Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2022/4/8 13:00-

Participants:

Post O3 Upgrade portal

Schedule

  • IX:
  • EX:
  • IY: TM actuator(Magnet). H2 geophone(AA/ADC).
  • EY: TM actuator(Magnet?).
  • Type-B/Bp/C: Replacement of the feedthrough flange for MCO. MC suspensions. Power supply for PRM/PR3. SR2.

Status

  • Replacement of flip cables: Cables for TMS were ordered.
  • TM height setting: ITMY.
  • Oplev: EY.
  • ACC:
  • Commissioning in air:
  • Commissioning in vacuum:
  • Acceptance check:
  • PF actuator: At the in-vacuum commissioning.
  • New vacuum pumps for V-chambers: Opening of the GV in IXV/EXV.
  • Heater control: Test(IXV/EXV).
  • TMS:

Discussion


VIS Meeting

Date: 2022/4/8 14:00-

Participants:

Summary Report

Type-A

  • Closed the ICF 203 flanges on the corrugate tube in IY.

Type-B

  • Checked the transfer functions in SR2.

Type-Bp

Type-C

  • Replaced the feedthrough flange for the MCO actuator.
  • Inspected the MCO suspension.

Electronics

Control

Schedule

See Schedule

  • Type-A team:
  • Type-B team:

Safety

Discussion

  • Active isolation reserarch

Travel Plans

(Date in Kamioka)

The week from 4/11

  • Takahashi: 4/12-15
  • Sato: 4/12-15
  • Hirata: 4/12-15

The week from 4/18

  • Takahashi: 4/19-22
  • Sato: 4/19-22
  • Hirata: 4/19-22

Next meeting

  • 2022/4/15(FRI)