Differences between revisions 1 and 4 (spanning 3 versions)
Revision 1 as of 2023-01-05 16:50:44
Size: 1140
Comment:
Revision 4 as of 2023-01-06 13:37:23
Size: 1357
Comment:
Deletions are marked like this. Additions are marked like this.
Line 8: Line 8:
Date: 2023/1/6 13:00- Date: 2023/1/6 13:00-13:20
Line 10: Line 10:
Participants: Participants: Takahashi, Uchiyama, Sato, Miyoki, Node, Ushiba, Ikeda, Aso, Akutsu, Hirata, Mitsuhashi
Line 16: Line 16:
 * Type-B: Oplev centering and covering in SR3.  * Type-B: Oplev centering and covering in SR3, necessary for also SR2.
Line 38: Line 38:
 * Adjusted the heater control in IY. The drift of F0 is large due to the air conditioning in EX.

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2023/1/6 13:00-13:20

Participants: Takahashi, Uchiyama, Sato, Miyoki, Node, Ushiba, Ikeda, Aso, Akutsu, Hirata, Mitsuhashi

Acceptance check document

Status

  • Type-A: Heater control in IY.
  • Type-B: Oplev centering and covering in SR3, necessary for also SR2.
  • Type-Bp:
  • Type-C:

Other items

  • Oplev: SR3
  • ACC: Evaluation in IX/IY.
  • Commissioning:
  • Vacuum system:
  • Heater control: Adjustment in IY
  • TMS:

Discussion


VIS Meeting

Date: 2023/1/6 13:30-

Participants:

Summary Report

Type-A

  • Adjusted the heater control in IY. The drift of F0 is large due to the air conditioning in EX.

Type-B

Type-Bp

Type-C

Electronics

Control

Schedule

  • Type-A: Investigation of ACCs.
  • Type-B/Bp: Vertical sensor correction.
  • Type-C:

Safety

Discussion

Travel Plans

(Date in Kamioka)

The week from 1/9

  • Takahashi: 1/11-13
  • Hirata: 1/12-13
  • Mitsuhashi: 1/11-13

Next meeting

  • 2023/1/13(FRI) 13:30-

KAGRA/Subgroups/VIS/VISMinutes20220106 (last edited 2023-01-06 13:39:32 by RyutaroTakahashi)