Differences between revisions 3 and 4
Revision 3 as of 2021-12-23 21:15:18
Size: 1498
Comment:
Revision 4 as of 2021-12-23 21:15:59
Size: 1520
Comment:
Deletions are marked like this. Additions are marked like this.
Line 24: Line 24:
 * ACC: Assembly for EY.  * ACC: Experiments in IX/EX. Assembly for EY.

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2021/12/24 13:00-

Participants:

Post O3 Upgrade portal

Schedule

  • IX: Pump down on 12/23. Glich in the F3 signals.
  • EX: In vacuum.
  • IY:
  • EY: Recovery of the BF problem.

Status

  • Replacement of flip cables:
  • TM height setting: ITMY.
  • Oplev: Setup of the TM Oplev in IY after the TM alignment.
  • ACC: Experiments in IX/EX. Assembly for EY.
  • Commissioning in air: Return of GRY.
  • Commissioning in vacuum: Pump down of IXC/IXV on 12/23.
  • Overall commissioning:
  • Acceptance check:
  • PF actuator: At the in-vacuum commissioning.
  • New vacuum pumps for V-chambers:
  • Heater control:
  • Power source for Oplev:

Discussion


VIS Meeting

Date: 2021/12/24 14:00-

Participants:

Summary Report

Type-A

Type-B

Type-Bp

Type-C

Electronics

Control

Schedule

See Schedule

  • Type-A team: ACC in EY, Heter test in IXV/EXV
  • Type-B team:

Safety

Discussion

Travel Plans

(Date in Kamioka)

The week from 12/27

(Holidays in 12/29-1/3)

The week from 1/4

  • Takahashi: 1/5-7
  • Sato: 1/5-7
  • Hirata: 1/5-7

Next meeting

  • 2022/1/7(FRI)

KAGRA/Subgroups/VIS/VISMinutes20211224 (last edited 2021-12-24 14:30:35 by RyutaroTakahashi)