* Replacement of flip cables: OMM and OMC on 2/9. | * Replacement of flip cables: OMM/OMC on 2/9. IMM/IFI on 2/18. |
Contents
Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2022/2/18 13:00-
Participants:
Schedule
- IX: Glitch in the F3 signals. Windshield for the MN oplev. Cooling was started.
- EX: Health check. Feedthrough was repaired on 2/9-10.
- IY: Adjustment of IP and BF damper. Height measurement.
- EY: Preparation for the accelerometers.
Status
- Replacement of flip cables: OMM/OMC on 2/9. IMM/IFI on 2/18.
- TM height setting: ITMY.
- Oplev: Setup of the TM Oplev in IY after the TM alignment in late Feb.
- ACC: Preparation for EY.
- Commissioning in air: Return of GRY. Fluctuation of ETMY is large. MN oplev control is necessary.
- Commissioning in vacuum:
- Overall commissioning:
- Acceptance check:
- PF actuator: At the in-vacuum commissioning.
- New vacuum pumps for V-chambers: EXV (transportation on 2/7, implementation on 2/8-11)
- Heater control: Test in IXV/EXV.
- Power source for Oplev:
- TMS: Scheduled from 2/28. Leak test should be done beforehand.
Discussion
VIS Meeting
Date: 2022/2/18 14:00-
Participants:
Summary Report
Type-A
Type-B
Type-Bp
Type-C
Electronics
Control
Schedule
See Schedule
- Type-A team:
- Type-B team:
Safety
Discussion
Travel Plans
(Date in Kamioka)
The week from 2/21
- Hirata: 2/21-22
The week from 2/28
- Takahashi: 2/28-3/4
- Sato: 3/1-4
- Hirata: 3/1-4
Next meeting
- 2022/2/25(FRI)