Differences between revisions 1 and 2
Revision 1 as of 2022-04-07 20:25:33
Size: 1578
Comment:
Revision 2 as of 2022-04-07 20:28:56
Size: 1554
Comment:
Deletions are marked like this. Additions are marked like this.
Line 26: Line 26:
 * Commissioning in air: Alignment of input beam.  * Commissioning in air:

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2022/4/8 13:00-

Participants:

Post O3 Upgrade portal

Schedule

  • IX:
  • EX:
  • IY: TM actuator(Magnet). H2 geophone(AA/ADC).
  • EY: TM actuator(Magnet?).
  • Type-B/Bp/C: Replacement of the feedthrough flange for MCO. MC suspensions. Power supply for PRM/PR3. SR2.

Status

  • Replacement of flip cables: Cables for TMS were ordered.
  • TM height setting: ITMY.
  • Oplev: EY.
  • ACC:
  • Commissioning in air:
  • Commissioning in vacuum:
  • Acceptance check:
  • PF actuator: At the in-vacuum commissioning.
  • New vacuum pumps for V-chambers: Opening of the GV in IXV/EXV.
  • Heater control: Test(IXV/EXV).
  • TMS:

Discussion


VIS Meeting

Date: 2022/4/8 14:00-

Participants:

Summary Report

Type-A

Type-B

Type-Bp

Type-C

Electronics

Control

Schedule

See Schedule

  • Type-A team:
  • Type-B team:

Safety

Discussion

  • Active isolation reserarch

Travel Plans

(Date in Kamioka)

The week from 4/11

  • Takahashi: 4/12-15
  • Sato: 4/12-15
  • Hirata: 4/12-15

The week from 4/18

  • Takahashi: 4/19-22
  • Sato: 4/19-22
  • Hirata: 4/19-22

Next meeting

  • 2022/4/15(FRI)

KAGRA/Subgroups/VIS/VISMinutes20220408 (last edited 2022-04-08 14:54:56 by RyutaroTakahashi)