Line 25: Line 25:
 * Investigated the actuator of the BF damper. The coil from the Dsub connector was touching the bracket for the secondary coil.  * Investigated the actuator of the BF damper. The cable from the Dsub connector was touching the bracket for the secondary coil.

[Ishizaki]
 * Post O4, we are investigating whether SiC can be used as a base plate material to the payload increasing of GAS filters.

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2021/12/10 13:00-

Acceptance Check Meeting on Suspension.


VIS Meeting

Date: 2021/12/10 14:00-

Participants:

Summary Report

Type-A

  • Repaired the thermometer cable in IX.
  • Cleaned the cross tube of EXV with the vacuum cleaner.
  • Investigated the BF V2 LVDT in EX. The noise level may be increased due to the large DC position.
  • Repaired the LVDT driver for the GAS filters in IX. The original main card was noisy.
  • Recovered the yaw FR in F0. The helix-coil spring was too loose.
  • Investigated the actuator of the BF damper. The cable from the Dsub connector was touching the bracket for the secondary coil.

[Ishizaki]

  • Post O4, we are investigating whether SiC can be used as a base plate material to the payload increasing of GAS filters.

Type-B

Type-Bp

Type-C

Electronics

Control

Schedule

See Schedule

  • Type-A team: IMMT. Evacuation in IX and EX.
  • Type-B team:

Safety

Discussion

  • Task list for authorship in VIS
    • The author list making process was revised at the F2F meeting in August. As the first step, the author list committee required each subsystem chief to make the task list in each subsystem.
    • The task list (Draft) should be submitted to SEO by 15th Dec.

    • The tasks listed are not just plans but the tasks carried out within 2021. If you have any tasks on VIS not listed but contributed by you, please let me know.

Travel Plans

(Date in Kamioka)

The week from 12/13

  • Takahashi: 12/13-17
  • Sato: 12/13-17
  • Hirata: 12/13-17

The week from 12/20

  • Takahashi: 12/20-24
  • Sato: 12/20-24
  • Hirata: 12/20-24

Next meeting

  • 2021/12/17(FRI)

KAGRA/Subgroups/VIS/VISMinutes20211210 (last edited 2021-12-10 15:05:29 by RyutaroTakahashi)