Date: 2022/4/15 14:00- | Date: 2022/4/15 14:00-14:30 |
Line 39: | Line 39: |
Participants: | Participants: Takahashi, Ushiba, Fabian, Washimi, Tanaka, Uchiyama |
Line 65: | Line 65: |
* Type-B team: | * Type-B team: SR3 SF FR grounded problem. |
Contents
Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2022/4/15 13:00-13:50
Participants: Aso, Ushiba, Tomaru, Akutsu, Kimura, Ikeda, Miyoki, Takahashi, Sato, Hirata
Schedule
- IX: F0 overload
- EX:
- IY: Health check. Go to finalization (WAB, Frame adjustment).
- EY: TM actuator problem (flip cable, regluing of magnet).
- Type-B/Bp/C: BFH LVDT was recovered in PRM. Leak in IMC.
Status
- Replacement of flip cables: Cables for TMS were ordered. Feedthrough flange was replaced with the blank flange in OMC.
- TM height setting: ITMY.
- Oplev: Calibration in EY. Windshield in the next.
- ACC:
- Commissioning in air:
- Commissioning in vacuum:
- Acceptance check:
- PF actuator: At the in-vacuum commissioning.
- New vacuum pumps for V-chambers:
- Heater control: Test is pending.
- TMS: Pressure was increased in EXT.
Discussion
VIS Meeting
Date: 2022/4/15 14:00-14:30
Participants: Takahashi, Ushiba, Fabian, Washimi, Tanaka, Uchiyama
Summary Report
Type-A
- Recovery of the TM actuator in EY.
- Saturation of the F0 keystone height.
Type-B
Nothing
Type-Bp
- We replaced a broken LVDT in PRM. Namely, the one for the BF Damper horizontal LVDTs:
- In the old board, we measured the resistance values determining two gains, and copied them into the new board.
- After installing the new board, we adjusted the phases in order to achieve maximum output.
- Then, in order to calculate the new LVDT calibration factors, we measured the transfer functions from Y actuation to H1, H2 and H3 outputs, and compared with previous measurements.
- The DC amplitudes and phases of transfer functions are the same as before.
- Hirata-san continued working in the design of the Traverser limit switches. Differences between the real hardware and the 3D-CAD have made the process difficult, but he's now working on a final version. He has reported his work at the ATC-KAGRA meeting.
- Takahashi-san realized that the LVDT drivers used in PR3 and PRM are using a reference signal with an amplitude of 12 Vpp.
Type-C
Electronics
Control
Schedule
See Schedule
- Type-A team: Finalization of IY/EY.
- Type-B team: SR3 SF FR grounded problem.
Safety
Discussion
Travel Plans
(Date in Kamioka)
The week from 4/18
- Takahashi: 4/19-22
- Sato: 4/19-22
- Hirata: 4/19-22
The week from 4/25
- Takahashi: 4/25-28
- Sato: 4/25-28
- Hirata: 4/25-28
Next meeting
- 2022/4/22(FRI)