Line 34: Line 34:
  * The author list making process was revised at the F2F meeting in August. As the first step, the author list committee required each subsystem chief to make the task list in each susbsystem.
  * The task list ([[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=13520|Draft]]) to be submitted to SEO by 15th Dec.
  * The tasks listed are not just plans but the tasks which were carried out or will be done within 2021FY. If you have any tasks on VIS not listed but contribited by you, please let me know.
  * The author list making process was revised at the F2F meeting in August. As the first step, the author list committee required each subsystem chief to make the task list in each subsystem.
  * The task list ([[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=13520|Draft]]) should be submitted to SEO by 15th Dec.
  * The tasks listed are not just plans but the tasks which were carried out or will be done within 2021FY. If you have any tasks on VIS not listed but contributed by you, please let me know.

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2021/12/10 13:00-

Acceptance Check Meeting on Suspension.


VIS Meeting

Date: 2021/12/10 14:00-

Participants:

Summary Report

Type-A

Type-B

Type-Bp

Type-C

Electronics

Control

Schedule

See Schedule

  • Type-A team: IMMT. Evacuation in IX and EX.
  • Type-B team:

Safety

Discussion

  • Task list for authorship in VIS
    • The author list making process was revised at the F2F meeting in August. As the first step, the author list committee required each subsystem chief to make the task list in each subsystem.
    • The task list (Draft) should be submitted to SEO by 15th Dec.

    • The tasks listed are not just plans but the tasks which were carried out or will be done within 2021FY. If you have any tasks on VIS not listed but contributed by you, please let me know.

Travel Plans

(Date in Kamioka)

The week from 12/13

  • Takahashi: 12/13-17
  • Sato: 12/13-17
  • Hirata: 12/13-17

The week from 12/20

  • Takahashi: 12/20-24
  • Sato: 12/20-24
  • Hirata: 12/20-24

Next meeting

  • 2021/12/17(FRI)

KAGRA/Subgroups/VIS/VISMinutes20211210 (last edited 2021-12-10 15:05:29 by RyutaroTakahashi)