Line 8: | Line 8: |
Date: 2022/5/20 13:00- === Review of IY and EY === [[https://paper.dropbox.com/folder/show/AcceptanceTest-e.1gg8YzoPEhbTkrhvQwJ2zzo3dHVh5sJGieDgbm2n3h60mGqotBeE|Dropbox paper]] |
|
Line 11: | Line 15: |
Date: 2022/5/20 14:00- | Date: 2022/5/20 14:00-14:20 |
Line 13: | Line 17: |
Participants: | Participants: Takahashi, Fabian, Uchiyama, Washimi, Ushiba, Aso, Tanaka, Tomaru |
Line 17: | Line 21: |
* Disassembled the footholds around the top chamber in EY. * Review of IY and EY. |
|
Line 18: | Line 25: |
* SR2 geophone calibration: I found an error in my script, and now I'm getting more reasonable results. See the klog. * In SR2, I calculated inter-calibration factors between geophones and LVDTs. See the klog for details. |
|
Line 19: | Line 29: |
* Measured the transfer functions of the PR suspensions. * We installed new cable clamp boards, and clamped the cables such that no connectors were hanging. * We installed the limit switches for the Traverser in PRM. * We still need to connect them to the drivers, but we don't have the drivers yet. * We should check the health of the cables we clamped on the new boards. We don't have a date to do this work yet. * We should decide a date to test the limit switches, but I guess that depends on when the drivers will become available. |
|
Line 20: | Line 37: |
* Installed the repaired high power coil driver to the OMMT1. |
|
Line 26: | Line 45: |
* Type-B/Bp/C: | * Type-B/Bp/C: Calibration in SR. FC for BS. Cable check in PR. Installation of OMC. |
Line 36: | Line 55: |
* Sato: 5/23-27 | * Sato: 5/24-27 |
Contents
Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2022/5/20 13:00-
Review of IY and EY
VIS Meeting
Date: 2022/5/20 14:00-14:20
Participants: Takahashi, Fabian, Uchiyama, Washimi, Ushiba, Aso, Tanaka, Tomaru
Summary Report
Type-A
- Disassembled the footholds around the top chamber in EY.
- Review of IY and EY.
Type-B
- SR2 geophone calibration: I found an error in my script, and now I'm getting more reasonable results. See the klog.
- In SR2, I calculated inter-calibration factors between geophones and LVDTs. See the klog for details.
Type-Bp
- Measured the transfer functions of the PR suspensions.
- We installed new cable clamp boards, and clamped the cables such that no connectors were hanging.
- We installed the limit switches for the Traverser in PRM.
- We still need to connect them to the drivers, but we don't have the drivers yet.
- We should check the health of the cables we clamped on the new boards. We don't have a date to do this work yet.
- We should decide a date to test the limit switches, but I guess that depends on when the drivers will become available.
Type-C
- Installed the repaired high power coil driver to the OMMT1.
Electronics
Control
Schedule
See Schedule
- Type-A: Monitoring of the evacuation in IY/EY.
- Type-B/Bp/C: Calibration in SR. FC for BS. Cable check in PR. Installation of OMC.
Safety
Discussion
Travel Plans
(Date in Kamioka)
The week from 5/23
- Takahashi: 5/23-26
- Sato: 5/24-27
- Hirata: 5/23-27
- Aso: 5/23-26
The week from 5/30
- Takahashi: 5/30-6/3
- Sato: 5/30-6/3
- Hirata: 5/30-6/3
Next meeting
- 2022/5/27(FRI)