (klog pending)
 * I will update the control filters and test them next week.
Line 52: Line 70:
 * Type-B team:   * Type-B team:

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2021/11/26 13:00-13:40

Participants: Takahashi, Uchiyama, Yasui, Sato, Aso, Ikeda, Kimura, Ushiba, Tomaru, Akutsu, Hirata, Yokozawa, Miyoki

Post O3 Upgrade portal

Schedule

  • IX: Finalization of cryo-payload. It will be finished on 11/26.
  • EX: Finalization of cryo-payload. It will be finished in early next week. Installation of ACCs. Replacement of flip cables.
  • IY:
  • EY: Some problems were found on the actuators.

Status

  • Replacement of Flip cable: EX in this week. IX in the next week.
  • TM height setting: ITMY.
  • Oplev: Setup of the TM Oplev in IY after the TM alignment.
  • ACC: Installed to EX on 11/24-25. Assembly for EY is ongoing.
  • Commissioning in air: GRY.
  • Commissioning in vacuum: Chamber closing is scheduled from 12/13.
  • Overall commissioning:
  • Acceptance check:
  • PF actuator: At the in-vacuum commissioning.
  • New vacuum pumps for V-chambers: 11/24 in IXV.
  • Heater control:
  • Power source for Oplev: The next target is IX.

Discussion


VIS Meeting

Date: 2021/11/26 14:00-

Participants:

Summary Report

Type-A

  • Installed the accelerometers to EX.
  • Replaced the flip cables in EX.

Type-B

About the BS F1 LVDT problem

  • We identified a place to mount the optical displacement sensor for calibrating the LVDT.
  • The sensor use an area on the BF cap free of ballast masses and cables.
  • It should be held from the pillar of the security structure. Hirata-san and I already have a plan. We'll use some components from Thorlabs and a couple of new pieces.

  • Takase-san finished making holes to electronics adapter box.
  • I did an experiment and it increased the SNR by a factor of 21.
  • Yesterday we covered the flanges of the SR2 and BS chambers and turned the Koach filters off, so today I quickly checked whether the moving peak in F1 LVDT spectra was still there: it is.

SR2

Type-Bp

Type-C

Electronics

Control

Schedule

See Schedule

  • Type-A team: Finalization of IX and EX.
  • Type-B team:

Safety

Discussion

Travel Plans

(Date in Kamioka)

The week from 11/29

  • Takahashi: 11/30-12/3
  • Sato: 11/30-12/3
  • Hirata: 11/30-12/3

The week from 12/6

  • Takahashi: 12/7-10
  • Sato: 12/7-9
  • Hirata: 12/7-10

Next meeting

  • 2021/12/3(FRI)

KAGRA/Subgroups/VIS/VISMinutes20211126 (last edited 2021-11-26 14:28:52 by RyutaroTakahashi)