<> = Agenda/Minutes = [[https://zoom.us/j/203743987|Zoom Meeting]] ---------- = CRY+VIS Interface Meeting = Date: 2022/5/6 13:00-14:00 Participants: Takahashi, Node, Kimura, Uchiyama, Aso, Akutsu, Ushiba [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Upgrades/PostO3Upgrades|Post O3 Upgrade portal]] == Schedule == * IX: F3 GAS glitch. * EX: * IY: Finalization. Height adjustment. Health check. Cabling check. H2 geophone noise. Thermometer. * EY: Finalization. Health check. IM V3 cabling. BF LVDT noise. Cabling check (P7-2 upperside). ADC noise on MN/IM PS. * Type-B: Health check in SR3. Calibration of geophone in SR2. Stand-alone SM driver for SR3. * Type-Bp: Traverser limit SW. FC onto PRM. * Type-C: OMC installation from 5/23. == Status == * Replacement of flip cables: Cables for TMS. * TM height setting: ITMY. * Oplev: Windshield in the next. * ACC: * Commissioning in air: * Commissioning in vacuum: * Acceptance check: Review from 5/13. * PF actuator: At the in-vacuum commissioning. * New vacuum pumps for V-chambers: How to treat thermal load? * Heater control: Pending. * TMS: Thermometer * Cryo-shield: Finnese measurement, height check --> Cooler ON. == Discussion == ---------- = VIS Meeting = Date: 2022/5/6 14:00-14:10 Participants: Takahashi, Washimi, Uchiyama, Aso, Ushiba == Summary Report == === Type-A === * Height adjustment of ITMY/ETMY. === Type-B === * TF measurement in SR3. === Type-Bp === * Preparation for the traverser limit switches. === Type-C === === Electronics === === Control === == Schedule == See [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/VIS/Schedule|Schedule]] * Type-A: Finalization in IY/EY. * Type-B/Bp/C: FC onto PRM, Alignment of SR3/OMMC. == Safety == == Discussion == == Travel Plans == (Date in Kamioka) The week from 5/9 * Takahashi: 5/9-13 * Sato: 5/9-13 * Hirata: 5/9-13 The week from 5/16 * Takahashi: 5/17-20 * Sato: 5/17-20 * Hirata: 5/17-20 == Next meeting == * 2022/5/13(FRI)