* Adjusted the height of ETMY. The F1 damper was set in a gap of 2mm. * Repaired the actuator coil of ACC #3 in EY. Investigated the noise level of the accelerometers in IY. |
Contents
Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2022/1/28 13:00-
Participants:
Schedule
- IX: Health check. Glitch in the F3 signals. Windshield for the MN oplev.
- EX: Health check. Leake check on 1/25.
- IY:
- EY: Height adjustment on 1/25. Oplev setting on 1/26-27. Preparation for the accelerometers.
Status
- Replacement of flip cables: Type-C.
- TM height setting: ITMY.
- Oplev: Setup of the TM Oplev in IY after the TM alignment in late Feb.
- ACC: Preparation for EY.
- Commissioning in air: Return of GRY. Alignment of ETMY.
- Commissioning in vacuum:
- Overall commissioning:
- Acceptance check:
- PF actuator: At the in-vacuum commissioning.
- New vacuum pumps for V-chambers: EXV (transportation on 2/7, implementation on 2/8-11)
- Heater control: Test in IXV/EXV is planed. Power controller in IY.
- Power source for Oplev: IY.
- Tunnel for the IYC booth: Scheduled on 1/31.
- TMS: Scheduled on 2/14-16.
Discussion
VIS Meeting
Date: 2022/1/28 14:00-
Participants:
Summary Report
Type-A
- Adjusted the height of ETMY. The F1 damper was set in a gap of 2mm.
- Repaired the actuator coil of ACC #3 in EY. Investigated the noise level of the accelerometers in IY.
Type-B
Type-Bp
Type-C
Electronics
Control
Schedule
See Schedule
- Type-A team: Accelerometers in EY,
- Type-B team:
Safety
Discussion
Travel Plans
(Date in Kamioka)
The week from 1/31
- Takahashi: 2/1-4
- Sato: 2/1-4
- Hirata: 2/1-4
The week from 2/7
- Takahashi: 2/8-10
- Sato: 2/8-10
- Hirata: 2/8-10
Next meeting