Line 59: Line 59:
 * Replaced the feedthrough flange with the blank flange in OMC.

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2022/4/15 13:00-13:50

Participants: Aso, Ushiba, Tomaru, Akutsu, Kimura, Ikeda, Miyoki, Takahashi, Sato, Hirata

Post O3 Upgrade portal

Schedule

  • IX: F0 overload
  • EX:
  • IY: Health check. Go to finalization (WAB, Frame adjustment).
  • EY: TM actuator problem (flip cable, regluing of magnet).
  • Type-B/Bp/C: BFH LVDT was recovered in PRM. Leak in IMC.

Status

  • Replacement of flip cables: Cables for TMS were ordered. Feedthrough flange was replaced with the blank flange in OMC.
  • TM height setting: ITMY.
  • Oplev: Calibration in EY. Windshield in the next.
  • ACC:
  • Commissioning in air:
  • Commissioning in vacuum:
  • Acceptance check:
  • PF actuator: At the in-vacuum commissioning.
  • New vacuum pumps for V-chambers:
  • Heater control: Test is pending.
  • TMS: Pressure was increased in EXT.

Discussion


VIS Meeting

Date: 2022/4/15 14:00-14:30

Participants: Takahashi, Ushiba, Fabian, Washimi, Tanaka, Uchiyama

Summary Report

Type-A

  • Recovery of the TM actuator in EY.
  • Saturation of the F0 keystone height.

Type-B

Nothing

Type-Bp

  • We replaced a broken LVDT in PRM. Namely, the one for the BF Damper horizontal LVDTs:
    • In the old board, we measured the resistance values determining two gains, and copied them into the new board.
    • After installing the new board, we adjusted the phases in order to achieve maximum output.
    • Then, in order to calculate the new LVDT calibration factors, we measured the transfer functions from Y actuation to H1, H2 and H3 outputs, and compared with previous measurements.
    • The DC amplitudes and phases of transfer functions are the same as before.
  • Hirata-san continued working in the design of the Traverser limit switches. Differences between the real hardware and the 3D-CAD have made the process difficult, but he's now working on a final version. He has reported his work at the ATC-KAGRA meeting.
  • Takahashi-san realized that the LVDT drivers used in PR3 and PRM are using a reference signal with an amplitude of 12 Vpp.

Type-C

  • Replaced the feedthrough flange with the blank flange in OMC.

Electronics

Control

Schedule

See Schedule

  • Type-A team: Finalization of IY/EY.
  • Type-B team: SR3 SF FR grounded problem.

Safety

Discussion

Travel Plans

(Date in Kamioka)

The week from 4/18

  • Takahashi: 4/19-22
  • Sato: 4/19-22
  • Hirata: 4/19-22

The week from 4/25

  • Takahashi: 4/25-28
  • Sato: 4/25-28
  • Hirata: 4/25-28

Next meeting

  • 2022/4/22(FRI)

KAGRA/Subgroups/VIS/VISMinutes20220415 (last edited 2022-04-15 17:57:25 by RyutaroTakahashi)