* Acceptance check: | * Acceptance check: Cabling check [[https://paper.dropbox.com/doc/Type-A--BcnCcM6HDozH0Uux6HP115COAQ-rwdXT8vNuFVh77qYO0gCq|Type-A]]: Done (except EY,IY ACC) [[https://paper.dropbox.com/doc/Type-C--Bckc2MdjlSKbTMQ7PUVcPfF3AQ-ArV3HEOUwxjw4nfsZTeAa|Type-C]]: Done (Not replaced cross cable, IMMT1) |
Contents
Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2022/2/25 13:00-
Participants:
Schedule
- IX: Glitch in the F3 signals. Windshield for the MN oplev.
- EX: Health check.
- IY: Recovery of the IP.
- EY: Preparation for the accelerometers.
Status
- Replacement of flip cables: Stock of the feedthrough flange.
- TM height setting: ITMY.
- Oplev: Setup of the Oplev is planed in EY and IY.
- ACC: Installation was scheduled in the week of 2/28 in EY.
- Commissioning in air: Alignment of ITMY.
- Commissioning in vacuum:
- Overall commissioning:
- Acceptance check: Cabling check
Type-A: Done (except EY,IY ACC) Type-C: Done (Not replaced cross cable, IMMT1)
- PF actuator: At the in-vacuum commissioning.
- New vacuum pumps for V-chambers: Scheduled from 2/28 in EYV.
- Heater control: Test in IXV/EXV.
- Power source for Oplev: Check of ports is scheduled on 3/15.
- TMS: Installation of the balancer is scheduled in 2/28-3/1.
Discussion
VIS Meeting
Date: 2022/2/25 14:00-
Participants:
Summary Report
Type-A
Type-B
Type-Bp
Type-C
Electronics
Control
Schedule
See Schedule
- Type-A team: Installation of ACCs in EY.
- Type-B team:
Safety
Discussion
Travel Plans
(Date in Kamioka)
The week from 2/28
- Takahashi: 3/1-4
- Sato: 3/1-4
- Hirata: 3/1-4
The week from 3/7
- Takahashi: 3/8-11
- Sato: 3/8-11
- Hirata: 3/8-11
Next meeting
- 2022/3/4(FRI)