Contents
Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2022/5/13 13:00-
Participants:
Schedule
- IX:
- EX:
- IY: Finalization. Health check. ADC noise.
- EY: Finalization. Health check. ADC noise. BF LVDT noise. Cabling repair (P7-2).
- Type-B: Calibration of geophone in SR2. Stand-alone SM driver for SR3.
- Type-Bp: FC onto PRM. Traverser limit SW.
- Type-C: OMC installation from 5/23. Health check of OMMT1/2/OSTM.
Status
- Replacement of flip cables: Replaced for TMS in EY.
- TM height setting:
- Oplev: Windshield in the next.
- ACC:
- Commissioning in air:
- Commissioning in vacuum:
- Acceptance check: Review from 5/13.
- PF actuator: At the in-vacuum commissioning.
- New vacuum pumps for V-chambers: How to treat thermal load?
- Heater control: Pending.
- TMS: Thermometer
Cryo-shield: Finnese measurement, height check --> Cooler ON.
Discussion
VIS Meeting
Date: 2022/5/13 14:00-
Participants:
Summary Report
Type-A
- Replaced the main card of the LVDT driver for the BF damper in EY.
- Repaired the cabling for the thermometer in EY.
- Closed four feedthrough flanges in EY and two ones in IY.
- Replaced the HPCD for the IP in IY
Type-B
Type-Bp
Type-C
Electronics
Control
Schedule
See Schedule
- Type-A: Review of IY and EY.
- Type-B/Bp/C:
Safety
Discussion
Travel Plans
(Date in Kamioka)
The week from 5/16
- Takahashi: 5/17-20
- Sato: 5/16-20
- Hirata: 5/17-20
The week from 5/9
- Takahashi: 5/9-13
- Sato: 5/9-13
- Hirata: 5/9-13
Next meeting
- 2022/5/20(FRI)