Date: 2022/5/20 14:00- Date: 2022/5/20 14:00-14:20
Line 17: Line 17:
Participants: Participants: Takahashi, Fabian, Uchiyama, Washimi, Ushiba, Aso, Tanaka, Tomaru
Line 27: Line 27:
Line 44: Line 45:
 * Type-B/Bp/C:  * Type-B/Bp/C: Calibration in SR. FC for BS. Cable check in PR. Installation of OMC.

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2022/5/20 13:00-

Review of IY and EY

Dropbox paper


VIS Meeting

Date: 2022/5/20 14:00-14:20

Participants: Takahashi, Fabian, Uchiyama, Washimi, Ushiba, Aso, Tanaka, Tomaru

Summary Report

Type-A

  • Disassembled the footholds around the top chamber in EY.
  • Review of IY and EY.

Type-B

  • SR2 geophone calibration: I found an error in my script, and now I'm getting more reasonable results. See the klog.
  • In SR2, I calculated inter-calibration factors between geophones and LVDTs. See the klog for details.

Type-Bp

  • Measured the transfer functions of the PR suspensions.
  • We installed new cable clamp boards, and clamped the cables such that no connectors were hanging.
  • We installed the limit switches for the Traverser in PRM.
    • We still need to connect them to the drivers, but we don't have the drivers yet.
    • We should check the health of the cables we clamped on the new boards. We don't have a date to do this work yet.
    • We should decide a date to test the limit switches, but I guess that depends on when the drivers will become available.

Type-C

  • Installed the repaired high power coil driver to the OMMT1.

Electronics

Control

Schedule

See Schedule

  • Type-A: Monitoring of the evacuation in IY/EY.
  • Type-B/Bp/C: Calibration in SR. FC for BS. Cable check in PR. Installation of OMC.

Safety

Discussion

Travel Plans

(Date in Kamioka)

The week from 5/23

  • Takahashi: 5/23-26
  • Sato: 5/24-27
  • Hirata: 5/23-27
  • Aso: 5/23-26

The week from 5/30

  • Takahashi: 5/30-6/3
  • Sato: 5/30-6/3
  • Hirata: 5/30-6/3

Next meeting

  • 2022/5/27(FRI)