Differences between revisions 3 and 4
Revision 3 as of 2021-11-26 12:25:55
Size: 3193
Comment:
Revision 4 as of 2021-11-26 12:27:00
Size: 3279
Comment:
Deletions are marked like this. Additions are marked like this.
Line 55: Line 55:
 * Diagonalization. Cross-ouplings are all around/below the 1% level [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=18994|https://klog.icrr.u-tokyo.ac.jp/osl/?r=18994]]
 * IM H1 cable were disconnected from the flanged. Fabian helped plugging back them.
 * Diagonalization. Cross-couplings are all around/below the 1% level [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=18994|https://klog.icrr.u-tokyo.ac.jp/osl/?r=18994]]
 * IM H1 cable was disconnected from the flanged. Fabian plugged them back. [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=18996|https://klog.icrr.u-tokyo.ac.jp/osl/?r=18996]]

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2021/11/26 13:00-

Participants:

Post O3 Upgrade portal

Schedule

  • IX: Finalization of cryo-payload.
  • EX: Finalization of cryo-payload. Installation of ACCs. Replacement of flip cables.
  • IY:
  • EY:

Status

  • Replacement of Flip cable: EX on 11/25-26. IX in the next week.
  • TM height setting: ITMY.
  • Oplev: Setup of the TM Oplev in IY after the TM alignment.
  • ACC: Installed to EX on 11/24-25. Assembly for EY is ongoing.
  • Commissioning in air: GRY.
  • Commissioning in vacuum: Chamber closing is scheduled from 12/13.
  • Overall commissioning:
  • Acceptance check:
  • PF actuator: At the in-vacuum commissioning.
  • New vacuum pumps for V-chambers: 11/24 in IXV.
  • Heater control:
  • Power source for Oplev: The next target is IX.

Discussion


VIS Meeting

Date: 2021/11/26 14:00-

Participants:

Summary Report

Type-A

Type-B

About the BS F1 LVDT problem

  • We identified a place to mount the optical displacement sensor for calibrating the LVDT.
  • The sensor use an area on the BF cap free of ballast masses and cables.
  • It should be held from the pillar of the security structure. Hirata-san and I already have a plan. We'll use some components from Thorlabs and a couple of new pieces.

  • Takase-san finished making holes to electronics adapter box.
  • I did an experiment and it increased the SNR by a factor of 21.
  • Yesterday we covered the flanges of the SR2 and BS chambers and turned the Koach filters off, so today I quickly checked whether the moving peak in F1 LVDT spectra was still there: it is.

SR2

Type-Bp

Type-C

Electronics

Control

Schedule

See Schedule

  • Type-A team: Finalization of IX and EX.
  • Type-B team:

Safety

Discussion

Travel Plans

(Date in Kamioka)

The week from 11/29

  • Takahashi: 11/30-12/3
  • Sato: 11/30-12/3
  • Hirata: 11/30-12/3

The week from 12/6

  • Takahashi: 12/7-10
  • Sato: 12/7-9
  • Hirata: 12/7-10

Next meeting

  • 2021/12/3(FRI)